BLD-Final | 12/6/2007 | 12/6/2007 | 12/7/2007 | P | PASS |
Mike Jordan
|
|
|
ok for perm occ.
|
Letter of compliance | | | 12/7/2007 | | DONE |
|
|
|
Cert. of Compliance issued 12-7-07
|
BLD-Final | 11/28/2007 | 11/28/2007 | 11/28/2007 | P | PART |
Mike Jordan
|
|
|
Gary Phone #: ###-####. Will issue leteer of compliance for shell once final aff.letter from special insp. agency is received and a tempered window is installed at breakroom.
|
Code Occupancy Approval | 11/28/2007 | 11/28/2007 | 11/28/2007 | P | PASS |
Scott M.Brown
|
|
|
OK FOR FINAL
|
BLD-Grading Inspection | 11/27/2007 | 11/28/2007 | 11/28/2007 | A | DEFR |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Gary Band Shoud have called for P/W.
|
BLD-Final | 11/26/2007 | 11/27/2007 | 11/27/2007 | P | NR |
Mike Jordan
|
|
|
Also need to schedule same inspection for the t.i., which is permit # BLDO7-01151 Phone #: ###-#### Internet Inspection Request from: Gary Band
|
FIRE-Final Inspection | 11/26/2007 | 11/27/2007 | 11/27/2007 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Energy code compliance | 11/1/2007 | 11/2/2007 | 11/2/2007 | A | PASS |
Mike Jordan
|
|
|
gary Phone #: ###-####
|
BLD-Energy code compliance | 10/31/2007 | 10/31/2007 | 10/31/2007 | P | PART |
Mike Jordan
|
|
|
Stiil needs to complete lateral bracing. insul ok.
|
BLD-Energy code compliance | 10/30/2007 | 10/31/2007 | 10/31/2007 | A | CANC |
Mike Jordan
|
|
|
gary Phone #: ###-####
|
BLD-Framing/Rough-in | 10/29/2007 | 10/30/2007 | 10/30/2007 | A | PART |
Mike Jordan
|
|
|
gary Phone #: ###-####. Needs to complete lateral bracing, and repair cut studs. ok to insul, Nees to call in ti for framing.
|
BLD-Other | 10/22/2007 | 10/23/2007 | 10/23/2007 | P | PASS |
Mike Jordan
|
|
|
jerry Note: nail roofing late as possible Phone #: ###-####. Remainder of nailing for roof diaphragm.
|
BLD-Other | 10/17/2007 | 10/18/2007 | 10/18/2007 | A | PART |
Mike Jordan
|
|
|
gary - roof nailing inspection Phone #: ###-####. Nailing on roof diaphragm.
|
BLD-Framing/Rough-in | 9/28/2007 | 10/1/2007 | 10/1/2007 | A | CANC |
Mike Jordan
|
|
|
gary - continuous wall inspection Phone #: ###-####. Canc. by contractor via phone.
|
BLD-Other | 9/25/2007 | 9/26/2007 | 9/26/2007 | A | PASS |
Mike Jordan
|
|
|
gary - continuous wall Phone #: ###-####
|
Plan Reviewer's activity | | | 9/26/2007 | | DONE |
|
|
|
Debbie with magic valley trucking called in about changing roof pitch from 3.5 / 12 to a 4 / 12. After checking with her original reviewer John Menard and DRH supervisor Sarah Schaffer. They both were ok with the change. Requiring only resubmitted sheets showing new roof pitch. On sept. 26, 2007 revised A2.0, A2.1, A2.2, and A2.3 sheets were submitted and incerted into shell plans.
|
BLD-Framing/Rough-in | 9/19/2007 | 9/20/2007 | 9/20/2007 | P | PART |
Mike Jordan
|
|
|
gary Phone #: ###-####.. CMU wall, sw end top of wall, wip, installing verts.
|
BLD-Framing/Rough-in | 9/14/2007 | 9/17/2007 | 9/17/2007 | A | DEFR |
Mike Jordan
|
|
|
gary Phone #: ###-####. Special insp.
|
BLD-Wall cover | 8/7/2007 | 8/8/2007 | 8/8/2007 | P | CANC |
Mike Jordan
|
|
|
Paul ; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Wall cover | 8/7/2007 | 8/8/2007 | 8/8/2007 | A | PART |
Mike Jordan
|
|
|
paul Note: wall insp Phone #: ###-####. wip. reviewed approved plans. Special insp on conc. and rebar.
