Permit Information
Permit NumberBLD07-01318
StatusFinaled
Name AC CONSTRUCTION
Site Address 1199 W SHORELINE Unit: DR
Project NameRIVER PARK BLDG
Customer Number 
ePlanReviewNo
Description
(IDAHO LOTTERY - RIVER PARK BLDG - 1ST & 2ND FLR) NOTE: Building is fully sprinklered for 1-hour substitution. To remodel 16,600 sq. ft. (8,200 1st + 8,400 sq. ft. 2nd) of first and second floors for use as Idaho Lottery Offices. Work includes select interior demolition; new interior walls to create office, reception/lobby, conference and support areas; existing acoustical ceiling grid system to remain with repairs to areas modified by wall demolition or repair to made to match existing system; to upgrade electrical, mechanical & plumbing to meet tenant needs and to comply with current adopted codes and ordinances. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 3/7/20123/15/2012 DONE
project too old
Second Notice 2/26/20123/2/2012 DONE
DetailsChristina Prado
faxed 3-2-12
Case Summary (BLD)  2/22/2012 DONE
First Notice 2/16/20122/16/2012 DONE
Permanent Occupancy  2/6/2012 DONE
DetailsChristina Prado
First Notice4/11/20114/11/20114/27/2011 DONE
DetailsDave Hannah
BLD-Final4/11/20114/11/20114/11/2011APASS
DetailsDave Hannah
DOC - Permit Finaled4/11/20114/11/20114/11/2011PPASS
DetailsDave Hannah
BLD-Aging Inspection4/11/20114/11/20114/11/2011 PASS
DetailsDave Hannah
BLD-Aging Inspection2/7/20112/7/20112/7/2011 PASS
DetailsDave Hannah
BLD-Aging Inspection12/6/201012/6/201012/8/2010 PASS
DetailsDave Hannah
FIRE-Final Inspection10/4/201010/6/201010/6/2010APASS
DetailsForrest France
Fire life safety finaled.
BLD-Final10/4/201010/5/201010/5/2010APASS
DetailsDave Hannah
Doc Phone #: ###-####
BLD-Aging Inspection10/1/201010/1/201010/4/2010 PASS
DetailsDave Hannah
BLD-Conference7/21/20107/21/20107/21/2010APART
DetailsDave Hannah
cont will call for finals
BLD-Aging Inspection7/21/20107/21/20107/21/2010 PASS
DetailsDave Hannah
BLD-Aging Inspection3/22/20103/22/20103/22/2010PPASS
DetailsDave Hannah
FYI 410 contractor will call in finals
FIRE-Conference3/10/20103/10/20103/12/2010PDONE
DetailsForrest France
On site walkthrough confirmed work appears finished, contractor to request inspections for permit final as required.
BLD-Other5/21/20085/22/20085/22/2008APASS
DetailsDave Hannah
mike Note: ceiling cover Phone #: ###-#### ok to cover ceiling
BLD-Other5/19/20085/20/20085/20/2008APART
DetailsDave Hannah
doc Note: ceiling cover Phone #: ###-#### ok to cover ceiling in old area
BLD-Wall cover4/11/20084/11/20084/11/2008PPASS
DetailsDave Hannah
Doc; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt first floor old section
BLD-Framing/Rough-in3/19/20083/20/20083/20/2008APART
DetailsDave Hannah
Doc Phone #: ###-#### ceiling grid ok to cover
BLD-Framing/Rough-in3/3/20083/3/20083/3/2008PPART
DetailsDave Hannah
doc Phone #: ###-#### ground fl conf room area and offices ok to cover walls
BLD-Other1/4/20081/7/20081/7/2008APART
DetailsDave Hannah
doc - Note ceiling Phone #: ###-#### ok to cover ceiling on second floor
BLD-Wall cover11/6/200711/7/200711/7/2007APART
DetailsDave Hannah
DOC NOTE: 2ND FLOOR Phone #: ###-#### ok to cover second floor waals
Issue PAID IN FULL permit  10/3/2007 DONE
Telephone call  9/11/2007 DONE
talked to eric peterson at ###-#### that permit is ready & gave fees and need gc & rce#
Telephone call  7/31/2007 DONE
Called and told Meagan that permit is ready, fees and need GC info as Eric Peterson is on vacation this week///7/31/07 @ 9:19am BAS
CHANGE STATUS TO (RDY)  7/31/2007 DONE
PLANS/APPL TAKEN TO FRONT DESK  7/27/2007 PASS
Print Occupancy Form  7/27/2007 DONE
Plan assigned to (DRS)5/25/2007 7/27/2007 PASS
7/27/2007 12:05:30 DRS - activity updated through activity BLDA022 from case BLD07-01318.
