Third Notice BLD | 8/8/2007 | 8/8/2007 | 10/2/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 7/23/2007 | 7/23/2007 | 8/8/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 7/12/2007 | 7/12/2007 | 7/23/2007 | | DONE |
Mike Jordan
|
|
|
|
BLD-Final | 7/12/2007 | 7/12/2007 | 7/12/2007 | P | PASS |
Mike Jordan
|
|
|
brad; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
|
DOC - Permit Finaled | 7/12/2007 | 7/12/2007 | 7/12/2007 | P | PASS |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 7/12/2007 | 7/12/2007 | 7/12/2007 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
BLD-Final | 7/11/2007 | 7/11/2007 | 7/11/2007 | P | NR |
Mike Jordan
|
|
|
brad; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang. Needs others to final. Also needs elec. permit.
|
BLD-Final | 7/3/2007 | 7/5/2007 | 7/5/2007 | P | NR |
Mike Jordan
|
|
|
brad; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang. Still need fire/life/safety. Appears that sprinkler plans were submitted today.
|
BLD-Final | 6/28/2007 | 6/29/2007 | 6/29/2007 | A | NR |
Mike Jordan
|
|
|
brad Phone #: ###-####. Needs fire.
|
Inspection Record Card- Bld | | | 6/20/2007 | | DONE |
|
|
|
|
Telephone call | | | 6/20/2007 | | DONE |
|
|
|
left vm for brad birkinbine at ###-#### - permit ready and fees given - also need gc name and rce#
|
Permit Ready to Issue | | | 6/20/2007 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/20/2007 | | |
|
|
|
|
Routing - PLAN CHECK | 6/15/2007 | | 6/19/2007 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/19/2007 | | DONE |
|
|
|
|
Plan assigned to (R_H) | 5/10/2007 | | 6/19/2007 | | PASS |
|
|
|
6/19/2007 14:59:40 RMH - activity updated through activity BLDA022 from case BLD07-01139.
|
Routing - FIRE | 6/15/2007 | | 6/15/2007 | | PASS |
|
|
|
Attached IFC review comments to plans.
|
Meeting | | | 6/13/2007 | | DONE |
|
|
|
Onsite meeting by fire sprinkler contractor and fire sprinkler plans reviewer (Johnson Consulting), to evaluate the existing racking and proposed new racking systems. The city is awaiting a proposed fire sprinkler protection design for the new racking system from the fire sprinkler contractor for re-evaluation.
|
Plan Reviewer's activity | | | 6/7/2007 | | PEND |
|
|
|
Racking plans on hold until verification of existing fire protection system is verified by onsite visit to Lithia Ford. Fire Sprinkler plan reviewer and fire protection contractor representative to perform onsite visit to verify existing rack system configuration and corresponding fire sprinkler design.
|
Routing - FIRE | 5/31/2007 | | 6/4/2007 | | FAIL |
|
|
|
Emailed and faxed review comments to Engineer and Owner. Attached review comments to plans.
|
1st review completed | | | 6/4/2007 | | FAIL |
|
|
|
|
Case Summary (BLD) | | | 5/31/2007 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/10/2007 | | 5/31/2007 | | PASS |
|
|
|
|
Pending Assignment by MYS | 5/7/2007 | | 5/10/2007 | | DONE |
|
|
|
5/10/2007 11:11:46 MYS - activity updated through activity BLDA175 from case BLD07-01139.
|
Plans ACCEPTED BY PLAN TECH | | | 5/8/2007 | | |
|
|
|
|
Application received | | | 5/7/2007 | | |
|
|
|
|