Permit Information
Permit NumberBLD07-00986
StatusFinaled
Name MCALVAIN CONSTRUCTION INC
Site Address 3629 W BANNER AVE
Project NameVIBRAPRO 2
Customer Number 
ePlanReviewNo
Description
VibraPro2 Office and Manufacturing Building - To construct a new 11,250 square foot, two story, pre-engineered metal office and manufacturing building and relate site improvements. This building was reviewed as non-separated uses. There are no fire sprinklers. First Floor: 9,800 sq. ft. (1,500 sq. ft. of office and 8,300 sq. ft. of manufacturing and storage) Second Floor: 1,450 sq. ft. office. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD3/5/20083/5/20083/31/2008 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Second Notice BLD1/9/20081/9/20083/5/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 11/16/20071/9/2008 DONE
BLD-Final11/15/200711/16/200711/16/2007PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/15/2007 at 8:05:12 AM. Contact: ###-####.
Permanent Occupancy UNPAID FEE  11/16/2007 DONE
Temporary Occupancy11/13/20072/11/200811/13/2007 DONE
BLD-Final11/7/200711/9/200711/9/2007APART
DetailsJim Storey
howard Phone #: ###-#### need ada 7-9 tolitet papper/ saftey glazing doors.
Code Occupancy Approval11/9/200711/9/200711/9/2007PPASS
DetailsScott M.Brown
OK FOR FINAL
Code Occupancy Approval11/9/200711/9/200711/9/2007PCANC
DetailsScott M.Brown
OK FOR FINAL
PubWorks Occupancy Approval11/8/200711/8/200711/8/2007 DONE
Recieved letter from engineer stating project was built as per plans. Final inspection D. Erskine.
FIRE-Final Inspection11/5/200711/7/200711/7/2007APASS
DetailsForrest France
Access gates approved per FD, door hardware at the main entry/exit installed while on site, life safety inspection completed acceptable per site visit by K. Roule.
FIRE-Conference10/30/200710/31/200710/31/2007ADONE
DetailsTroy Cobbley
I went over life safety requirements with the builder. He stated that he was going to install two vehicle gates. One on the south side of the building and the other on the north. I told him he needs fire dept approval for this. I told him about none hardened locks and the opticom systems.
BLD-Other10/30/200710/31/200710/31/2007ACANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/30/2007 at 2:46:02 PM. Contact: ###-####.
BLD-Other10/29/200710/30/200710/30/2007PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/29/2007 at 11:48:04 AM. Contact: ###-####.ceilling ok pending others/ need 4 wall clips/fire stopping.
BLD-Wall cover10/22/200710/23/200710/23/2007APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/22/2007 at 12:39:43 PM. Contact: ###-####. c/n idems ok
BLD-Wall cover10/18/200710/18/200710/18/2007PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/18/2007 at 10:55:18 AM. Contact: ###-####. relocate heater box to exterior wall or reinspect for wall gyp protection/ top of first floor needs fire safing gyp atchment ok can verify at ceilling grid insp/ gas piping pending mech.
BLD-Framing/Rough-in10/16/200710/17/200710/17/2007APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/12/2007 at 2:52:59 PM. Contact: ###-####.engineering and ec report archived.
BLD-Framing/Rough-in10/15/200710/16/200710/16/2007PDEFR
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/12/2007 at 2:52:59 PM. Contact: ###-####.
BLD-Framing/Rough-in10/12/200710/15/200710/15/2007PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/12/2007 at 2:52:59 PM. Contact: ###-####.
BLD-Concrete10/4/200710/5/200710/8/2007PPART
DetailsJim Storey
howard rebar - 2nd floor Phone #: ###-#### need engineering for floor change. si on site
BLD-Foundation8/29/20078/30/20078/30/2007PPASS
DetailsJim Storey
rebar; Ben; Phone #: ###-#### Internet Inspection Request from: Hattie James
BLD-Footing8/6/20078/7/20078/7/2007PPASS
DetailsJim Storey
ben Phone #: ###-####
(F) Reprint permit  7/18/2007  
Issue PAID IN FULL permit  7/13/2007 DONE
Telephone call  6/21/2007 DONE
t/c w clinton yaka at ###-#### - permit ready and fees given - also need ACHD receipt
Permit Ready to Issue  6/21/2007  
Print Occupancy Form  6/20/2007 DONE
Plan assigned to (JCM)4/19/2007 6/19/2007 PASS
6/19/2007 16:20:37 JCM - activity updated through activity BLDA022 from case BLD07-00986.
