Third Notice BLD | 9/22/2008 | 9/22/2008 | 12/24/2008 | | DONE |
Cathy Brown
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 8/11/2008 | 8/11/2008 | 9/22/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 7/14/2008 | 8/11/2008 | | DONE |
|
|
|
|
Permanent Occupancy | | | 7/14/2008 | | DONE |
|
|
|
|
BLD-Final | 7/10/2008 | 7/11/2008 | 7/11/2008 | P | PASS |
Jim Storey
|
|
|
Theron Phone #: ###-####
|
BLD-Final | 7/9/2008 | 7/10/2008 | 7/10/2008 | A | CANC |
Jim Storey
|
|
|
Darren Phone #: ###-#### Inspection cancelled from web by: Patricia Smith
|
FIRE-Final Inspection | 6/24/2008 | 6/25/2008 | 6/25/2008 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection passed.
|
FIRE-Final Inspection | 6/23/2008 | 6/23/2008 | 6/23/2008 | P | NR |
Forrest France
|
|
|
Fire life safety final cannot be completed until project related alarm and sprinkler permits are finaled-see details listed in FIR permit activities for specific items remaining.
|
BLD-Aging Inspection | 6/12/2008 | 6/12/2008 | 6/12/2008 | | NR |
Jim Storey
|
|
|
pending check out counter to be supplied by owner for ada complance.
|
BLD-Final | 3/12/2008 | 3/12/2008 | 3/12/2008 | P | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 3/12/2008 at 8:40:13 AM.
|
Code Occupancy Approval | 3/12/2008 | 3/12/2008 | 3/12/2008 | P | PASS |
Joe R Venneman
|
|
|
Meets requirements under this permit. Landscaping, parking, exterior, all good to go
|
Code Occupancy Approval | | | 3/12/2008 | | DONE |
|
|
|
Meets requirements under BLD07-01188
|
BLD-Framing/Rough-in | 3/4/2008 | 3/5/2008 | 3/5/2008 | A | PART |
Jim Storey
|
|
|
joe - ceiling Phone #: ###-#### ceilling ok need to spot check hvac supply defusers for wire support.
|
BLD-Framing/Rough-in | 1/30/2008 | 1/31/2008 | 1/31/2008 | A | PART |
Mike Jordan
|
|
|
joe Phone #: ###-####. Steel stud framing for soffit at main enterance area. pend. other trades ri insp.
|
BLD-Energy code compliance | 1/29/2008 | 1/29/2008 | 1/29/2008 | P | PASS |
Jim Storey
|
|
|
joe - insulation Phone #: ###-#### fur out of cmu walls insulation ok
|
(F) Reprint permit | | | 1/23/2008 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 1/18/2008 | 1/18/2008 | 1/18/2008 | P | PASS |
Jim Storey
|
|
|
joe Phone #: ###-#### interior walls ok
|
BLD-Framing/Rough-in | 1/3/2008 | 1/3/2008 | 1/3/2008 | P | PASS |
Jim Storey
|
|
|
joe Phone #: ###-#### exterior fur out framing in progess ok to cover as progration to back side of bld.
|
BLD-Other | 12/21/2007 | 12/21/2007 | 12/21/2007 | P | PART |
Jim Storey
|
|
|
joe - decking Phone #: ###-#### pending rfi for colm/at massonary exterior wall detail missing continuity per steel details.
|
BLD-Footing | 10/11/2007 | 10/11/2007 | 10/11/2007 | P | PART |
Jim Storey
|
|
|
joe - before 3:00 if possible - concrete coming Phone #: ###-#### south and west ft ok to be placed with si 10/12 pending report.
