Third Notice | | 3/7/2012 | 3/15/2012 | | DONE |
|
|
|
project too old
|
Second Notice | | 2/26/2012 | 3/2/2012 | | DONE |
Christina Prado
|
|
|
faxed 3-2-12
|
Case Summary (BLD) | | | 2/22/2012 | | DONE |
|
|
|
|
First Notice | | 2/16/2012 | 2/16/2012 | | DONE |
|
|
|
|
Permanent Occupancy | | | 2/6/2012 | | DONE |
Christina Prado
|
|
|
|
First Notice | 4/11/2011 | 4/11/2011 | 4/27/2011 | | DONE |
Dave Hannah
|
|
|
|
BLD-Final | 4/11/2011 | 4/11/2011 | 4/11/2011 | A | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 4/11/2011 | 4/11/2011 | 4/11/2011 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 4/11/2011 | 4/11/2011 | 4/11/2011 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 2/7/2011 | 2/7/2011 | 2/7/2011 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 12/6/2010 | 12/6/2010 | 12/8/2010 | | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 10/4/2010 | 10/6/2010 | 10/6/2010 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
BLD-Final | 10/4/2010 | 10/5/2010 | 10/5/2010 | A | PASS |
Dave Hannah
|
|
|
Doc Phone #: ###-####
|
BLD-Aging Inspection | 10/1/2010 | 10/1/2010 | 10/4/2010 | | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 7/21/2010 | 7/21/2010 | 7/21/2010 | A | PART |
Dave Hannah
|
|
|
cont will call for finals
|
BLD-Aging Inspection | 7/21/2010 | 7/21/2010 | 7/21/2010 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 3/22/2010 | 3/22/2010 | 3/22/2010 | P | PASS |
Dave Hannah
|
|
|
FYI 410 contractor will call in finals
|
FIRE-Conference | 3/10/2010 | 3/10/2010 | 3/12/2010 | P | DONE |
Forrest France
|
|
|
On site walkthrough confirmed work appears finished, contractor to request inspections for permit final as required.
|
BLD-Other | 5/21/2008 | 5/22/2008 | 5/22/2008 | A | PASS |
Dave Hannah
|
|
|
mike Note: ceiling cover Phone #: ###-#### ok to cover ceiling
|
BLD-Other | 5/19/2008 | 5/20/2008 | 5/20/2008 | A | PART |
Dave Hannah
|
|
|
doc Note: ceiling cover Phone #: ###-#### ok to cover ceiling in old area
|
BLD-Wall cover | 4/11/2008 | 4/11/2008 | 4/11/2008 | P | PASS |
Dave Hannah
|
|
|
Doc; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt first floor old section
|
BLD-Framing/Rough-in | 3/19/2008 | 3/20/2008 | 3/20/2008 | A | PART |
Dave Hannah
|
|
|
Doc Phone #: ###-#### ceiling grid ok to cover
|
BLD-Framing/Rough-in | 3/3/2008 | 3/3/2008 | 3/3/2008 | P | PART |
Dave Hannah
|
|
|
doc Phone #: ###-#### ground fl conf room area and offices ok to cover walls
|
BLD-Other | 1/4/2008 | 1/7/2008 | 1/7/2008 | A | PART |
Dave Hannah
|
|
|
doc - Note ceiling Phone #: ###-#### ok to cover ceiling on second floor
|
BLD-Wall cover | 11/6/2007 | 11/7/2007 | 11/7/2007 | A | PART |
Dave Hannah
|
|
|
DOC NOTE: 2ND FLOOR Phone #: ###-#### ok to cover second floor waals
|
Issue PAID IN FULL permit | | | 10/3/2007 | | DONE |
|
|
|
|
Telephone call | | | 9/11/2007 | | DONE |
|
|
|
talked to eric peterson at ###-#### that permit is ready & gave fees and need gc & rce#
|
Telephone call | | | 7/31/2007 | | DONE |
|
|
|
Called and told Meagan that permit is ready, fees and need GC info as Eric Peterson is on vacation this week///7/31/07 @ 9:19am BAS
|
CHANGE STATUS TO (RDY) | | | 7/31/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/27/2007 | | PASS |
|
|
|
|
Print Occupancy Form | | | 7/27/2007 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 5/25/2007 | | 7/27/2007 | | PASS |
|
|
|
7/27/2007 12:05:30 DRS - activity updated through activity BLDA022 from case BLD07-01318.
