Permit NumberBLD07-01424
StatusFinaled
Name BAJIO'S RESTAURANT
Site Address 1492 S ENTERTAINMENT AVE
Project NameShops at Spectrum Pointe
Customer Number 
ePlanReviewNo
Description
(BAJIO'S RESTAURANT - SHOPS AT SPECTRUM POINTE) To construct a 2,268 sq.ft. restaurant at the south end of an existing 9,600 sq. ft. shell building per approved plans. A 2-hour fire barrier wall is being constructed as part of this permit to create a fire area less than 5,000 sq. ft. so tenant space does not require a sprinkler system. Work includes interior walls to create two fully accessible restrooms, a kitchen food prep & service area and a dining / queue area; new electrical, mechanical and plumbing; type I Grease hood / Exhaust system and kitchen equipment; a suspended grid ceiling system in the kitchen area, gyp board ceiling in the restrooms with the dining / queue and accessible route to the restrooms open to existing structure. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD12/11/200712/11/200712/19/2007 DONE
Second Notice has not been responded to.
Second Notice BLD11/19/200711/19/200712/11/2007 DONE
First Notice has not been responded to.
First Notice 11/6/200711/19/2007 DONE
Override - People Holds  11/6/2007  
Permanent Occupancy  11/6/2007 DONE
Temporary Occupancy11/1/20071/30/200811/1/2007 DONE
Override - People Holds  11/1/2007  
Override - People Holds  11/1/2007  
BLD-Final10/29/200710/30/200710/30/2007PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 10/29/2007 at 1:56:11 PM. Contact: ###-####. ok for perm occ.
FIRE-Final Inspection10/29/200710/30/200710/30/2007APASS
DetailsTroy Cobbley
Life safety passed.
FIRE-Final Inspection10/29/200710/29/200710/29/2007AFAIL
DetailsTroy Cobbley
Provide exit discharge lighting as discussed.
BLD-Conference10/19/200710/22/200710/22/2007APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 10/19/2007 at 5:25:58 PM. Contact: ###-####. Verified installation of remaining fire stop and collars on 2hr fire barrier wall.
BLD-Other10/11/200710/12/200710/12/2007APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/11/2007 at 12:47:15 PM. Contact: ###-####.
Grid OK.
BLD-Conference9/17/20079/17/20079/17/2007PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 9/17/2007 at 7:58:04 AM. Contact: ###-####. Reviewed UL tech data and installation of firestop material at 2hr fire barrier wall.
BLD-Framing/Rough-in9/4/20079/5/20079/5/2007APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 9/4/2007 at 9:29:59 AM. Contact: ###-####. ok for 2nd layer of rock on 2hr fire barrier wall.
BLD-Framing/Rough-in8/31/20079/4/20079/4/2007APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/31/2007 at 10:49:15 AM. Contact: ###-####. Verified putty pads, 1st. layer of rock, insul on 2hr fire barrier wall.
BLD-Framing/Rough-in8/30/20078/30/20078/30/2007PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/30/2007 at 10:38:05 AM. Contact: ###-####. Interior framed walls ok. One side only on 2 hr fire barrier wall. Needs UL data for roof drain thru penetrations for firestop.
BLD-Framing/Rough-in8/29/20078/30/20078/30/2007ANR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/29/2007 at 8:33:30 AM. Contact: ###-####. Elec. ri failed.
FIRE-Conference8/24/20078/24/20078/24/2007PDONE
DetailsTroy Cobbley
I let the electrician know that the manual pull station for the hood suppression system is to be mounted 10' to 20' from the hood in the path of egress.
Issue PAID IN FULL permit  7/31/2007 DONE
Telephone call  7/25/2007 DONE
left vm for stanley cole at ###-#### - permit ready and fees given - also need receipts for ACHD
Permit Ready to Issue  7/25/2007 DONE
Routing - PLAN CHECK7/19/2007 7/24/2007 PASS
Plans approved with red-lined notes on plans and all attached plan reviews by all reviewing agencies, all part of the reviewed plans. Plans to permit desk to issue.
PLANS/APPL TAKEN TO FRONT DESK  7/24/2007 PASS
Received Certificate of Value  7/24/2007 DONE
Received new certificate of value from Rick Steed.
Print Occupancy Form  7/24/2007  
Plan assigned to (DRS)6/19/2007 7/24/2007 PASS
7/24/2007 13:39:24 DRS - activity updated through activity BLDA022 from case BLD07-01424.
Routing - FIRE7/17/2007 7/19/2007 PASS
Attached updated review comments to plans. A hood fire extinguishing permit is requried.
Plan resubmittals received  7/17/2007  
Received repsonse letter, replacement for Registered Design Professional in Resonsible Charge page of application, and three copies of pages A0.0, A1.0, A2.0, A3.0, A4.0, A5.0, EN1.0; two 11" x 17" pages of hood and fan information; Taken to Dan Stuart
Routing - PLAN CHECK7/9/2007 7/17/2007 PEND
Plan resubmittals recieved and inserted into plans. Re-routing to fire code analyst for review.
Telephone call  7/13/2007 DONE
Call from John Ferrrin, electrical engineer concerning the use of exception # 3, 2006 IECC to eliminate need for auto shutoff. I told him it would have to be an alternate request through the building official, George slane, asking to use the exception and a statement as to why exception is applicable. Other options are the fire wall to create separate building or install auto shutoff. He will call Stan cole to determine which process they want to persue.
Telephone call  7/12/2007 DONE
Called Stan Cole, architect taking over project from Brian Hauff, concerning exception to auto shutoff requirement in the 2006 IECC. This would be an alternate request to the building official requesting use of exception #3 and stating the ' automatic shutoff would endanger occupant safety and security' and reason. Other options are a fire wall to create two buildings or install auto shutoff.
Routing - FIRE7/2/2007 7/9/2007 FAIL
Emailed and Faxed resubmittal items to architect.
1st review completed  7/9/2007 FAIL
Plan resubmittals requested  7/2/2007 DONE
Copy of review items needing to addressed e-mailed to architect, Brian Hauff.
Routing - PLAN CHECK6/26/2007 7/2/2007 FAIL
Resubmittals required. Copy of plan review comments e-mailed to Brian Hauff. Routing plans to fire code analyst.
Routing - PLUMBING6/20/2007 6/26/2007 PASS
(1) as per plan and UPC 2003 (2) additional cross conection protection may be required
Routing - PUBLIC WORKS6/19/2007 6/20/2007 PASS
Routing PW Environmental6/20/2007 6/20/2007 PASS
Shell and core in 06 showed 2 GIs, WBSD site, TI shows all kitchen drainage to segregated GW line.
Routing PW Sewer Rating6/20/2007 6/20/2007 PASS
Pending Assignment by MYS6/1/2007 6/19/2007 DONE
6/19/2007 14:33:43 MYS - activity updated through activity BLDA168 from case BLD07-01424.
Plans ACCEPTED BY PLAN TECH  6/1/2007  
Recd Pcfee & Taken To Pln CK  6/1/2007 DONE
Application received  5/31/2007