Third Notice BLD | 12/11/2007 | 12/11/2007 | 12/26/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Third Notice BLD | 12/11/2007 | 12/11/2007 | 12/26/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 11/19/2007 | 11/19/2007 | 12/11/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
Second Notice BLD | 11/19/2007 | 11/19/2007 | 12/11/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 11/5/2007 | 11/19/2007 | | DONE |
|
|
|
|
First Notice | | 11/5/2007 | 11/19/2007 | | DONE |
|
|
|
|
Permanent Occupancy UNPAID FEE | | | 11/5/2007 | | DONE |
|
|
|
|
FIRE-Final Inspection | 11/2/2007 | 11/2/2007 | 11/2/2007 | P | PASS |
Forrest France
|
|
|
Fire life safety finaled, occupancy card not available for signature per B. Smith.
|
BLD-Final | 10/17/2007 | 10/17/2007 | 10/17/2007 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 10/17/2007 | 10/18/2007 | 10/17/2007 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy is being issued with sam rogers permission until the room at the riser and facp is constructed within the next 60 days.
|
Temporary Occupancy UNPAID FEE | | | 10/17/2007 | | DONE |
|
|
|
|
Meeting | | | 10/16/2007 | | DONE |
|
|
|
SLR, JG, JB agreed to allow fire to approve for TOC of Applied Material tenant space prior to final approval of the shell sprinkler installation within the overbuild area, after all other fire requirements are satisfactorily completed.
|
FIRE-Final Inspection | 10/15/2007 | 10/16/2007 | 10/15/2007 | A | CANC |
Forrest France
|
|
|
bob - fire life safety Phone #: ###-#### Inspection cancelled from web by: Patricia Smith
|
BLD-Final | 10/11/2007 | 10/12/2007 | 10/12/2007 | P | CANC |
Jim Storey
|
|
|
william Phone #: ###-####
|
FIRE-Final Inspection | 10/11/2007 | 10/12/2007 | 10/12/2007 | A | FAIL |
Forrest France
|
|
|
Need building shell permit finals for BLD07-00349 and related fire sprinkler permit FIR07-00619(OH)/FIR07-00316(UG), door hardware at the second exit is not approved, tenant project related fire alarm permit FIR07-00673 and fire sprinkler permit FIR07-00718 need to be finaled prior to occupancy approval. NOTE: Tenant is in violation of IFC 2003 105.3.3. The permit area shall not be occupied prior to the issuance of a Certificate of Occupancy. Tenant needs to obtain a CO or TCO for legal occupancy of the building. Notified the general contractor and tenant representative of the situation. Correction notice left on site.
|
FIRE-Final Inspection | 10/11/2007 | 10/12/2007 | 10/12/2007 | A | CANC |
Troy Cobbley
|
|
|
william Phone #: ###-####
|
FIRE-Final Inspection | 10/8/2007 | 10/9/2007 | 10/9/2007 | A | FAIL |
Forrest France
|
|
|
Need shell permit final prior to TI finals, provide one additional PFE as discussed and per plan review annotations, provide approved door hardware at the second exit pair of doors south side, need to final project related fire sprinkler permit. NOTE: Tenant has occupied this space prior to the issuance of a certificate of occupancy.
|
BLD-Final | 10/8/2007 | 10/9/2007 | 10/9/2007 | P | CANC |
Jim Storey
|
|
|
bob Phone #: ###-####
|
Telephone call | | | 10/9/2007 | | |
|
|
|
Telcon from Forrest advising of continued fire life safety issues (2nd exit loced by card reader mag lock, lack of one PFE and continued lack of spk final of shell spk system) and that tenant has moved in without CO despite previous warnings to not do so. He advised tenant of illegal status of occupancy and noted it on his correction notice. I emailed J. Gilliland and D. Hanneman advising of situation.
|
Telephone call | | | 10/5/2007 | | DONE |
|
|
|
telcon from Carl Harrison with Applied Materials (###-####). He said he was told by GC Bob Smith that it is okay to move in on Monday (they have already moved in all their office furniture based on Bob's okay) but he's wondering why no CO card has been issued if it is okay to move in. Bob told him that he "had it covered."
