Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD07-01149
StatusFinaled
Name JUAN OLEAGA
Site Address 673 N 27TH ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To move an existing 2574 s.f. Two story Single family dwelling from 2612 State street to 2703 W. Woodlawn, pour 193 lineal feet of new Basement foundation (1260 s.f. Unfinished) per approved plans, all red-lining, and Plan review report. Separate permits will be required for electrical, plumbing, and heating. Inspections are required prior to Occupancy. Existing Dwelling will need to be brought up to code in accordance with Inspection record MIS07-00075. A $10,000.00 dollar bond is on file to bring up to code per approved plans and requirements from inspector. ANY ADDITION OR ALTERATIONS TO STRUCTURE WILL NEED A SEPERATE BUILDING PERMIT. R-2 zoning district, building setbacks, and ROS07-19 per Planning and Zoning. (SRZ)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  7/10/2008 DONE
DetailsSam Zahorka
Recieved a telephone call from Regina Cunningham with ACHD. She was told by Jaun Olega that he is not going to convert this single family dwelling into an office until a later time. Regina requested that the City of Boise contact her or require a signature signoff when this dwelling is converted to an office through our department. Regina's telephone number is ###-####. Email: rcunning@achd.ada.id.us
BLD-Final6/18/20086/19/20086/19/2008APASS
DetailsDave Hannah
Juan Phone #: ###-####
DOC - Permit Finaled6/19/20086/19/20086/19/2008PPASS
DetailsDave Hannah
BLD-Final6/4/20086/5/20086/5/2008AFAIL
DetailsDave Hannah
juan Phone #: ###-#### needs smokes upstairs insulate basement ceiling film glass by front door
BLD-Conference5/8/20085/8/20085/8/2008ADONE
DetailsDave Hannah
Dave we received a compliant that this house has been converted to an office without proper permits can you please verify. Call Rita or Sam if you have questions. ###-#### or ###-####.
Case Summary (BLD)  5/8/2008 DONE
Telephone call  5/8/2008 DONE
DetailsSam Zahorka
Recieved a telephone call from Regina at ACHD. She explained that this structure after being moved will actually be an Office (Commercial Occupancy). I then called the owner Juan Olega and requested he come to the city and obtain the correct permits. He stated he would come into the city next week. I offered to help him obtain the correct applications. (SRZ)
Case Summary (BLD)  2/21/2008  
Case Summary (BLD)  10/16/2007  
BLD-Foundation7/30/20077/30/20077/30/2007PPASS
DetailsDave Hannah
scott
BLD-Footing7/20/20077/23/20077/23/2007PPART
DetailsDave Hannah
scott; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
Issue PAID IN FULL permit  5/25/2007 DONE
(F) Reprint permit  5/25/2007 DONE
Case Summary (BLD)  5/23/2007  
Inspection Record Card- Bld  5/23/2007  
Plan assigned to (SRZ)5/11/20075/11/20075/22/2007 PASS
5/22/2007 13:30:19 SRZ - activity updated through activity BLDA022 from case BLD07-01149.
Pending Assignment by SRZ5/17/2007 5/22/2007 DONE
Routing - PLAN CHECK5/22/2007 5/22/2007 PASS
Case Summary (BLD)  5/22/2007  
PLANS/APPL TAKEN TO FRONT DESK  5/22/2007 DONE
One set Approved. (SRZ)
Routing - PUBLIC WORKS5/17/2007 5/17/2007 PASS
Recorded utility easement received by Public Works. Inst. #107070794
Routing - PLAN CHECK5/11/2007 5/11/2007 PEND
Failed Plan review.
Foundation/Basement plans have to meet current adopted building codes (2003 IRC). Recieved Updated information to complete Plan review. (SRZ)
Routing - PUBLIC WORKS5/10/2007 5/11/2007 FAIL
Recorded sanitary sewer easement is required with new recorded Lot split showing sanitary easement.Applicant to supply copy of recorded to easement to Public Works. Contact Sewer Deisgn for requirements for easement. ###-####
Routing - PLANNING5/8/2007 5/10/2007 PASS
Ros07-00019 Sue Hansen.
Routing - Addressing5/7/2007 5/8/2007 PASS
Application received  5/7/2007