Routing - FIRE6/18/2007 6/19/2007 PASS
Attached updated review comments to plans.
Telephone call  6/19/2007 PEND
Awaiting resubmitted civil sheet showing 2nd fire hydrant.
Plan resubmittals received  6/19/2007  
Received 1 cover transmittal, 1 response letter for fire from Lochsa Engineering (1PG), 3 copies of sheet C2.01 and taken to John Menard
Routing - PLAN CHECK6/19/2007 6/19/2007 PASS
PLANS/APPL TAKEN TO FRONT DESK  6/19/2007 DONE
Routing - PLAN CHECK5/23/2007 6/18/2007 PASS
Plan Reviewer's activity  6/18/2007 PASS
Inserted revised plans, reviewed and approved structural and nonstructural revisions.
Plan resubmittals received  6/14/2007 DONE
received 1 transmittal, and 1 copy of sheets S0.1,S0.2S1.01,S1.02S-8 taken to John M.
Plan resubmittals received  6/13/2007 DONE
received 1 transmittal,and 2 copys of sheets A1.1,A1.2 taken to John M.
Plan resubmittals received  6/5/2007 DONE
received 1 transmittal,1 fire code response,1 bld comments response,2 plan check review comments/ structural calcs1 copy of sheets S-8,S0.1,S0.2,S0.3,S1.01,S1.02,S2.01,S2.02,S2.03,S2.03,S2.04,S2.05 AND 2 copys of sheets A1.1,A1.2,A1.4,A4.1,A7.2 taken to John M.
Routing - PLAN CHECK5/9/2007 5/23/2007  
Routing - PUBLIC WORKS5/23/2007 5/23/2007 PASS
Routing PW Sewer Rating5/23/2007 5/23/2007 PASS
No sewer available, requires a Wet Line Waiver to be returned to Public Works before issuing the Building permit. Can contact sewer rating at ###-####.
Routing PW Drainage5/23/2007 5/23/2007 PASS
Routing - PUBLIC WORKS4/20/2007 5/23/2007 PASS
Routing PW Drainage4/20/2007 5/23/2007 PASS
Contact Brian Murphy ###-####
Routing PW Sewer Design4/24/2007 5/23/2007 PASS
ok, no sewer, requires a Wet Line Waiver
Routing - FIRE5/8/2007 5/9/2007 FAIL
Emailed and faxed resubmittal items to architect. Attached review comments to plans.
1st review completed  5/9/2007 FAIL
Plan resubmittals requested  5/8/2007 DONE
e-mailed the architect with a copy of the plan review requesting revisions.
Routing - PLAN CHECK5/4/2007 5/8/2007 FAIL
John Menard
Routing - PLANNING4/30/2007 5/4/2007 PASS
DRH07-00074 Greg Johnson
Routing - PLUMBING4/27/2007 4/30/2007 PASS
per plans and 2003 upc
Plan resubmittals requested  4/30/2007 DONE
Faxed the architect a copy of the comment list from the consulting structural eingineer requesting revisions.
Routing Off Site - STRUCTURAL4/19/2007 4/27/2007 FAIL
Received comment list from the consulting structural engineer requesting revisions.
Routing - Erosion and Sediment4/24/2007 4/27/2007 PASS
ESC plan approved with attached conditions.
Routing PW Street Lights4/24/2007 4/25/2007 PASS
Routing - PLANNING Land Div4/19/2007 4/20/2007 PASS
Telephone call  4/19/2007  
called action couriers for pick up to off site engineering
Application received  4/19/2007  
Pending Assignment by MYS4/19/2007 4/19/2007 DONE
4/19/2007 10:39:33 JCM - activity updated through activity BLDA166 from case BLD07-00986.
Plans ACCEPTED BY PLAN TECH  4/19/2007  
Recd Pcfee & Taken To Pln CK  4/19/2007 DONE
Plan routing begun/NEW & ADDTN  4/19/2007