Permit Information
Permit NumberBLD07-01248
StatusFinaled
Name STEED CONSTRUCTION
Site Address 1649 W SHORELINE DR
Project NameAGC OFFICE BLDG
Customer Number 
ePlanReviewNo
Description
(Associated General Contractors Office - Shell & Core) - To construct a new 21,350 square foot, two story office shell and core building and related site improvements. The finished core areas include two exit stairways, two restrooms at each floor, elevator, mechanical, electrical and janitor closets, as well as, nonrated corridors at each floor level. This building will be constructed of concrete tilt-up exterior walls and steel frame second floor and roof construction. This building has four proposed future tenant spaces, two on each floor. This is a shell and core permit only and no occupancy is allowed under this permit. Separate tenant improvement permits will be required to finish this building for occupancy. This building is fully fire sprinkled. The sprinklers are used for area and story increases. This building was reviewed as nonseparated uses with a possible A Occupancy as controlling occupancy. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  11/13/2009  
spoke with Scott Raymes and he said plumbing final value is all Gorham's contract (incl. the mech permit for gas piping) and mechanical final value is all YMC's contract. RM mech. was a subcontractor of YMC. Called RM Mech and spoke with Allison that final value is the same. Unable to get final value for Paul Construction (
Third Notice 11/24/200911/12/2009 DONE
Telephone call  11/12/2009 DONE
DetailsTisha Gallop
called Scott Raymes/Steed Const. and left vm need clarification on final values per multi-contractors on plm and mech.
Third Notice 10/25/200911/10/2009 DONE
faxed
Second Notice 10/9/200910/15/2009 DONE
First Notice9/24/20099/24/20099/29/2009 DONE
DetailsDave Hannah
BLD-Aging Inspection9/23/20099/23/20099/24/2009 PASS
DetailsDave Hannah
DOC - Permit Finaled9/24/20099/24/20099/24/2009PPASS
DetailsDave Hannah
Letter of compliance  8/11/2008  

Letter of compliance  8/11/2008  
fees due for mech & ele
BLD-Final8/4/20088/4/20088/4/2008PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 8/4/2008 at 7:46:06 AM. Contact: ###-####.
BLD-Final7/17/20087/18/20087/18/2008APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 7/17/2008 at 4:06:57 PM. Contact: ###-####. needs to rock under stairs and add one hr door fix ada restroom get other trades to final
FIRE-Final Inspection7/16/20087/17/20087/17/2008PPASS
DetailsForrest France
Shell fire life safety inspection completed acceptable.
Code Occupancy Approval7/15/20087/15/20087/15/2008PPASS
DetailsMichael Garner
site inspection complete - I found that all work has been completed according to approved plans and permits - PASS
FIRE-Alarm Testing7/14/20087/15/20087/15/2008ACANC
DetailsForrest France
Duplicate inspection request-"alarm testing" is covered under project related FIR permits.
BLD-Other6/25/20086/26/20086/27/2008PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/25/2008 at 4:59:07 PM. Contact: ###-####.ceiling grid ok to cover halls
BLD-Conference6/17/20086/17/20086/17/2008PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/17/2008 at 7:29:34 AM. Contact: ###-####. fire caulk top of wall conf rm ok to cover
BLD-Conference6/2/20086/2/20086/2/2008PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/2/2008 at 7:55:08 AM. Contact: ###-####. ok to elev mec room lid
BLD-Conference5/29/20085/29/20085/29/2008APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/29/2008 at 6:15:13 AM. Contact: ###-####. doorways into conf room along 2hr wall ok to cover lids
BLD-Framing/Rough-in5/9/20085/12/20085/12/2008APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/9/2008 at 5:05:33 PM. Contact: ###-####.restroom and hall walls ok to cover
BLD-Framing/Rough-in5/8/20085/8/20085/9/2008PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/8/2008 at 8:22:39 AM. Contact: ###-####. ext framing ok to cover ext
BLD-Conference4/17/20084/17/20084/17/2008PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/17/2008 at 9:25:01 AM. Contact: ###-####.
BLD-Foundation2/7/20082/8/20082/8/2008PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 2/7/2008 at 4:50:43 PM. Contact: ###-####.
BLD-Footing2/1/20082/4/20082/4/2008APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/1/2008 at 2:21:42 PM. Contact: ###-####. east side
BLD-Concrete1/11/20081/14/20081/14/2008PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 1/11/2008 at 1:52:09 PM. Contact: ###-####. Conc. tilt panels, wip. Will receive special insp.
