Permit Information
Permit NumberBLD07-01506
StatusFinaled
Name FALASH & ROSS CONSTRUCTION
Site Address 6573 W OVERLAND RD
Project NameBorah Heights Retail Shell Bui
Customer Number 
ePlanReviewNo
Description
Borah Heights Retail Shell Building - To construct a new 5,950 square foot, one story, wood framed retail shell building and related site improvements. This is a shell permit only and no occupancy is allowed under this permit. Separate tenant improvement permits will be required to finish this building for occupancy. NOTE: NO A-2 RESTAURANT OCCUPANCIES WILL BE ALLOWED UNLESS THE BUILDING IS FULLY FIRE SPRINKLED OR THE RESTAURANT IS LOCATED IN A SEPARATE FIRE AREA. All construction per the approved plans. JCM
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
PubWorks Occupancy Approval2/3/20102/3/20102/3/2010 DONE
DetailsTiffany Lowery
BLD-Final4/23/20084/23/20084/24/2008PPASS
DetailsTom Arcoraci
As per George Slane, letter from architect, landings are approved
Letter of compliance  4/23/2008 DONE
DetailsCathy Weisshaupt
Letter of Compliance issued
Code Occupancy Approval3/21/20083/21/20083/25/2008PPASS
DetailsScott M.Brown
PARKING AND LANDSCAPE IN AS REQUIRED OK FOR FINAL
Code Occupancy Approval3/25/20083/25/20083/25/2008PPASS
DetailsScott M.Brown
PARKING LOT MARKED CASE CLOSED FINAL OK
BLD-Final3/19/20083/19/20083/19/2008PFAIL
DetailsTom Arcoraci
dean Phone #: ###-#### needs landings at rear doors
FIRE-Final Inspection3/13/20083/13/20083/13/2008PPASS
DetailsTroy Cobbley
Life safety passed.
BLD-Final3/11/20083/13/20083/13/2008ANR
DetailsTom Arcoraci
dean Phone #: ###-#### needs fire and code enf sign offs
FIRE-Conference3/3/20083/4/20083/4/2008AFAIL
DetailsTroy Cobbley
Provide address facing overland and the side street as discussed. Remove the short sample tubes in the duct smoke detectors and relocate the long tube to the lower position. Also provide the correct remote annunciators and test the duct smoke detectors.
BLD-Framing/Rough-in1/11/20081/11/20081/11/2008PPASS
DetailsTom Arcoraci
dean Phone #: ###-####
BLD-Framing/Rough-in11/7/200711/8/200711/8/2007APASS
DetailsTom Arcoraci
Dean; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ext and roof ok
BLD-Framing/Rough-in10/23/200710/24/200710/24/2007APART
DetailsTom Arcoraci
dean Phone #: ###-####
BLD-Foundation9/13/20079/13/20079/13/2007PPEND
DetailsJim Sly
donny - wall Phone #: ###-####
MTI Inspected footings.......Wall appears OK pending special insp (MTI) tests and approvals.
BLD-Footing9/11/20079/12/20079/12/2007ANR
DetailsTom Arcoraci
don Phone #: ###-#### needs zoning
(F) Reprint permit  9/7/2007  
Issue PAID IN FULL permit  9/6/2007 DONE
Routing - PUBLIC WORKS9/4/2007 9/5/2007 PASS
Routing - PLAN CHECK9/5/2007 9/5/2007 PASS
PLANS/APPL TAKEN TO FRONT DESK  9/5/2007 DONE
Inspection Record Card- Bld  9/5/2007 DONE
Telephone call  9/5/2007 DONE
left message w jennie for mike falash at ###-#### - permit ready and fees given - also need RP name
Permit Ready to Issue  9/5/2007 DONE
Plan assigned to (JCM)6/12/2007 9/5/2007 PASS
9/5/2007 11:33:48 JCM - activity updated through activity BLDA022 from case BLD07-01506.
Routing PW Drainage6/13/2007 9/5/2007 PASS
DetailsBrian Murphy
Routing - PLAN CHECK8/30/2007 9/4/2007  
Routing - FIRE8/27/2007 8/30/2007 PASS
Attached updated review comments to plans.