|
Plan resubmittals received | | | 7/26/2007 | | |
|
|
|
received 1 review comments and 3 copys of sheets A2.0,A3.0,A5.0 taken to Dan S.
|
Routing - PLAN CHECK | 7/19/2007 | | 7/25/2007 | | FAIL |
|
|
|
Resubmittals of 7/19/07 inserted into original plans. Review of resubmittals indicates several items still needing to be correctly addressed. The plan review was modified and a new copy of required corrections e-mailed to eric peterson and bruce poe @ "gomodus.com"
|
Routing - PLAN CHECK | 7/25/2007 | | 7/25/2007 | | PASS |
|
|
|
Resubmittals inserted into original plan submittals. No resubmittals required. Plans and attachments to permit desk to issue permit.
|
Plan resubmittals requested | | | 7/25/2007 | | DONE |
|
|
|
Copy of second plan review e-mailed to eric peterson and bruce poe.
|
Plan resubmittals received | | | 7/19/2007 | | |
|
|
|
Received 1 cover transmittal (2pgs), 2 seperate responce letters from Rod Mulder (1 pg each), 3 copies of sheets- A0.0, A1.0, A2.0, A2.1, A3.0, A3.1, A4.0, A4.1, A5.0, M0.0, M0.1, H1.0, H1.1, H2.1, E1.1, E2.1L, E2.1P, E2.2, E3.0, P1.0 and taken to Dan Stuart
|
Telephone call | | | 7/3/2007 | | DONE |
|
|
|
Call from Eric Peterson saying he had not recieved a copy of plan review. I e-mailed him a copy again and faxed him a copy again.
|
Telephone call | | | 7/2/2007 | | DONE |
|
|
|
Call from Eric Peterson, Modus Architects inquiring about plan review staut of project. I completed my review 6/27/07 and e-mailed copy of review to Bruce Poe architect of record at e-mail address provided on application. The e-mail address has changed. I had received an e-mail message back from Bruce Poe staing the address had changed bu that the e-mail had been forwarded to the new e-mail address. Eric stated Bruce was out of town and ask that I e-mail him a copy of the review at epeterson@gomodus.com. I sent him a copy and copied myself to keep a record.The e-mail was sent okay per report.
|
Routing - PLAN CHECK | 6/25/2007 | | 6/28/2007 | | FAIL |
|
|
|
Resubmittals required. Copy of plan review e-mailed to Bruce Poe.
|
Plan resubmittals requested | | | 6/28/2007 | | DONE |
|
|
|
E-mailed copy of plan review corrections / clarifications required for this project to Bruce Poe.
|
1st review completed | | | 6/25/2007 | | PASS |
|
|
|
|
Routing - FIRE | 6/21/2007 | | 6/25/2007 | | PASS |
|
|
|
Attached review comments to plans. NOTE: Fire sprinkler modifications may be required for this tenant improvement project. See fire review comments.
|
Routing - PLAN CHECK | 5/29/2007 | | 6/21/2007 | | PEND |
|
|
|
Wrote up permit so I could route to fire code analyst while out of office until 6/26/07. Work does not increase building area, change occupancy use or increase the occupant load of existing office use for both floors.
|
Routing - PUBLIC WORKS | 5/25/2007 | | 5/29/2007 | | PASS |
|
|
|
|
Routing PW Sewer Rating | 5/29/2007 | | 5/29/2007 | | PASS |
|
|
|
|
Pending Assignment by MYS | 5/22/2007 | | 5/25/2007 | | DONE |
|
|
|
5/25/2007 12:00:39 MYS - activity updated through activity BLDA168 from case BLD07-01318.
|
Plans ACCEPTED BY PLAN TECH | | | 5/23/2007 | | |
|
|
|
|
Application received | | | 5/22/2007 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/22/2007 | | |
|
|
|
|