Plan resubmittals received  7/26/2007  
received 1 review comments and 3 copys of sheets A2.0,A3.0,A5.0 taken to Dan S.
Routing - PLAN CHECK7/19/2007 7/25/2007 FAIL
Resubmittals of 7/19/07 inserted into original plans. Review of resubmittals indicates several items still needing to be correctly addressed. The plan review was modified and a new copy of required corrections e-mailed to eric peterson and bruce poe @ "gomodus.com"
Routing - PLAN CHECK7/25/2007 7/25/2007 PASS
Resubmittals inserted into original plan submittals. No resubmittals required. Plans and attachments to permit desk to issue permit.
Plan resubmittals requested  7/25/2007 DONE
Copy of second plan review e-mailed to eric peterson and bruce poe.
Plan resubmittals received  7/19/2007  
Received 1 cover transmittal (2pgs), 2 seperate responce letters from Rod Mulder (1 pg each), 3 copies of sheets- A0.0, A1.0, A2.0, A2.1, A3.0, A3.1, A4.0, A4.1, A5.0, M0.0, M0.1, H1.0, H1.1, H2.1, E1.1, E2.1L, E2.1P, E2.2, E3.0, P1.0 and taken to Dan Stuart
Telephone call  7/3/2007 DONE
Call from Eric Peterson saying he had not recieved a copy of plan review. I e-mailed him a copy again and faxed him a copy again.
Telephone call  7/2/2007 DONE
Call from Eric Peterson, Modus Architects inquiring about plan review staut of project. I completed my review 6/27/07 and e-mailed copy of review to Bruce Poe architect of record at e-mail address provided on application. The e-mail address has changed. I had received an e-mail message back from Bruce Poe staing the address had changed bu that the e-mail had been forwarded to the new e-mail address. Eric stated Bruce was out of town and ask that I e-mail him a copy of the review at epeterson@gomodus.com. I sent him a copy and copied myself to keep a record.The e-mail was sent okay per report.
Routing - PLAN CHECK6/25/2007 6/28/2007 FAIL
Resubmittals required. Copy of plan review e-mailed to Bruce Poe.
Plan resubmittals requested  6/28/2007 DONE
E-mailed copy of plan review corrections / clarifications required for this project to Bruce Poe.
1st review completed  6/25/2007 PASS
Routing - FIRE6/21/2007 6/25/2007 PASS
Attached review comments to plans. NOTE: Fire sprinkler modifications may be required for this tenant improvement project. See fire review comments.
Routing - PLAN CHECK5/29/2007 6/21/2007 PEND
Wrote up permit so I could route to fire code analyst while out of office until 6/26/07. Work does not increase building area, change occupancy use or increase the occupant load of existing office use for both floors.
Routing - PUBLIC WORKS5/25/2007 5/29/2007 PASS
Routing PW Sewer Rating5/29/2007 5/29/2007 PASS
Pending Assignment by MYS5/22/2007 5/25/2007 DONE
5/25/2007 12:00:39 MYS - activity updated through activity BLDA168 from case BLD07-01318.
Plans ACCEPTED BY PLAN TECH  5/23/2007  
Application received  5/22/2007  
Recd Pcfee & Taken To Pln CK  5/22/2007