Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD07-01102
StatusFinaled
Name EKC INC
Site Address 4355 W EMERALD ST Unit: 140
Project NameEMERALD SQUARE
Customer Number 
ePlanReviewNo
Description
(IDAHO CYTOGENETICS DIAGNOSTIC LABORATORY - EMERALD SQUARE - SUITE 140) The remodel an existing 1,923 sq. ft. tenant space for use as a diagnostic lab. Work includes select interior demolition within the tenant space; two new openings for doors into the existing 1-hour rated exit corridor and openings in 2nd floor and roof for installation of a rooftop MUA & exhaust systems. Plans indicate a 1-hour shaft enclosure, from top of second floor to bottom of roof the roof deck will enclose the new ductwork. To construct new interior non-bearing walls to create staff work and support areas; new offices, breakroom and support areas; two, 20 minute self-closing smoke & fire doors, frames and hardware assemblies into new openings into the existing 1-hr exit corridor. To install suspended ceiling grid system, light fixtures and mechanical diffusers; install two chemical exhaust hoods; a new opening at first floor and roof for MUA & exhaust systems enclosed with a designated 1-hour shaft; upgrade electrical, plumbing and mechanical. A emergency power system is being installed as part of this permit (Sheet A1.01).drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Meeting  2/27/2009 DONE
Details
no final cert of value ever received - signed off per RAD
Third Notice BLD6/6/20086/6/200812/12/2008 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Second Notice BLD4/23/20084/23/20086/6/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 3/31/20084/23/2008 DONE
Permanent Occupancy  3/31/2008  
BLD-Final3/24/20083/25/20083/25/2008APASS
DetailsTom Arcoraci
rob Phone #: ###-####
BLD-Final3/18/20083/19/20083/19/2008PPASS
DetailsTom Arcoraci
ROB Phone #: ###-####
FIRE-Final Inspection3/18/20083/19/20083/19/2008APASS
DetailsTroy Cobbley
life safety passed. Structural inspector to please verify that the suite number 140 has been installed instead of the 120.
BLD-Other3/13/20083/13/20083/13/2008PPASS
DetailsTom Arcoraci
rob Note: ceiling Phone #: ###-####
BLD-Other2/29/20082/29/20082/29/2008PPASS
DetailsTom Arcoraci
Rob, shaft wall for mechnical duct work; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD-Framing/Rough-in1/2/20081/3/20081/3/2008PPART
DetailsTom Arcoraci
rob Phone #: ###-#### walls ok
Expiration Notice11/8/200712/3/200712/7/2007 DONE
DetailsMarsha Smylie
Issue PAID IN FULL permit  11/9/2007 DONE
Telephone call  10/31/2007  
left mess for gregg allen at ###-#### that permit is ready & need the r/p & gc.
Telephone call  9/25/2007 DONE
left vm for john day at ###-#### - permit ready and fees given - also need gc name, rce# and rp name
Permit Ready to Issue  9/25/2007 DONE
Routing - PLAN CHECK9/24/2007 9/24/2007 PASS
Plans approved by plumbing. Assembling attachments to plans and taking to permit desk to be issued.
PLANS/APPL TAKEN TO FRONT DESK  9/24/2007 PASS
Print Occupancy Form  9/24/2007 DONE
Routing - PLUMBING9/19/2007 9/24/2007 PASS
Plans approved with conditions noted above - Per Plans - Spec's - 2003 UPC.
Plan assigned to (DRS)5/9/2007 9/24/2007 PASS
9/24/2007 09:29:54 DRS - activity updated through activity BLDA022 from case BLD07-01102.
Routing - PLAN CHECK7/2/2007 9/19/2007 PEND
Re-routing plans back to Planning anf then to Plumbing for re-review for code & ordinance compliance.
Routing - PLAN CHECK9/19/2007 9/19/2007 PEND
Routing to plumbing for re-review.
Routing - PLANNING9/19/2007 9/19/2007 PASS
Plan resubmittals received  9/17/2007 DONE
received 1 transmittal letter,1 resopnse letter,1 water saver faucet company sheet, and 2 copys of sheets A0.01,A1.01,A2.01,A2.02,A2.03,A2.04,P1.01,M1.02 inserted into plans and taken back to Dan S.
Telephone call  9/7/2007 DONE
Call to John Day, architect to see when resubs will be turned in. Next week he said.
Routing - PLANNING6/29/2007 7/2/2007 FAIL
Sarah Schafer. Above ground propane tank in front and new generator on east side.

Spoke with John Day from Hummel Architects. Project will need a zoning certificate for the propane tank. Applicant should pay particular attention to the screening of the tank from the Emerald Street frontage.
Routing - PLAN CHECK6/29/2007 6/29/2007 FAIL
Plans have above ground propane tank and emergency generator. Plan was not originally to route to planning. I talked with Sarah Schafer on 6/11 or 6/12 and explained to her what was indicated on plans and ask if she wanted them routed to her. She said yes. Plans were routed back to me from fire code review and placed by my box. I failed to catch that they had not gone to planning. Routing plans to Sara Schafer with note..
1st review completed  6/14/2007 FAIL
Routing - FIRE6/11/2007 6/14/2007 PASS
Attached IFC review comments to plans.
Plan resubmittals requested  6/11/2007 DONE
Copy of plan review e-mailed to architect for response resubmittals.
Routing - PLAN CHECK5/21/2007 6/11/2007 FAIL
Resubmittals required. E-mailed copy of plan review report to John Day for response. Plans to fire code analyst.
Routing - PLUMBING5/9/2007 5/21/2007 FAIL
ceiling space is a return air plenum, no plastic piping. isolate wate to the labs, provide a location with drainage for hot and cold water R.P.s.
Routing - PUBLIC WORKS5/9/2007 5/9/2007 PASS
Pending Assignment by MYS5/2/2007 5/9/2007 DONE
5/9/2007 11:05:23 MYS - activity updated through activity BLDA168 from case BLD07-01102.
Routing PW Sewer Rating5/9/2007 5/9/2007 PASS
Plans ACCEPTED BY PLAN TECH  5/2/2007  
Need G.C. RCE number
Application received  5/2/2007  
Recd Pcfee & Taken To Pln CK  5/2/2007 DONE