Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD07-01440
StatusFinaled
Name KREIZENBECK CONSTRUCTORS
Site Address 1109 W MYRTLE ST
Project NamePIONEER PLAZA-2ND FLR
Customer Number 
ePlanReviewNo
Description
**(Intermountain Orthopedics)**(Pioner Plaza - Ste #200)** To remodel an existing 5,750 sq.ft. office space located on the second floor for new health care office tenant per approved plans. Work to inlcude, interior demolition of nonbearing partitions, ceilings & floor finishes, construction of new noncombustible partitions for exam rooms, breakroom, reception area, storage room, X-Ray room, modility room, staff room & server room, installation of new suspended ceiling and related lighting, construction of two accessible restrooms, installation of HVAC system and related ducting, installation of counters cabinets and millwork, miscellaneous related interior finishes, this building is fully fire sprinklered for one-hour construction any alterations to the sprinkler system shall be per NFPA #13 as regulated by the fire department. RmH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD10/30/200710/30/200710/30/2007 DONE
Second Notice has not been responded to.
Second Notice BLD10/1/200710/1/200710/30/2007 DONE
First Notice has not been responded to.
First Notice 9/21/200710/1/2007 DONE
Permanent Occupancy  9/21/2007 DONE
BLD-Final9/19/20079/20/20079/20/2007APART
DetailsDave Hannah
Mark; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ok for temp occ ok for perm occ after elec oks for perm
BLD-Conference9/18/20079/19/20079/19/2007APART
DetailsDave Hannah
mark Phone #: ###-#### hardware on main door
FIRE-Final Inspection9/17/20079/18/20079/18/2007APASS
DetailsForrest France
Fire life safety passed inspection, manual flush bolts at the main entry/exit door inactive leaf to be replaced with automatic bolts prior to sturctural final as discussed with contractor.
FIRE-Final Inspection9/17/20079/17/20079/17/2007PCANC
DetailsForrest France
Scheduled by a contractor via Hello! on 9/17/2007 at 7:14:44 AM. Contact: ###-####. Inspection cancelled from web by: Cathy Weisshaupt
FIRE-Final Inspection9/13/20079/14/20079/14/2007ANR
DetailsForrest France
Pending completion of the project related fire alarm permit work.
BLD-Final9/13/20079/14/20079/14/2007ACANC
DetailsTom Arcoraci
Mark, as late in the p.m. as possible; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD-Final9/14/20079/14/20079/14/2007PCANC
DetailsDave Hannah
cancelled by contractors 1:25 pm
BLD-Framing/Rough-in9/6/20079/6/20079/6/2007PPASS
DetailsDave Hannah
Mark, ceiling inspection needed; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ceiling is ext lights ok ok to cover
BLD-Framing/Rough-in8/23/20078/23/20078/23/2007PPASS
DetailsDave Hannah
buck Phone #: ###-#### ok to cover walls
Plan assigned to (R_H)7/10/2007 8/21/2007 PASS
8/21/2007 09:33:09 RMH - activity updated through activity BLDA022 from case BLD07-01440.
Routing - PLAN CHECK8/14/2007 8/21/2007 PASS
PLANS/APPL TAKEN TO FRONT DESK  8/21/2007 DONE
Print Occupancy Form  8/21/2007 DONE
Telephone call  8/21/2007 DONE
t/c w eric anderson at ###-#### - permit ready and fees given
Permit Ready to Issue  8/21/2007 DONE
Issue PAID IN FULL permit  8/21/2007 DONE
Routing - FIRE8/8/2007 8/14/2007 PASS
Attached IFC review comments to plans.
1st review completed  8/14/2007 PASS
Case Summary (BLD)  8/8/2007 DONE
Routing - PLAN CHECK6/27/2007 8/8/2007 PEND
Plan assigned to (CJW)6/26/2007 7/10/2007 N/A
Reassigned to Ron by Marlene
Routing - PUBLIC WORKS6/26/2007 6/27/2007 PASS
Pending Assignment by MYS6/1/2007 6/26/2007 DONE
6/26/2007 12:12:17 MYS - activity updated through activity BLDA172 from case BLD07-01440.
Routing PW Sewer Rating6/26/2007 6/26/2007 PASS
Plan resubmittals received  6/11/2007  
Received transmittal and three copies of E2.0D, E2.0L, E3.1; inserted into plans per not assigned yet
Plans ACCEPTED BY PLAN TECH  6/4/2007  
Application received  6/1/2007  
Recd Pcfee & Taken To Pln CK  6/1/2007