BLD-Concrete1/10/20081/11/20081/11/2008PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 1/10/2008 at 1:57:18 PM. Contact: ###-####.
BLD-Concrete11/30/200712/3/200712/3/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/30/2007 at 10:35:27 AM. Contact: ###-####. they will pour four pannels tomorrow mti will inspect rebar and test concrete
BLD-Footing10/5/200710/8/200710/8/2007APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/5/2007 at 3:32:15 PM. Contact: ###-####.
BLD-Footing9/28/20079/28/20079/28/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/28/2007 at 7:04:11 AM. Contact: ###-####.ftgs along south and east side
BLD-Footing9/25/20079/26/20079/26/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/25/2007 at 10:20:51 AM. Contact: ###-####. column ftgs
(F) Reprint permit  8/1/2007  
Issue PAID IN FULL permit  7/31/2007 DONE
Routing - PLAN CHECK7/20/2007 7/23/2007 PASS
PLANS/APPL TAKEN TO FRONT DESK  7/23/2007 DONE
Inspection Record Card- Bld  7/23/2007 DONE
Telephone call  7/23/2007 DONE
t/c w sam burrows at ###-#### - permit ready and fees given - also need ACHD receipt
Permit Ready to Issue  7/23/2007 DONE
Plan assigned to (JCM)5/16/2007 7/23/2007 PASS
7/23/2007 09:59:23 JCM - activity updated through activity BLDA022 from case BLD07-01248.
Routing - FIRE7/18/2007 7/20/2007 PASS
Attached updated review comments to plans.
Routing - PUBLIC WORKS7/16/2007 7/18/2007 PASS
Routing PW Sewer Design7/16/2007 7/18/2007 PASS
Routing PW Sewer Rating7/18/2007 7/18/2007 PASS
Plan Reviewer's activity  7/16/2007 PASS
Reviewed and approved structural and nonstructural plan resubmittals.
Routing - PLAN CHECK6/29/2007 7/16/2007 PASS
Plan resubmittals received  7/12/2007  
Recieved transmittal, response letter from Call Engineering, three copies of the following: memo from E2CO, supplemental structural calcs, and pages C1.2, C2.0, C3.0, C4.0, A0.2, A1.0, A2.1, A2.4, S2.0, S2.1, S2.2, S3.0, S4.0, S4.1, S5.0, S5.1, S5.2, S5.3, S5.4, E1.0, E2.1L, E2.2L, E3.0; taken to John Menard
1st review completed  6/29/2007 FAIL
Routing - FIRE6/28/2007 6/29/2007 FAIL
Faxed and emailed resubmittal items to architect.
Routing - PLAN CHECK6/12/2007 6/28/2007 FAIL
Plan resubmittals requested  6/28/2007 DONE
E-mailed the architect a copy of the plans review requesting revisions.
Routing - PLUMBING5/31/2007 6/12/2007 PASS
per plans and 2003 upc
Routing - PLANNING6/12/2007 6/12/2007 PASS
Approved per DRH07-00007
Routing Off Site - STRUCTURAL5/17/2007 6/7/2007 FAIL
Called action Courier for pick up on 5/17/07 @ 8:31Am BAS - Received comment list from consulting structural engineer requesting revisions.
Plan resubmittals requested  6/7/2007 DONE
Faxed the archtiect a copy of the structural plan review requesting revisions.
Routing - Erosion and Sediment5/24/2007 5/31/2007 PASS
ESC plan approved with attached conditions.
Routing PW Sewer Rating5/23/2007 5/24/2007 PASS
Routing PW Solid Waste5/17/2007 5/24/2007 PASS
Routing - PUBLIC WORKS5/17/2007 5/24/2007 FAIL
Routing PW Street Lights5/22/2007 5/23/2007 PASS
Routing PW Sewer Design5/22/2007 5/22/2007 FAIL
Existing sanitary sewer easement needs to be shown on civil plans to verify building is outstide of existing easement.
Routing PW Drainage5/17/2007 5/21/2007 PASS
Plans ACCEPTED BY PLAN TECH  5/17/2007  
Routing - PLANNING Land Div5/17/2007 5/17/2007 PASS
Recd Pcfee & Taken To Pln CK  5/16/2007 DONE
Application received  5/16/2007  
Pending Assignment by MYS5/16/2007 5/16/2007 DONE
5/16/2007 14:00:56 JCM - activity updated through activity BLDA166 from case BLD07-01248.
Routing - PLAN CHECK