Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD07-01229
StatusFinaled
Name ST LUKES REGIONAL MEDICAL CENTER LT
Site Address 300 E JEFFERSON ST
Project NameST LUKES MOB-1ST FLR
Customer Number 
ePlanReviewNo
Description
(JMOP - ST LUKES MOB - 1ST FLR) 4/25/08 - PLAN MODIFICATION. AREA OF INTERIOR DEMOLITION EXPANDED; RELOCATION OF EXAM AND SUPPORT AREAS, MODIFICATION OF ACCESSIBLE RESTROOMS; LOBBY / WAITING / RECEPTION AREA & COUNTERS CHANGED AND INSTALLED AUTOMATIC SLIDING DOOR WITH BREAK-AWAY IN DIRECTION OF EGRESS TO SEPARATE THE ELEVATOR LOBBY FROM THE MEDICAL OFFICE, ALL PER MODIFIED PLANS, RED-LINE NOTES THEREON AND ATTACHED PLAN REVIEW CONDITIONS. drs NOTE: Building is fully sprinklered to allow additional story increase (3rd floor) and to substitute for 1-hour corridor requirements. To remodel within an existing 2,040 sq. ft. medical office suite. Scope of work includes select interior demolition in south side medical office suite; wall construction to infill abandoned door openings, create new exam rooms and access hall, a closet and one fully accessible restroom; create a nurse station and modify electrical, mechanical, plumbing, sprinkler and alarms systems as needed to meet tenant needs and to comply with current adopted codes and ordinances. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD8/11/20088/11/20089/4/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 7/23/20088/11/2008 DONE
Permanent Occupancy  7/23/2008 DONE
DetailsBarbara Stitt
BLD-Final5/8/20085/9/20085/9/2008APASS
DetailsDave Hannah
jay Phone #: ###-#### ok for perm occ
Print Occupancy Form  5/8/2008 DONE
Override - Parcel Holds  5/8/2008  
Override - Parcel Holds  5/8/2008  
Permit Ready to Issue  5/8/2008 DONE
(F) Reprint permit  5/8/2008 DONE
CHANGE STATUS TO (ISS)  5/8/2008 DONE
Plan modification issued
Routing - PLAN CHECK5/5/2008 5/7/2008 PASS
DetailsDan Stuart
Resubmittal from architect attached to plans. To permit desk to issue.
Telephone call  5/7/2008 DONE
Call to Dana Kauffman, architect. Said the resubmittals are ready and will be delivered today or tommorrow.
Plan resubmittals received  5/7/2008 DONE
received 2 comments and 2 copies of sheet E5.1 taken to Dan S.
PLANS/APPL TAKEN TO FRONT DESK  5/7/2008 PASS
Routing - FIRE5/1/2008 5/5/2008 PASS
DetailsScott Arellano
Plan Mod. See fire plan review notes for changes.
Routing - PUBLIC WORKS4/29/2008 5/1/2008 PASS
DetailsBeverly Hall
Plan Modification
Routing PW Sewer Rating4/30/2008 4/30/2008 PASS
DetailsConnie Baumgartner
Routing - PLAN CHECK4/28/2008 4/29/2008 FAIL
DetailsDan Stuart
Resubmittals required. Copy of plans review e-mailed & faxed to architect. Routing to PW for fee review and then to fire code analyst for re-review.
Plan assigned to (DRS)4/28/20084/28/20084/28/2008 DONE
DetailsDan Stuart
Plan Modification Accepted  4/28/2008 DONE
DetailsDan Stuart
Plan modification for BLD07-01229 for main lobby renovation and exam rooms layout re-arrangement-submitted sheets A0.1, A1.0, A2.0, A4.0, A4.1, A3.0, A5.0, ID-1.0, ID-1.1, P0.0, P1.0, P2.0, P2.1, M1.0, M2.0, FP1.0, E1.0, E2.1, E3.1, E4.1, E5.1, E6.0, E6.1, E6.2 and taken to Dan Stuart 4-28-08 @ 10:45am BAS
BLD-Final4/16/20084/17/20084/17/2008APART
DetailsDave Hannah
jay Phone #: ###-####ok for temp occ need asbuilt plans resubmittals
FIRE-Final Inspection4/16/20084/16/20084/16/2008PPASS
DetailsForrest France
Corrections verified for completion, fire life safety finaled, no inspection card on site for signature.
FIRE-Final Inspection4/8/20084/9/20084/9/2008AFAIL
DetailsTroy Cobbley
Provide emergency lighting throughout the central lobby area/waiting area as discussed. Provide resubmitted floor plans if required by the structural inspector. All other items are passed.
BLD-Framing/Rough-in12/4/200712/4/200712/4/2007PPART
DetailsDave Hannah
jay Phone #: ###-####ok to cover ceiling
BLD-Framing/Rough-in11/14/200711/15/200711/15/2007APART
DetailsDave Hannah
jay Phone #: ###-#### ok to cover walls
Issue & PRINT to be Invoiced  9/18/2007 DONE
Telephone call  9/17/2007  
left vm for curtis at st lukes ###-#### - permit ready and fees given
Permit Ready to Issue  9/17/2007 DONE
Routing - PLAN CHECK9/13/2007 9/14/2007 PASS
Plans to permit desk to issue.
PLANS/APPL TAKEN TO FRONT DESK  9/14/2007 PASS
Print Occupancy Form  9/14/2007 DONE
Plan assigned to (DRS)5/23/2007 9/14/2007 PASS
9/14/2007 06:40:18 DRS - activity updated through activity BLDA022 from case BLD07-01229.
Routing - PLUMBING9/11/2007 9/13/2007 PASS
per plans and 2003 upc
Routing - Erosion and Sediment9/11/2007 9/12/2007 PASS
No ESC permit required.
Routing - PLAN CHECK6/21/2007 9/11/2007 PEND
Resubmittals of 9/11/07 inserted into plans by permit desk personel. Resubmittals reviewed for corrections per plan review of 6/20/07. No additional resubmittals required. routing plans to ESC and then to plumbing for re-review.
Plan resubmittals received  9/11/2007  
Recieved erosion and sediment control permit and waiver request, two copies of response letter, and three copies of pages A0.0, A1.1, A2.1, A2.2, A8.1, M0.0, M1.0, P1.0; inserted into plans
1st review completed  6/21/2007 FAIL
Routing - FIRE6/20/2007 6/21/2007 PASS
Attached IFC Comments to plans.
Routing - PLAN CHECK6/1/2007 6/20/2007 FAIL
Resubmittals required. Copy of review to Tom Scofield. Routing to fire code analyst.
Plan resubmittals requested  6/20/2007 DONE
Copy of plan review faxed to architect for response.
Print Pending Permit.LaserJet4  6/20/2007  
Case Summary (BLD)  6/20/2007  
Routing - PLUMBING5/24/2007 6/1/2007 FAIL
provide plumbing plans
Routing - PUBLIC WORKS5/23/2007 5/24/2007 PASS
Routing PW Sewer Rating5/24/2007 5/24/2007 PASS
Pending Assignment by MYS5/15/2007 5/23/2007 DONE
5/23/2007 15:37:58 MYS - activity updated through activity BLDA168 from case BLD07-01229.
(F) Reprint permit  5/15/2007 DONE
Plans ACCEPTED BY PLAN TECH  5/15/2007  
Application received  5/15/2007