BLD-Final | 1/9/2008 | 1/10/2008 | 1/10/2008 | A | PASS |
Jim Sly
|
|
|
dane Phone #: ###-####
|
DOC - Permit Finaled | 1/10/2008 | 1/10/2008 | 1/10/2008 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 1/8/2008 | 1/8/2008 | 1/8/2008 | P | NH |
Jim Sly
|
|
|
dane Phone #: ###-#### Need Fire Final
|
BLD-Energy code compliance | 9/19/2007 | 9/19/2007 | 9/19/2007 | P | PASS |
Jim Sly
|
|
|
dane Phone #: ###-####
|
Override - Parcel Holds | 9/19/2007 | 1/1/1900 | 9/19/2007 | | |
|
|
|
eng
|
BLD-Foundation | 6/4/2007 | 6/5/2007 | 6/5/2007 | A | PASS |
Jim Sly
|
|
|
lito; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD-Footing | 6/1/2007 | 6/4/2007 | 6/4/2007 | A | PASS |
Jim Sly
|
|
|
leto; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD-Wall cover | 5/17/2007 | 5/17/2007 | 5/17/2007 | P | PART |
Jim Sly
|
|
|
LITO nOTE; BASEMENT WALL; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles BSMT Wall ok
|
BLD-Footing | 5/14/2007 | 5/14/2007 | 5/14/2007 | P | PART |
Mike Jordan
|
|
|
lito; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. wip.
|
Telephone call | | | 5/9/2007 | | DONE |
|
|
|
left vm for dane barlow at ###-#### - permit ready and fees given
|
Override - Parcel Holds | | | 5/9/2007 | | |
|
|
|
|
Permit Ready to Issue | | | 5/9/2007 | | |
|
|
|
|
Override - Parcel Holds | | | 5/9/2007 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/9/2007 | | DONE |
|
|
|
|
Plan resubmittals received | | | 5/8/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/8/2007 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 5/8/2007 | | |
|
|
|
|
Inspection Record Card- Bld | | | 5/8/2007 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/8/2007 | | 5/8/2007 | | PASS |
|
|
|
Corrections noted on plans and also shear plan was recieved from builder.
|
Routing - FIRE | 5/4/2007 | | 5/8/2007 | | PASS |
|
|
|
This house is required to be fitted with an NFPA 13D automatic fire sprinkler system. (Cascading Meadows)
|
Telephone call | | | 5/4/2007 | | DONE |
|
|
|
Called applicant and explained redlinned corrections over the phone. I encouraged him to look at plans before taking them to make sure he understood all notations. Also I requested resubmittals on shear and basement wall.
|
Plan assigned to (TLW) | 5/4/2007 | | 5/4/2007 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 5/4/2007 | | |
|
|
|
|
Pending Assignment by SRZ | 4/25/2007 | | 5/4/2007 | | DONE |
|
|
|
5/4/2007 11:01:07 TLW - activity updated through activity BLDA185 from case BLD07-01041.
|
Plan resubmittals requested | | | 5/4/2007 | | DONE |
|
|
|
Need a basement wall cross-section, and Shear drawn on plans. Applicant will sumit these as soon as he can.
|
Routing - PUBLIC WORKS | 4/26/2007 | | 4/26/2007 | | PASS |
|
|
|
|
Routing - PLANNING | 4/25/2007 | | 4/26/2007 | | PASS |
|
|
|
See redlines on site plan. Corrected setbacks for future reference. Driveway can only be 33' wide.
|
Routing - Addressing | 4/25/2007 | | 4/25/2007 | | PASS |
|
|
|
|
Application received | | | 4/25/2007 | | |
|
|
|
|