BLD-Other | 2/9/2010 | 2/9/2010 | 2/9/2010 | A | PASS |
Jim Sly
|
|
|
Inspection to determine that Duplex was built to Townhouse requirements. Two 1hr walls, lay down parapet, no openings (4') and wall protection at property line (eaves) OK. OK to convert to Townhouse.
|
Telephone call | | | 12/29/2009 | | DONE |
Sam Zahorka
|
|
|
Spoke with Dennis about what is still needed to be completed prior to Townhouse conversion permit issuance. The remaining items are: Correct the Survey to show all utilities are within the required easments. Plumbing and Electrical inspectors will verify utilities are within the platted easements as sson as corrected survey is recorded and the city engineer has signed off.
As soon as these two items are completed Plan review will issue conversion permits. SRZ
|
Plan Reviewer's activity | | | 6/25/2009 | | DONE |
Sam Zahorka
|
|
|
Reviewed Preliminary Plat to identify if all utility lines are within easements. After reviewing I determined there is still an issue with the utility lines not within the easements. I shared this information with the Planning/Subdivisions department and they were going to call the Surveyor and have him correct. SRZ
|
Telephone call | | | 5/8/2009 | | DONE |
Sam Zahorka
|
|
|
Structural inspector notified of request for Duplex to Townhome conversion by plan review. Applicant has been instructed to call for evaluation inspection of property line construction, bring in approved plans and new plans showing compliance for townhouse construction. NOTE: conversion permits and either a recorded subdivision or a zoning certificate and recorded record of survey must be completed prior to selling as individual units. SRZ
|
Telephone call | | | 5/7/2009 | | DONE |
Sam Zahorka
|
|
|
Telephone call with Dave Crawford. Requested applicant to bring in plans showing Townhouse construction for approval. Applicant also needs to schedule an inspection through the front counter for verification of construction. A townhouse conversion permit is required.
|
Case Summary (BLD) | | | 12/1/2008 | | |
|
|
|
|
Case Summary (BLD) | | | 12/1/2008 | | |
|
|
|
|
Case Summary (BLD) | | | 11/19/2008 | | DONE |
|
|
|
|
Meeting | | | 11/19/2008 | | DONE |
Sam Zahorka
|
|
|
Attended meeting with Dave Abo, Apllicant, and their designer about what needs to happen in order to convert Duplex's to Townhomes. Informed them the 1st step would be to call for an evaluation inspection to see what would need to be corrected for building code compliance. The Second step would be to bring approved plans and new plans showing compliance for townhome construction. The Third step would be to get with the subdivisions department for the record of survey. I also let them know a conversion permit would be required before they would be able to sell them as individual units. SRZ
|
BLD-Final | 4/8/2008 | 4/8/2008 | 4/8/2008 | P | PASS |
Jim Sly
|
|
|
dennis Phone #: ###-#### c/c issued
|
DOC - Permit Finaled | 4/8/2008 | 4/8/2008 | 4/8/2008 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 3/4/2008 | 3/4/2008 | 3/4/2008 | P | PASS |
Tom Arcoraci
|
|
|
dennis Phone #: ###-####
|
BLD-Framing/Rough-in | 2/27/2008 | 2/28/2008 | 2/28/2008 | A | PASS |
Tom Arcoraci
|
|
|
dennis Phone #: ###-#### per plan as duplex cn posted
|
CHANGE STATUS TO (ISS) | | | 2/28/2008 | | DONE |
|
|
|
inspector doc final in error
|
BLD-Other | 2/27/2008 | 2/27/2008 | 2/27/2008 | P | DONE |
Jim Sly
|
|
|
Whoops.....Doc finaled by mistake!
|
DOC - Permit Finaled | 2/27/2008 | 2/27/2008 | 2/27/2008 | P | PASS |
Jim Sly
|
|
|
|
Case Summary (BLD) | | | 2/26/2008 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 2/26/2008 | | DONE |
|
|
|
New attached garage approved per approved plans and the Building officials approval. Alternate for R309.1 2003 IRC attached to permit. (SRZ ###-####)
|
Case Summary (BLD) | | | 2/25/2008 | | |
|
|
|
|
Plan Reviewer's activity | | | 2/25/2008 | | DONE |
|
|
|
Applicant brought plans in to update permit with a new attached garage. New plans showed new garage opening into a bedroom wich does not meet opening protection requirements per R309.1 of the 2003 IRC. I suggested he speak with the Building Official for approval. He left plans and a hand written letter for review. (SRZ)
|
BLD-Framing/Rough-in | 2/7/2008 | 2/7/2008 | 2/7/2008 | P | NR |
Mike Jordan
|
|
|
dennis Phone #: ###-####. elec ri insp failed. Permit notes duplex only, contractor has noted that this has changed. Needs to resubit to plan review and have permit modified and get elec. issues resolved prior to proceeding.
|
BLD-Framing/Rough-in | 12/6/2007 | 12/6/2007 | 12/6/2007 | P | PART |
Jim Sly
|
|
|
dennis Note: fire wall Phone #: ###-####
|
BLD-Footing | 11/5/2007 | 11/5/2007 | 11/5/2007 | P | PASS |
Jim Sly
|
|
|
paul Phone #: ###-####
|
BLD-Footing | 10/29/2007 | 10/30/2007 | 10/30/2007 | A | PASS |
Tom Arcoraci
|
|
|
paul Phone #: ###-####
|
Telephone call | | | 8/31/2007 | | DONE |
|
|
|
Spoke with Habitat office to verify they received fax of fees owed///8/31/07 @ 2:37pm BAS
|
Permit Ready to Issue | | | 8/31/2007 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/31/2007 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/31/2007 | | DONE |
|
|
|
|
Plan assigned to (SRZ) | 8/29/2007 | 8/29/2007 | 8/30/2007 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 8/30/2007 | | |
|
|
|
|
Routing - FIRE | 8/30/2007 | | 8/30/2007 | | PASS |
|
|
|
No review comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/30/2007 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/28/2007 | | 8/30/2007 | | PASS |
|
|
|
|
Pending Assignment by SRZ | 5/23/2007 | | 8/29/2007 | | DONE |
|
|
|
8/29/2007 16:20:14 SRZ - activity updated through activity BLDA160 from case BLD07-01319.
|
Routing - PLANNING | 5/23/2007 | | 8/28/2007 | | PASS |
|
|
|
Needs duplex approval. Called Jimmy 5/23/07
Routed to Diane CAA07-118 8/28/07 Pass. DCP.
|
Routing - PUBLIC WORKS | 8/28/2007 | | 8/28/2007 | | PASS |
|
|
|
|
Routing PW Sewer Rating | 8/28/2007 | | 8/28/2007 | | PASS |
|
|
|
|
Application received | | | 5/23/2007 | | |
|
|
|
|
Routing - Addressing | 5/23/2007 | | 5/23/2007 | | PASS |
|
|
|
|