Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD07-01485
StatusFinaled
Name BOISE SPINE CENTER
Site Address 1390 S MAPLE GROVE RD
Project Name 
Customer Number 
ePlanReviewNo
Description
(BOISE SPINE CENTER CLINIC) To build-out and finish a 2,837 sq.ft. medical office area in new 4,921 sq. ft. shell building (BLD06-02647) per approved plans.Work includes interior non-bearing walls to create waiting/reception/kids area; doctors offices; physical therapy, massage, rehab & treatment rooms; accessible restrooms and support areas; areas with suspended ceiling grid system, millwork, finishes; electrical, mechanical & plumbing work. Dual level switching indicated for energy code lighting compliance reduction. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  1/4/2008 DONE
lft vm with stacie irish regarding the plumb value 11:25 am
Telephone call  12/26/2007 DONE
lft wm with stacie irish ###-#### that their is plm on this permit if so who is the plm the contact 12:30 pm
Second Notice BLD11/19/200711/19/200712/6/2007 DONE
First Notice has not been responded to.
First Notice 11/9/200711/19/2007 DONE
BLD-Final11/9/200711/9/200711/9/2007PPASS
DetailsMike Jordan
Harvey; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt. ok for perm occ.
Permanent Occupancy  11/9/2007 DONE
FIRE-Final Inspection11/8/200711/8/200711/8/2007PPASS
DetailsTroy Cobbley
Life safety passed.
BLD-Framing/Rough-in10/23/200710/24/200710/24/2007APASS
DetailsMike Jordan
harvey - ceiling grid Phone #: ###-####
BLD-Energy code compliance9/25/20079/26/20079/26/2007PPASS
DetailsMike Jordan
harvey - insulation Phone #: ###-####
BLD-Framing/Rough-in9/24/20079/25/20079/25/2007APASS
DetailsMike Jordan
Harvey; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. Interior framed walls and harlid only. no grid.
Issue PAID IN FULL permit  9/4/2007 DONE
Telephone call  8/31/2007 DONE
Call from duane Marler concerning permit. Sent e-mail yesterday telling him plans at permit desk. Dr. Eri Crum will be called when permit is ready. Transferred Duane to permit desk as he had fee questions.
Print Occupancy Form  8/30/2007 DONE
Permit Ready to Issue  8/30/2007 DONE
Telephone call  8/30/2007 DONE
talked to dr. eri crum at ###-#### that permit is ready & gave fees
Routing - PUBLIC WORKS8/28/2007 8/29/2007 PASS
8/20/07 Plan Resubmittals added additional Toilet and lav for second restroom compliance. Added second sink for accessibility compliance in the breakroom.
Routing - PLAN CHECK8/29/2007 8/29/2007 PASS
Approved as noted on and attached plan review all part of the approved plans. Plan resubmittals were for the architectural drawings only. electrical, plumbing and mechanical floor plan layouts were not changed to match architectural. "E/M/P" sheets have red-line referencing to Sheet A2 for new floor plan layout for adjustment of their installations.
PLANS/APPL TAKEN TO FRONT DESK  8/29/2007 PASS
As noted on and attached to.
Plan assigned to (DRS)6/27/2007 8/29/2007 PASS
8/29/2007 17:45:11 DRS - activity updated through activity BLDA022 from case BLD07-01485.
Routing - PLAN CHECK7/19/2007 8/28/2007 FAIL
Resubmittals of 8/20/07 inserted into original plans. All responses are on architectural plans. Changes not made on electrical, plumbing or mechanical plans showing match with architectural sheets for new room layout to provide second restroom. "E/M/P" plans redlined to see Sheet A2 for new layout and required modifications by other trades to match new floor plan layout. Routing to Public Works for reevaluation of fee's. Brad Hoot to provide corrected Lighting Compliance Certificate and Checklist that will match the Lighting Fixture Schedule.
Telephone call  8/28/2007 DONE
Talked with Brad Hoots, Idaho Electrical Contracting, concerning the Lighting Compliance Cert wattage which actually exceeds allowable vs. the Lighting Fixture Schedule for PI1 & PI2 wattage callout. Brad to resubmitt corrected COMcheck for IECC Lighting Compliance.
Plan resubmittals received  8/24/2007  
received 1 8 & 1/2 x11 lighting comp . taken to Dan S.
Plan resubmittals received  8/21/2007  
Received 1 (4pg) plan review responce letter, new cert of value, flush pulls info from Trimco, 3 form ecoresin info/calcs, Idaho truss calcs, sheet 1 of 1 for roof truss layout, sheets A2, A6, A8, 2 copies of sheets A1, A2, A3, A4, A5, A6, A7, A8 and taken to Dan Stuart
Plan Reviewer's activity  8/13/2007 DONE
E-mail and phone call exchange with duane Marler concerning requirements for accessible lavs in restrooms and requirement for sink in breakroom to be accessible if a sink is provided.
Plan Reviewer's activity  8/13/2007 DONE
E-mails from Duane Marler concerning accessible restroom lavs, breakroom sink and service sink in message room.
Telephone call  7/24/2007 DONE
Call from duane concerning plan review and number of restrooms required for this tenant. Reviewed Ch. 29 and method to determine occupanct load. Says he did not receive copy of plan review as he had recently changed computers. I e-mailed and faxed him a copy.
1st review completed  7/19/2007 FAIL
Routing - FIRE7/16/2007 7/19/2007 PASS
Attached review commens to plans.
Plan resubmittals requested  7/16/2007 DONE
Copy of plan review e-mailed to Duane Marler.
Override - Parcel Holds  7/16/2007  
Routing - PLAN CHECK7/6/2007 7/16/2007 FAIL
Resubmittals required. Plan review repoirt e-mailed to architect for response. Plans routed to fire code analyst for review.
Routing - PLUMBING7/2/2007 7/6/2007 PASS
as per plan and 2003 U.P.C. 2. provide hot water limitation for public laves 120 degree max.
Routing - PUBLIC WORKS6/27/2007 7/2/2007 PASS
Pending Assignment by MYS6/11/2007 6/27/2007 DONE
6/27/2007 10:27:19 MYS - activity updated through activity BLDA168 from case BLD07-01485.
Override - Parcel Holds  6/11/2007  
Recd Pcfee & Taken To Pln CK  6/11/2007  
this is for submittal
Plans ACCEPTED BY PLAN TECH  6/11/2007  
load calcs ?
Application received  6/8/2007