|
BLD-Footing | 8/6/2007 | 8/7/2007 | 8/7/2007 | A | PART |
Mike Jordan
|
|
|
paul - pour at 10:00 Phone #: ###-####. Approved plans not on job site. Contacted contractor, boted that footing will have special insp. Noted to contractor to have approved plans on site for stemwall placement.
|
(F) Reprint permit | | | 7/20/2007 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 7/19/2007 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/18/2007 | | DONE |
|
|
|
|
Telephone call | | | 7/18/2007 | | DONE |
|
|
|
left vm for dion zimmerman at ###-#### - permit ready and fees given - also need receipt for ACHD
|
Permit Ready to Issue | | | 7/18/2007 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 7/16/2007 | | 7/17/2007 | | PASS |
|
|
|
|
Routing PW Sewer Rating | 7/17/2007 | | 7/17/2007 | | PASS |
|
|
|
|
Routing PW Solid Waste | 7/17/2007 | | 7/17/2007 | | PASS |
|
|
|
|
Routing - FIRE | 7/17/2007 | | 7/17/2007 | | PASS |
|
|
|
Attached updated review comments to plans.
|
Routing - PLAN CHECK | 7/17/2007 | | 7/17/2007 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/17/2007 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 5/7/2007 | | 7/17/2007 | | PASS |
|
|
|
7/17/2007 15:25:48 JCM - activity updated through activity BLDA022 from case BLD07-01138.
|
Routing - PLAN CHECK | 6/12/2007 | | 7/16/2007 | | PASS |
|
|
|
Reviewed and approved resubmittals.
|
Plan resubmittals received | | | 7/13/2007 | | |
|
|
|
received 3 copys of sheets AC2.0 taken to John M.
|
Routing Off Site - STRUCTURAL | 6/26/2007 | | 7/2/2007 | | PASS |
|
|
|
Called Action Courier for pick up on 6/26/07 @ 11:53am BAS - REceived letter from consultlng structural engineer approving resubmittals.
|
Plan resubmittals received | | | 6/22/2007 | | |
|
|
|
Received 1 copy of response comments from GJZ Architecture (2 pgs), 1 copy of flow Info from United Water (2pgs), 1 copy of plot plan, 1 copy of response comments from Holladay Engineering Co (2 pgs), 1 set of Addendum to structural calculations (21 pgs) 3 copies of sheets G-1.0, L-1.0, S-1.0, S-1.2, A-1.0, A-2.1, A-2.2, A-2.3, A-3.0, A-4.1 and taken to John Menard///6/22/07 BAS
|
1st review completed | | | 6/12/2007 | | FAIL |
|
|
|
|
Routing - FIRE | 6/8/2007 | | 6/12/2007 | | FAIL |
|
|
|
Faxed and emailed fire code resubmittal items to archteict.
|
Routing - PLAN CHECK | 5/21/2007 | | 6/8/2007 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 6/8/2007 | | DONE |
|
|
|
E-mailed the architect a copy of the plan review requesting revisions.
|
Plan resubmittals requested | | | 5/22/2007 | | DONE |
|
|
|
Faxed the architect a copy of the structural plan review requesting revisions.
|
Routing Off Site - STRUCTURAL | 5/8/2007 | | 5/22/2007 | | FAIL |
|
|
|
Called Action Couriers for pick up - Received comment list from the consulting structural engineer requesting revisions.
|
Routing - PLANNING | 5/16/2007 | | 5/21/2007 | | PASS |
|
|
|
Greg J.
|
Routing - PLUMBING | 5/10/2007 | | 5/16/2007 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 5/10/2007 | | 5/10/2007 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 5/8/2007 | | 5/10/2007 | | FAIL |
|
|
|
|
Routing PW Sewer Rating | 5/9/2007 | | 5/10/2007 | | PASS |
|
|
|
FEES ASSESSED ON TENANT IMPROVEMENT PLANS
|
Routing PW Solid Waste | 5/9/2007 | | 5/10/2007 | | FAIL |
|
|
|
The minimum interior enclosure dimensions are 11' wide x 8' deep with gates that open 180 degrees along the 11' dimension. These are requirements for automated trash service. Need revised pg. C2.0 showing enclosure with proper dimensions, plus a detail of trash enclosure construction.
|
Routing PW Sewer Design | 5/9/2007 | | 5/9/2007 | | PASS |
|
|
|
|
Routing PW Street Lights | 5/9/2007 | | 5/9/2007 | | PASS |
|
|
|
|
Routing PW Drainage | 5/9/2007 | | 5/9/2007 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 5/8/2007 | | 5/8/2007 | | PASS |
|
|
|
|
Application received | | | 5/7/2007 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/7/2007 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 5/7/2007 | | |
|
|
|
|