Permit Information
Permit NumberBLD07-01555
StatusFinaled
Name PETRA INC
Site Address 4724 W STATE ST
Project NameCOLLISTER SHOPPING CNTR
Customer Number 
ePlanReviewNo
Description
(BOISE NEIGHBORHOOD LIBRARY - COLLISTER SHOPPING CENTER) Remodel changing occupancy from a former retail space to a new 12,169 sq. ft. assembly library tenant with associated office and storage per approved plans and DRH07-00262. This building is a one-hour rated building. (Type V-A Construction) Work to include some interior demolition work, removing portions of the existing front CMU exterior wall, some new structural steel work for new exterior window and door openings at front exterior wall, new interior walls and doors, new interior finish, new restrooms, fire sprinkler and alarm work, mechanical work including some new units, plumbing work, and electrical work. Special Inspection is required for structural steel work/welding and for epoxy/adhesive anchor installations. The west wall of this tenant space is an existing 2-hour rated fire wall with a 30" minimum parapet. Nonseparated Uses per IBC Section 302.3.1. A Certificate of Occupancy is to be issued when completed and approved. NOTE: This building is fully fire sprinklered for area increase. JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  11/14/2014 DONE
Third Notice BLD6/6/20086/6/20087/29/2008 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Second Notice BLD4/23/20084/23/20086/6/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 4/2/20084/23/2008 DONE
Permanent Occupancy  4/2/2008 DONE
BLD-Final3/14/20083/17/20083/17/2008PPASS
DetailsTony Young
Terry; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
work is ok,, other electrical work is attached to permit but is for other building?? appears that 336 signed off
FIRE-Final Inspection3/14/20083/17/20083/17/2008APASS
DetailsTroy Cobbley
Life safety passed
BLD-Final2/5/20082/6/20082/6/2008APART
DetailsTony Young
j.c. Phone #: ###-####
temp occ ok,, need full sign offs from trades, zoning, etc.,, need revised drawings for records as built,, steel beams not used,, no special inspections needed
FIRE-Final Inspection2/4/20082/5/20082/5/2008APART
DetailsTroy Cobbley
A temporary occupancy was given with sam rogers permission until the correct door hardware is provided on the northwest exit doors.
BLD-Final1/31/20082/1/20082/1/2008PNR
DetailsDave Hannah
adam Phone #: ###-#### needs fire sign off
FIRE-Final Inspection1/31/20082/1/20082/1/2008AFAIL
DetailsTroy Cobbley
The emergency light in the breakroom still does not work and now the emergency light next to it right infront of the double doors does not work. Sam will allow a temp for the remaining item which is the door hardware on the northwest door.
FIRE-Final Inspection1/30/20081/31/20081/31/2008AFAIL
DetailsTroy Cobbley
Repair the emergency light in the breakroom, repair the exit discharge light out of the northwest door and provide automatice flush bolts as discussed on the narrow leaf of the same door.
BLD-Final1/30/20081/31/20081/31/2008PCANC
DetailsTony Young
terry Phone #: ###-####
Code Occupancy Approval Temp1/24/20081/24/20081/24/2008PDONE
DetailsMichael Garner
site inspection complete - this appears to be part of a larger project through Colliers, on this property - onsite contractor Petra, was not sure that the bike rack and parking striping was their responsibility or Colliers - the DRH doesn't make it clear as well - I told Terry, onsite Petra contractor that I would sign for a temporary knowing the striping cannot be done now because it is too cold, and the bike rack can wait - I gave Terry my business card and told him to telephone me; or, have senior general contractor, JC, telephone me when they've figured out the striping and bike rack issue[s] - I've scheduled a re-inspection for February 15th, the approx. time the library expects to be open so that I can ensure all the work is being completed
COD-Stop Work/Reinspection Fee1/24/20081/24/20081/24/2008PCANC
DetailsMichael Garner
BLD-Framing/Rough-in12/7/200712/7/200712/7/2007PPASS
DetailsTony Young
terry Phone #: ###-####
columns
BLD-Conference11/26/200711/26/200711/26/2007PPART
DetailsTony Young
terry - please call 1/2 hr prior to inspection Phone #: ###-####
?s on building service,, and location of service,, met w/324, and confirmed one building due to parapet wall
BLD-Framing/Rough-in11/19/200711/20/200711/20/2007APART
DetailsTony Young
terry Phone #: ###-####
front columns ok pending special inspection on welds
BLD-Framing/Rough-in10/4/200710/5/200710/5/2007APART
DetailsTom Arcoraci
terry Phone #: ###-#### interior walls only
Issue & PRINT to be Invoiced  8/20/2007 DONE
Routing - PLAN CHECK8/4/2007 8/15/2007 PASS
Permit and plans approved and taken to front desk.