I explained they do not have temporary occupancy approval and it can't be done by Monday because the sprinkler modifications which they installed without plans and hydraulic calculations have not been submitted and will require review and approval before we can approve the installation. I also reviewed status of FA and Bldg shell permits with him, which are also not ready to be finaled. Advised him that they do not have approval to occupy and it would be illegal if they moved in on Monday. Advised Bruce Chatterton of the situation, in Jenifer's absence.
|
Print Occupancy Form | | | 9/17/2007 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 8/23/2007 | 8/23/2007 | 8/23/2007 | P | PASS |
Jim Storey
|
|
|
bob Phone #: ###-#### ceilling ok
|
Issue PAID IN FULL permit | | | 7/9/2007 | | DONE |
|
|
|
|
Telephone call | | | 7/5/2007 | | DONE |
|
|
|
left vm for tom williams at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 7/5/2007 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/3/2007 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/3/2007 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 5/22/2007 | | 7/3/2007 | | PASS |
|
|
|
7/3/2007 16:05:00 CJW - activity updated through activity BLDA022 from case BLD07-01239.
|
Routing - PLAN CHECK | 6/25/2007 | | 7/3/2007 | | PASS |
|
|
|
Drawings approved after the resubmittal review.
|
Plan resubmittals received | | | 6/27/2007 | | |
|
|
|
Received 1 cover transmittal, 1 response letter from Stapley (1pg), revised structural calcs (6pgs), 2 copies of sheets A0.0, A1.1, A2.1, A6.1, A7.1 and taken to Carl Westfall
|
Routing - FIRE | 6/21/2007 | | 6/25/2007 | | PASS |
|
|
|
Attached review comments to plans.
|
1st review completed | | | 6/25/2007 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 5/31/2007 | | 6/21/2007 | | FAIL |
|
|
|
The IBC plan review was started on June 20, 2007 and was finished the next day. Revised drawings were required. See the plan review report.
|
Routing - PLANNING | 5/25/2007 | | 5/31/2007 | | PASS |
|
|
|
To Sarah Schafer - Greg Johnson requested all T.I. 's in this building be routed to DR Planning for Parking Analysis verification. (office vs. warehouse parking ratios)
Application meets parking requirements and is approved per DRH06-00277.
|
Early Start Permit | | | 5/30/2007 | | DONE |
|
|
|
per Marlene ok to do partial permit to allow rough in for plm.ele and mec. NO FRAMING allowed under this partial permit.rad
|
Telephone call | | | 5/30/2007 | | DONE |
|
|
|
Spoke with Bob Smith and told him that Partial early start permit is ready and no fees///5/30/07 @ 10:53am BAS
|
(F) Reprint permit | | | 5/30/2007 | | |
|
|
|
|
Routing PW Drainage | 5/24/2007 | | 5/24/2007 | | PASS |
|
|
|
|
Routing PW Sewer Rating | 5/24/2007 | | 5/24/2007 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 5/23/2007 | | 5/24/2007 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 5/23/2007 | | DONE |
|
|
|
PARTIAL PERMIT ISSUED ON 5/23/07 to allow rough in only of elect., plumbing, mech prior to full permit issuance. No framing inspection allowed. Request by owner/developer.
|
Pending Assignment by MYS | 5/18/2007 | | 5/22/2007 | | DONE |
|
|
|
5/22/2007 16:22:44 MYS - activity updated through activity BLDA172 from case BLD07-01239.
|
Plan resubmittals received | | | 5/21/2007 | | |
|
|
|
Received 3 copies of sheet EN0.0 and inserted into plans before taking to Marlene
|
Plan resubmittals received | | | 5/16/2007 | | |
|
|
|
Received 3 copies of letter regarding the parking analysis from TRW Architecture///5/16/07 BAS
|
Application received | | | 5/15/2007 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 5/15/2007 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/15/2007 | | DONE |
|
|
|
|