|
(F) Reprint permit | | | 10/1/2007 | | |
|
|
|
|
(F) Reprint permit | | | 10/1/2007 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/28/2007 | | DONE |
|
|
|
|
Plan resubmittals received | | | 9/18/2007 | | |
|
|
|
received letter of transmittal from ehm engineers & "2" sheets of C4.O, C5.O--plans taken to John Menard
|
Print Occupancy Form | | | 9/17/2007 | | DONE |
|
|
|
|
Telephone call | | | 9/17/2007 | | DONE |
|
|
|
t/c w craig ames at ###-#### - permit ready and fees given - also need gc name, rce#, rp and ACHD receipt
|
Permit Ready to Issue | | | 9/17/2007 | | DONE |
|
|
|
|
Routing - PLUMBING | 9/12/2007 | | 9/13/2007 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 9/13/2007 | | 9/13/2007 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 9/13/2007 | | PASS |
|
|
|
Reviewed civil plans and approved revised civil plans, I also requested an additional set of revised civil plans for the office copy.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/13/2007 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 5/14/2007 | | 9/13/2007 | | PASS |
|
|
|
9/13/2007 14:37:04 JCM - activity updated through activity BLDA022 from case BLD07-01188.
|
Routing PW Sewer Design | 5/17/2007 | | 9/12/2007 | | PASS |
|
|
|
Requires separate sewer plan submittal to Public Works for sewer reroute, vacate existing easement and obtain new easement
|
Routing - PLAN CHECK | 6/29/2007 | | 9/12/2007 | | |
|
|
|
|
Routing - PUBLIC WORKS | 9/12/2007 | | 9/12/2007 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 7/24/2007 | | PEND |
|
|
|
Inserted resubmitted plans and reviewed revisions. Everything is acceptable, but waiting for revised Civil plans for final Building, Plumbing and Public Works reviews.
|
Plan resubmittals received | | | 7/20/2007 | | |
|
|
|
received letter of transmittal for thornton oliver keller & project start up for special inspections (5 pages). pima technical bulletin 105 (5) pages & "2" sets of plans each sheet including A4.2, A4.3, A5.O, A5.2, A6.1, A7.1, S101, S1O2, S2O1, S2O2, S3O1, S5O1, S5O2, (S7O1, S7O1 in one set of plans), PO.1, P1.O, P2.O, MO.1, MO.2, M1.O, DX1.O, EO.1, E1.O, E1.1, E2.O, E2.1, E3.O, E4.O, E5.O, SE1.O--plans taken to John Menard
|
1st review completed | | | 6/29/2007 | | FAIL |
|
|
|
|
Routing - FIRE | 6/27/2007 | | 6/29/2007 | | PASS |
|
|
|
Attached IFC review comments to plans.
|
Routing - PLAN CHECK | 6/6/2007 | | 6/27/2007 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 6/27/2007 | | |
|
|
|
E-mailed the architect a copy of the plan review requesting revisions. JCM
|
Routing - PLANNING | 5/29/2007 | | 6/6/2007 | | PASS |
|
|
|
DRH06-00489-Greg Johnson
|
Routing - PLUMBING | 5/22/2007 | | 5/29/2007 | | FAIL |
|
|
|
provide a drain to accept the full discharge of the main service r.p. or install a dcva. show sewer connection to main. complete public works review prior to plumbing review.
|
Routing PW Solid Waste | 5/16/2007 | | 5/25/2007 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 5/14/2007 | | 5/24/2007 | | PASS |
|
|
|
Called Action Courier for pick up on 5/14/07 @ 10:54am BAS - Received letter from consulting structural engineer approving structural review.
|
Routing - Erosion and Sediment | 5/21/2007 | | 5/22/2007 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing PW Sewer Rating | 5/18/2007 | | 5/21/2007 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 5/16/2007 | | 5/21/2007 | | FAIL |
|
|
|
|
Routing PW Street Lights | 5/18/2007 | | 5/18/2007 | | PASS |
|
|
|
|
Routing PW Drainage | 5/16/2007 | | 5/17/2007 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 5/14/2007 | | 5/16/2007 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/11/2007 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/11/2007 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 5/11/2007 | | |
|
|
|
|
Application received | | | 5/10/2007 | | |
|
|
|
|