Permit Information
Permit NumberBLD07-01553
StatusFinaled
Name DAVE EVANS CONSTRUCTION
Site Address 6428 W INTERCHANGE LN
Project NameINTERCHANGE LOT #3
Customer Number 
ePlanReviewNo
Description
(Shell Only) Located on Lot #3 of Interchange Subdivision. To construct a new 2750 square foot office shell. This building will be constructed of 2X6 wood frame exterior walls and manufactured wood truss roof construction. This is a shell permit only and no occupancy is allowed under this permit. Separate tenant improvement permits will be required to finish this building for occupancy. This building is not fire sprinkled. All construction per the approved plans and attached documents. TLW / Josh W. DRH06-00486
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD9/22/20089/22/200810/30/2008 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Second Notice BLD8/11/20088/11/20089/22/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice5/28/20085/28/20088/11/2008 DONE
DetailsTom Arcoraci
Letter of compliance  6/16/2008 DONE
DetailsMarsha Smylie
letter of compliance issued
BLD-Final5/28/20085/28/20085/28/2008PPASS
DetailsTom Arcoraci
steve Phone #: ###-####
DOC - Permit Finaled5/28/20085/28/20085/28/2008PPASS
DetailsTom Arcoraci
Code Occupancy Approval5/20/20085/20/20085/20/2008APASS
DetailsScott M.Brown
OK FOR FINAL
BLD-Final4/25/20084/28/20084/28/2008ANR
DetailsJim Sly
steve Phone #: ###-#### Note: please call 1/2 hr prior to inspection
Need Zoning and P/W....
Case Summary (BLD)  3/14/2008 DONE
BLD-Aging Inspection2/26/20082/26/20082/26/2008 NR
DetailsTom Arcoraci
no call for inspection
FIRE-Final Inspection12/3/200712/3/200712/3/2007PPASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection11/27/200711/27/200711/27/2007PFAIL
DetailsTroy Cobbley
Need to have original copy of approved set of plans with plan review notes on site.Also need to add building address on front of building.Per KR
BLD-Framing/Rough-in11/8/200711/9/200711/9/2007PPASS
DetailsTom Arcoraci
keith Phone #: ###-####
BLD-Framing/Rough-in10/1/200710/2/200710/2/2007APART
DetailsTom Arcoraci
Keith Phone #: ###-#### nailing ok drywall installed west side
BLD-Footing8/23/20078/24/20078/24/2007APASS
DetailsTom Arcoraci
steve Phone #: ###-####
(F) Reprint permit  8/21/2007  
Issue PAID IN FULL permit  8/13/2007 DONE
Routing - PLAN CHECK7/18/2007 7/19/2007 PASS
PLANS/APPL TAKEN TO FRONT DESK  7/19/2007 DONE
Inspection Record Card- Bld  7/19/2007 DONE
Telephone call  7/19/2007 DONE
t/c w wes steele at ###-#### - permit ready and fees given - also need ACHD receipt
Permit Ready to Issue  7/19/2007 DONE
Routing - PUBLIC WORKS7/18/2007 7/18/2007 PASS
Routing PW Sewer Rating7/18/2007 7/18/2007 PASS
Routing PW Sewer Rating6/20/2007 7/18/2007 PASS
Per other entry by Pam Williams.
Routing PW Solid Waste6/19/2007 7/18/2007 PASS
Bldg will be served by enclos at far west end of deveopment. Enclosure is drive-on accessible.
CHANGE STATUS TO (REV)  7/13/2007 DONE
was put to fee status by mistake , put back to rev///dld
Routing - PLAN CHECK7/9/2007 7/12/2007 PEND
Plan Reviewer's activity  7/12/2007 DONE
About to issue permit noticed no public works sign off. Pam failed plan I called wes steele to tell him the status and what was still needed. I will hold plans here until public works issues are resolved. TLW
Plan assigned to (TLW)7/2/2007 7/12/2007 PASS
7/12/2007 09:20:17 TLW - activity updated through activity BLDA022 from case BLD07-01553.
1st review completed  7/11/2007 DONE
Routing - FIRE7/3/2007 7/9/2007 PASS
Attached review comments to plans.
Routing - PLAN CHECK6/28/2007 7/3/2007 PEND
Routed to fire.
Case Summary (BLD)  7/3/2007 DONE
Plan assigned to (JCM)6/18/2007 7/2/2007 DONE
Re-assigned to Tim W.
Routing - PLANNING2/26/2007 6/28/2007 PASS
Josh W. DRH06-00486
Routing - PLUMBING6/22/2007 6/26/2007 PASS
per plan and 2003 UPC
Routing - Erosion and Sediment6/21/2007 6/22/2007 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS6/18/2007 6/21/2007 FAIL
needs solid waste review
Routing PW Street Lights6/19/2007 6/20/2007 PASS
Routing PW Drainage6/19/2007 6/20/2007 PASS
Routing - PLANNING Land Div6/18/2007 6/18/2007 PASS
Plans ACCEPTED BY PLAN TECH  6/15/2007  
Application received  6/15/2007  
Plan routing begun/NEW & ADDTN  6/15/2007