Second Notice BLD | 2/6/2008 | 2/6/2008 | 2/6/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | 1/14/2008 | 1/14/2008 | 2/6/2008 | | DONE |
Dave Hannah
|
|
|
|
BLD-Final | 1/11/2008 | 1/14/2008 | 1/14/2008 | P | PASS |
Dave Hannah
|
|
|
danton Phone #: ###-####
|
DOC - Permit Finaled | 1/14/2008 | 1/14/2008 | 1/14/2008 | P | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 1/11/2008 | 1/14/2008 | 1/14/2008 | A | PASS |
Forrest France
|
|
|
Knox box to be provided as discussed, need to complete one small area missing gyp. board install at the future elevator shaft for fire rating prior to structural inspection, remainder of building shell permit life safety is satisfactory.
|
Code Occupancy Approval | 1/11/2008 | 1/11/2008 | 1/11/2008 | P | PASS |
Joe R Venneman
|
|
|
|
Code Occupancy Approval | | | 1/11/2008 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 1/3/2008 | 1/3/2008 | 1/3/2008 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/3/2008 at 6:35:53 AM. Contact: ###-####.
|
(F) Reprint permit | | | 10/2/2007 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/2/2007 | | DONE |
|
|
|
picked up and paid for plan modification
|
Plan assigned to (CJW) | 9/19/2007 | 9/19/2007 | 9/28/2007 | | PASS |
|
|
|
9/28/2007 08:25:17 CJW - activity updated through activity BLDA022 from case BLD07-01386.
|
Routing - PLAN CHECK | 9/19/2007 | | 9/28/2007 | | PASS |
|
|
|
Plan modification approved.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/28/2007 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/28/2007 | | DONE |
|
|
|
|
Telephone call | | | 9/28/2007 | | DONE |
|
|
|
Called ###-#### and left voice message for Elizabeth Cooper that plan mod is ready, fee, and can request refund on initial $500 fee
|
Permit Ready to Issue | | | 9/28/2007 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 9/25/2007 | 9/25/2007 | 9/26/2007 | P | PART |
Dave Hannah
|
|
|
###-#### - shane elevator shaft ok to cover
|
Override - Parcel Holds | | | 9/25/2007 | | |
|
|
|
|
BLD-Framing/Rough-in | 9/14/2007 | 9/18/2007 | 9/19/2007 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/14/2007 at 7:33:12 AM. Contact: ###-####. framing around stairs ok to cover
|
Plan Modification Accepted | | | 9/19/2007 | | |
|
|
|
Plan modification excepted for the redesign of the mechanical plan( RTU) and associated Electrical & structural calcs, On sheets E0.0,E2.2,M1.1,M1.2,M2.0,MC1.2 plans routed to Carl W.
|
BLD-Framing/Rough-in | 9/6/2007 | 9/6/2007 | 9/6/2007 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/6/2007 at 7:06:58 AM. Contact: ###-####. ok to cover divider wall in basement
|
Issue PAID IN FULL permit | | | 8/13/2007 | | DONE |
|
|
|
|
Telephone call | | | 8/10/2007 | | DONE |
|
|
|
t/c w elizabeth cooper at ###-#### - permit ready and fees given - also need gc name and rce#
|
Permit Ready to Issue | | | 8/10/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/9/2007 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/9/2007 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/9/2007 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 6/8/2007 | | 8/9/2007 | | PASS |
|
|
|
8/9/2007 13:08:42 CJW - activity updated through activity BLDA022 from case BLD07-01386.
|
Routing - PLAN CHECK | 7/12/2007 | | 8/9/2007 | | PASS |
|
|
|
(7-13-07) Structural issues were NOT resolved. Waiting for more information, etc. (7-30-07) Looked at resubmittal. Still not correct. (8-3-07) Looked at the resubmittals. Need to talk to the Engineer. Left a voice mail. (8-9-07) Completed the resubmittal review. Drawings approved.
|
Plan resubmittals received | | | 8/7/2007 | | |
|
|
|
received 1 transmittal,3 calcs, and 3 copys of sheets S0.0,S1.01,S1.02,S1.03,S2.01 taken to Carl W.
|
Plan resubmittals received | | | 8/1/2007 | | |
|
|
|
received 1 transmittal,2 structural calcs and 3 copys of sheets s0.1,s1.01,s1.02,s1.03,s2.01 taken to Carl W.
|
Plan resubmittals received | | | 7/19/2007 | | |
|
|
|
Received transmittal, three copies of revised structural calcs and pages S0.1, S1.03, S2.01; taken to Carl Westfall
|
Routing - PLANNING Land Div | 7/10/2007 | | 7/12/2007 | | PASS |
|
|
|
|
Plan resubmittals received | | | 7/11/2007 | | DONE |
|
|
|
received 1 project letter, 2 structural calcs, and 2 copys of sheets A2.0,A2.1,A3.0 taken to Carl W.
|
Routing - PLAN CHECK | 7/3/2007 | | 7/10/2007 | | |
|
|
|
Sent to 'Land Division' to verify the removal of the property line.
|
1st review completed | | | 7/3/2007 | | FAIL |
|
|
|
|
Routing - FIRE | 6/29/2007 | | 7/3/2007 | | PASS |
|
|
|
Attached review comments to plans.
|
Routing - PLAN CHECK | 6/15/2007 | | 6/29/2007 | | FAIL |
|
|
|
The IBC plan review was started on June 27, 2007 and finished on June 29, 2007. Revised drawings were required. See the plan review report.
|
Plan resubmittals received | | | 6/28/2007 | | |
|
|
|
Received 1 cover transmittal, 2 copies of structural calcs books, 3 copies of sheet S1.02 and taken to Carl Westfall
|
Routing - PLANNING | 6/13/2007 | | 6/15/2007 | | PASS |
|
|
|
Sarah Schafer
|
Routing - PUBLIC WORKS | 6/8/2007 | | 6/13/2007 | | PASS |
|
|
|
|
Routing - Addressing | 6/8/2007 | | 6/8/2007 | | PASS |
|
|
|
|
Pending Assignment by MYS | 5/29/2007 | | 6/8/2007 | | DONE |
|
|
|
6/8/2007 12:13:33 MYS - activity updated through activity BLDA172 from case BLD07-01386.
|
Recd Pcfee & Taken To Pln CK | | | 5/29/2007 | | DONE |
|
|
|
|
Application received | | | 5/29/2007 | | |
|
|
|
|