Letter of compliance/Occupancy | | | 6/1/2018 | | DONE |
|
|
|
|
BLD-Aging Inspection | 9/23/2009 | 9/23/2009 | 9/24/2009 | | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 9/24/2009 | 9/24/2009 | 9/24/2009 | P | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 2/27/2008 | 2/28/2008 | 2/28/2008 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
FIRE-Final Inspection | 2/13/2008 | 2/14/2008 | 2/15/2008 | A | NR |
Forrest France
|
|
|
Need shell permit final.
|
BLD-Final | 12/7/2007 | 12/7/2007 | 12/10/2007 | P | NR |
Dave Hannah
|
|
|
todd Phone #: ###-#### need to finiah front door
|
FIRE-Final Inspection | 12/7/2007 | 12/7/2007 | 12/7/2007 | P | PART |
Forrest France
|
|
|
Temp. occupancy approval pending shell final.
|
FIRE-Final Inspection | 12/6/2007 | 12/6/2007 | 12/6/2007 | P | FAIL |
Forrest France
|
|
|
Need project related fire sprinkler permit issued and requested for inspection, also pending shell and core life safety finals, noted corridor needs to be clear of storage and obstructions, doors on self closers must not be blocked open.
|
BLD-Final | 12/5/2007 | 12/5/2007 | 12/5/2007 | P | NR |
Dave Hannah
|
|
|
Todd; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt still needs other trades to signoff
|
FIRE-Final Inspection | 12/4/2007 | 12/5/2007 | 12/5/2007 | P | FAIL |
Forrest France
|
|
|
Noted missing exit sign at one location, exit discharge light at the north exit is not functional, main entry exit access controls are not complete, project related fire alarm permit needs finaled, also need building shell and core finals prior to TI, noted the corridor and lobby area is not rated as constructed (plans indicate one hour rating).
|
FIRE-Final Inspection | 12/3/2007 | 12/4/2007 | 12/4/2007 | A | FAIL |
Forrest France
|
|
|
Project is not ready for final fire life safety inspection due to jobsite conditions, the project related fire alarm permit work also failed inspection.
|
FIRE-Final Inspection | 11/30/2007 | 12/3/2007 | 12/3/2007 | A | NR |
Forrest France
|
|
|
Pending fire alarm permit finals.
|
BLD-Framing/Rough-in | 11/5/2007 | 11/6/2007 | 11/6/2007 | A | PART |
Dave Hannah
|
|
|
Justin Trash shute Phone #: ###-#### ok to cover lid
|
BLD-Conference | 11/1/2007 | 11/1/2007 | 11/2/2007 | P | PART |
Dave Hannah
|
|
|
justin Phone #: ###-#### trash room
|
BLD-Framing/Rough-in | 10/29/2007 | 10/30/2007 | 10/30/2007 | P | PASS |
Dave Hannah
|
|
|
justin Phone #: ###-#### front entry way ceiling ok to cover
|
BLD-Energy code compliance | 9/25/2007 | 9/26/2007 | 9/26/2007 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/25/2007 at 4:10:58 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 9/20/2007 | 9/21/2007 | 9/24/2007 | A | PART |
Dave Hannah
|
|
|
JUSTIN Phone #: ###-#### ok to cover ground floor entry way
|
BLD-Framing/Rough-in | 7/26/2007 | 7/27/2007 | 7/27/2007 | A | PART |
Dave Hannah
|
|
|
jerry Phone #: ###-#### framing ok ok to one side but need to patch fire proofing on beams and colunms first
|
Issue PAID IN FULL permit | | | 7/13/2007 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/11/2007 | | |
|
|
|
|
Telephone call | | | 7/11/2007 | | DONE |
|
|
|
left vm for darrell richards at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 7/11/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/10/2007 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/25/2007 | | 7/10/2007 | | PASS |
|
|
|
(6-27-07) Finished the resubmittal review. Revised drawings required. Architect E-mailed. (7-10-07) Completed the resubmittal review. Drawings approved.
|
Plan assigned to (CJW) | 5/9/2007 | | 7/10/2007 | | PASS |
|
|
|
7/10/2007 13:56:32 CJW - activity updated through activity BLDA022 from case BLD07-01082.
|
Plan resubmittals received | | | 7/6/2007 | | |
|
|
|
Received transmittal and two copies of page E0.2 and M1.0; taken to Carl Westfall
|
Plan resubmittals received | | | 6/21/2007 | | |
|
|
|
Received response letter and two copies of pages E0.2, A3.0, A8.2, M1.0; taken to Carl Westfall
|
1st review completed | | | 5/25/2007 | | FAIL |
|
|
|
|
Routing - FIRE | 5/24/2007 | | 5/25/2007 | | PASS |
|
|
|
Attached IFC review comments to plans.
|
Routing - PLAN CHECK | 5/9/2007 | | 5/24/2007 | | FAIL |
|
|
|
The IBC plan review was started on May, 23, 2007 and was finished the next day. Revised drawings were required. See the plan review report.
|
Routing - PUBLIC WORKS | 5/9/2007 | | 5/9/2007 | | PASS |
|
|
|
|
Routing PW Sewer Rating | 5/9/2007 | | 5/9/2007 | | PASS |
|
|
|
|
Pending Assignment by MYS | 4/30/2007 | | 5/9/2007 | | DONE |
|
|
|
5/9/2007 10:23:37 MYS - activity updated through activity BLDA172 from case BLD07-01082.
|
(F) Reprint permit | | | 5/9/2007 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/1/2007 | | |
|
|
|
|
Application received | | | 4/30/2007 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/30/2007 | | |
|
|
|
|
First Notice | 9/24/2009 | 9/24/2009 | | | |
Dave Hannah
|
|
|
|