Routing PW Solid Waste8/27/2007 8/28/2007 PASS
Plan resubmittals received  8/28/2007  
Recieved 3 copies of Storm Water Plan and 1 copy of Boundry Drainage and given to Brian Murphy///8/28/07 @ 11:12am BAS
Routing - PUBLIC WORKS8/14/2007 8/27/2007 FAIL
Plan Reviewer's activity  8/14/2007 PASS
Reviewed and approved structural revisions. JCM
Routing - PLAN CHECK7/24/2007 8/14/2007  
Plan resubmittals received  8/13/2007  
received 1 letter,1 response,1 comments ,1 comments (fire),2 calcs , and 2 copys of sheets A1.01,S0.2,S3.1,S4.1,C2.11,C2.21,C2.22,C2.31,C2.32,C2.41,C2.43,C2.51 taken to John M
Routing - PLANNING7/20/2007 7/24/2007 PASS
Josh Johnson
Josh Wilson
Routing - PLANNING6/21/2007 7/24/2007 PASS
Routed to Plan Check
Routing - FIRE7/17/2007 7/20/2007 FAIL
Faxed and emailed resubmittal items to architect.
1st review completed  7/20/2007 FAIL
Routing - PLAN CHECK7/20/2007 7/20/2007 PEND
Pending approval by others.
Routing - PLANNING Land Div7/20/2007 7/20/2007 PASS
Joan Johnson- verification passed
Routing - PLAN CHECK7/11/2007 7/17/2007 PASS
Plan Reviewer's activity  7/17/2007 PASS
Plan approved with attached comment list.
Routing - PLANNING7/11/2007 7/11/2007 PASS
Routing - PLANNING Land Div7/11/2007 7/11/2007 FAIL
Site plan showing land division not approved or not according to recorded plat.
Joan spoke to Byron Folwell, ###-####, Architect regarding land division issues - either the site plan is to be reformatted to match existing lot lines and the approved CUP. or the formal land division process must be completed through the Boise City process, and recorded at Ada County.
Telephone call  7/11/2007  
DetailsDave Abo
Joan spoke to Byron Folwell, ###-####, Architect regarding land division issues - either the site plan is to be reformatted to match existing lot lines and the approved CUP. or the formal land division process must be completed through the Boise City process, and recorded at Ada County.
Routing - PLAN CHECK7/2/2007 7/11/2007  
John M. - Returned plans to Land Division to verify legal lot situation. JCM
Routing - PLUMBING6/14/2007 6/21/2007 PASS
1) Increase FD-1 to 4' to recieve discharge from R.P. or install D.C.V.A for premise protection (BFP-1)
2) Use Boise City approved grease interceptor detail attached
J.J.
Routing Off Site - STRUCTURAL6/12/2007 6/20/2007 FAIL
Called Action Couriers for pick up - Received comment list from the consulting structural engineer requesting revisions.
Plan resubmittals requested  6/20/2007 DONE
Faxed the architect a copy of the structural plan review requesting revisions.
Routing - Erosion and Sediment6/14/2007 6/15/2007 PASS
ESC plan approved with attached conditions.
Routing PW Environmental6/15/2007 6/15/2007 PASS
Pretreatment review - shell and core shows GI with common grease line to all tenant spaces
Routing PW Solid Waste6/13/2007 6/14/2007 FAIL
Trash truck cannot approach enclosure from the south against one-way traffic. Angle the enclosure so trash truck has direct access coming from the east, or move enclosure to southeast planting strip and angle it so truck has direct access approaching from the east.
Routing - PUBLIC WORKS6/13/2007 6/14/2007 FAIL
Routing - PLANNING Land Div6/12/2007 6/13/2007 PASS
Routing PW Street Lights6/13/2007 6/13/2007 PASS
Application received  6/12/2007  
Plans ACCEPTED BY PLAN TECH  6/12/2007  
Plan routing begun/NEW & ADDTN  6/12/2007  
Routing PW Drainage8/28/2007    
Recieved 3 copies of Storm Water Plan and 1 copy of Boundry Drainage and given to Brian Murphy///8/28/07 @ 11:12am BAS
Routing PW Drainage8/14/2007