Second Notice BLD | 1/9/2008 | 1/9/2008 | 1/15/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 12/5/2007 | 1/9/2008 | | DONE |
|
|
|
|
Permanent Occupancy | | | 12/5/2007 | | DONE |
|
|
|
|
BLD-Final | 12/3/2007 | 12/4/2007 | 12/4/2007 | A | PASS |
Jim Storey
|
|
|
keith Phone #: ###-####
|
Code Occupancy Approval | 11/28/2007 | 11/28/2007 | 11/28/2007 | P | PASS |
Dena Gambrel
|
|
|
|
Code Occupancy Approval | 11/16/2007 | 11/16/2007 | 11/16/2007 | P | FAIL |
Dena Gambrel
|
|
|
11-16-07 Failed. Correction Notice Issued.
|
FIRE-Final Inspection | 11/13/2007 | 11/14/2007 | 11/14/2007 | A | PASS |
Forrest France
|
|
|
Life safety inspection passed per K. Roule.
|
FIRE-Final Inspection | 11/12/2007 | 11/13/2007 | 11/13/2007 | P | FAIL |
Forrest France
|
|
|
approved plan notes were not on site, they were not ready for life safety.
|
BLD-Energy code compliance | 10/4/2007 | 10/4/2007 | 10/4/2007 | P | PASS |
Jim Storey
|
|
|
Keith Phone #: ###-####
|
BLD-Framing/Rough-in | 9/28/2007 | 10/1/2007 | 10/1/2007 | A | PASS |
Tom Arcoraci
|
|
|
keith Phone #: ###-####
|
BLD-Framing/Rough-in | 9/26/2007 | 9/27/2007 | 9/27/2007 | P | PASS |
Jim Storey
|
|
|
keith Note: fire radiant faucet Phone #: ###-#### soffit ok for cover.
|
BLD-Framing/Rough-in | 9/18/2007 | 9/19/2007 | 9/19/2007 | P | PASS |
Jim Storey
|
|
|
keith Phone #: ###-#### roof and wall nailling ok for cover
|
BLD-Wall cover | 8/21/2007 | 8/22/2007 | 8/22/2007 | A | PASS |
Jim Storey
|
|
|
Keith; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
(F) Reprint permit | | | 8/22/2007 | | |
|
|
|
|
BLD-Footing | 8/20/2007 | 8/21/2007 | 8/21/2007 | A | PASS |
Jim Storey
|
|
|
keith Phone #: ###-####
|
Issue PAID IN FULL permit | | | 8/20/2007 | | DONE |
|
|
|
|
Telephone call | | | 7/25/2007 | | DONE |
|
|
|
left vm for wes steele at ###-#### - permit ready and fees given - also need ACHD receipt
|
Permit Ready to Issue | | | 7/25/2007 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/13/2007 | | 7/24/2007 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/24/2007 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/24/2007 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 6/11/2007 | | 7/24/2007 | | PASS |
|
|
|
7/24/2007 14:12:22 JCM - activity updated through activity BLDA022 from case BLD07-01488.
|
Routing - PLAN CHECK | 7/11/2007 | | 7/13/2007 | | |
|
|
|
|
Routing - FIRE | 7/13/2007 | | 7/13/2007 | | PASS |
|
|
|
Attached updated review comments to plans.
|
Meeting | | | 7/13/2007 | | DONE |
|
|
|
Met with Dave Hanneman regarding the FD access to this building. Dave has agreed not to require fire sprinklers within this building or require supplemental fire protection. Plans have been approved and routed to Plan Check.
|
1st review completed | | | 7/11/2007 | | FAIL |
|
|
|
|
Routing - FIRE | 7/5/2007 | | 7/11/2007 | | FAIL |
|
|
|
Fax failed. Emailed resubmittal items to architect. Attached IFC review comments to permit online and to plans.
|
Routing PW Solid Waste | 7/5/2007 | | 7/5/2007 | | PASS |
|
|
|
Trash enclosure ok.
|
Routing - PUBLIC WORKS | 7/3/2007 | | 7/5/2007 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 7/3/2007 | | DONE |
|
|
|
Inserted revisions for Public Works, reviewed and approved plans and routed to Public Works. JCM
|
Routing - PLANNING | 6/21/2007 | | 7/2/2007 | | PASS |
|
|
|
Josh W.
|
Routing Off Site - STRUCTURAL | 6/11/2007 | | 6/27/2007 | | PASS |
|
|
|
called action couriers for pick up - Received comment letter from consulting structural engineer with one comment that I verified as adequate as designed. JCM
|
Routing - PLUMBING | 6/15/2007 | | 6/21/2007 | | PASS |
|
|
|
Need to combine vent piping to 4' V.T.R. to equal 12.56. As per plan & 2003 U.P.C./J.J
|
Routing - Erosion and Sediment | 6/15/2007 | | 6/15/2007 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 6/11/2007 | | 6/15/2007 | | FAIL |
|
|
|
|
Routing PW Sewer Rating | 6/14/2007 | | 6/15/2007 | | PASS |
|
|
|
|
Plan resubmittals received | | | 6/15/2007 | | DONE |
|
|
|
received 1 transmittal,and 2 copys of sheet D S taken to John M.
|
Routing PW Street Lights | 6/13/2007 | | 6/14/2007 | | PASS |
|
|
|
|
Routing PW Solid Waste | 6/12/2007 | | 6/14/2007 | | FAIL |
|
|
|
Trash enclosure detail is required showing minimum interior dimensions of 11' wide x 8' deep. Gate opening must be at least 11' with gates opening 180 degrees.
|
Routing PW Sewer Design | 6/12/2007 | | 6/13/2007 | | PASS |
|
|
|
|
Routing PW Drainage | 6/12/2007 | | 6/12/2007 | | PASS |
|
|
|
|
Routing - Addressing | 6/11/2007 | | 6/11/2007 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 6/11/2007 | | 6/11/2007 | | PASS |
|
|
|
|
Application received | | | 6/11/2007 | | |
|
|
|
|
Pending Assignment by MYS | 6/11/2007 | | 6/11/2007 | | DONE |
|
|
|
6/11/2007 13:25:30 JCM - activity updated through activity BLDA166 from case BLD07-01488.
|
Recd Pcfee & Taken To Pln CK | | | 6/11/2007 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/11/2007 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 6/11/2007 | | |
|
|
|
|