Plan resubmittals received  8/15/2007 DONE
received 1 transmittal, & 3 copys of sheet E2.0L taken to Jason B.
PLANS/APPL TAKEN TO FRONT DESK  8/15/2007 PASS
Print Pending Permit.LaserJet4  8/15/2007  
Print Occupancy Form  8/15/2007 DONE
Telephone call  8/15/2007 DONE
called Rob ext 3914
Plan assigned to (JCB)6/29/2007 8/15/2007 PASS
8/15/2007 13:47:27 JCB - activity updated through activity BLDA022 from case BLD07-01555.
Routing - FIRE8/3/2007 8/4/2007 PASS
Attached updated review comments to plans.
Telephone call  8/3/2007 DONE
Called Steve Trout to let him know the Fire Review comments about fire exitinguishers to be shown on sheet A2.1 were not addressed. Also mentioned Occupant Load signage numbers noted are not correct. Steve said he could provide updated A2.1 sheets today. I will insert and route to Fire for review and then review all resubmittal items when I am back in the office the week of 8/13.
Plan resubmittals received  8/3/2007  
Recieved transmittal and two copies of page A2.1; taken to Jason Blais
Routing - PLAN CHECK7/25/2007 8/3/2007 FAIL
Routing plans to Fire for review of resubmittals first. Will review resubmittals after Fire review.
Plan resubmittals received  8/2/2007  
Received 7pg. response letter, application for Project Start up for Special Inspections, revised certificate of value, memo from Electrical Engineering Comany, letter from Musgrove Engineering, and two copies of cover page, and pages A2.0, A2.1, A2.2, A2.3, A4.1, A5.1, A8.1, A9.4, A9.5, M1.1, E2.0L, E2.0P, E2.0S, E3.1; taken to Jason Blais
1st review completed  7/25/2007 FAIL
Routing - FIRE7/23/2007 7/25/2007 FAIL
Emailed and faxed resubmittal items to architect. Attached IFC review comments to plans.
Routing - PLAN CHECK7/2/2007 7/23/2007 FAIL
Plan review report e-mailed to architect. Report also attached to this case under "Documents". A written response and plan resubmittals are required to be submitted for review. The plans will now route to the Fire Department for review.
Meeting  7/23/2007 DONE
Meeting with Marlene Southard and Carl Westfall on some code interpretation items that relate to this project.
Plan resubmittals requested  7/23/2007 DONE
Plan resubmittals and written response required for further review.
Plan resubmittals received  7/13/2007  
Received 1 cover transmittal letter, 1 copy of structural calcs, 2 copies of sheets S1.0, S2.0 and taken to Jason Blais
Telephone call  7/9/2007 DONE
Talked with Rob Bousfield concerning the project. He stated updated structural plans and calculations will be forthcoming.
Routing - PLANNING7/2/2007 7/2/2007 PASS
Josh Wilson DRH07-00262
Routing - PUBLIC WORKS6/29/2007 7/2/2007 PASS
Routing PW Sewer Rating6/29/2007 6/29/2007 PASS
Pending Assignment by MYS6/18/2007 6/29/2007 DONE
6/29/2007 10:47:02 MYS - activity updated through activity BLDA184 from case BLD07-01555.
Recd Pcfee & Taken To Pln CK  6/18/2007 DONE
Plans ACCEPTED BY PLAN TECH  6/18/2007  
Application received  6/15/2007