Telephone call | | | 4/15/2011 | | DONE |
|
|
|
left message w scott for molli to call me back regarding past due fees
|
Third Notice | | 3/4/2011 | 3/2/2011 | | DONE |
|
|
|
|
Third Notice | | 2/9/2011 | 2/18/2011 | | DONE |
Tisha Gallop
|
|
|
faxed and mailed to tenant at project address
|
Second Notice | | 2/3/2011 | 2/4/2011 | | DONE |
|
|
|
|
First Notice | 12/27/2010 | 12/27/2010 | 1/6/2011 | | DONE |
Mike Jordan
|
|
|
mailed to whitworth on the 6th - came back - mailed to computers for kids on the 12th
|
BLD-Conference | 12/27/2010 | 12/27/2010 | 12/27/2010 | P | CANC |
Mike Jordan
|
|
|
|
BLD-Conference | 12/23/2010 | 12/27/2010 | 12/27/2010 | A | PASS |
Mike Jordan
|
|
|
tammy Phone #: ###-####
|
DOC - Permit Finaled | 12/27/2010 | 12/27/2010 | 12/27/2010 | P | PASS |
Mike Jordan
|
|
|
All storage has been removed from mezzanine. Letter of compliance was issued.
|
BLD-Final | 12/17/2010 | 12/17/2010 | 12/17/2010 | P | FAIL |
Mike Jordan
|
|
|
tammy Phone #: ###-####. Notedstorage on top of mezz. above vault, no storage allowed, engineered for office load only(156psf.) Needs to remove storage or provide engineering showing that mezz. is capable of storge loads per IBC.
|
FIRE-Final Inspection | 12/16/2010 | 12/16/2010 | 12/16/2010 | P | PASS |
Troy Cobbley
|
|
|
life safety passed.
|
FIRE-Conference | 12/2/2010 | 12/9/2010 | 12/9/2010 | A | DONE |
Troy Cobbley
|
|
|
Per Tammy things should be complete soon.
|
FIRE-Conference | 12/2/2010 | 12/2/2010 | 12/2/2010 | P | DONE |
Troy Cobbley
|
|
|
I stopped at the project and spoke to Tammy about the need to get the building permit and the project related fire sprinkler permit finaled. I left a correction notice stating the above and also let her know that possibly an extension could be granted by Jennifer but that ultimately if the inspections were not finished I would be forwarding the permit information to a supervisor as per the aging permit policy. A follow up inspection has been set up for next week.
|
BLD-Aging Inspection | 11/18/2010 | 11/18/2010 | 11/24/2010 | | PEND |
Mike Jordan
|
|
|
|
FIRE-Conference | 4/22/2010 | 4/23/2010 | 4/23/2010 | A | DONE |
Troy Cobbley
|
|
|
I stopped at the job site and found that the restroom has been installed and stairs have been installed to the mezzanine both are lacking sprinkler protection. I spoke to Molli and Tammy about getting the permit finished.
|
BLD-Conference | 6/24/2008 | 6/24/2008 | 6/24/2008 | A | PASS |
Mike Jordan
|
|
|
Called and spoke with Tammy to inquire status of job. Tammy noted that they are almost completed. They are waiting for items that are on back order, but hoped to be completed fairly soon.
|
BLD-Final | 12/4/2007 | 12/4/2007 | 12/4/2007 | P | NR |
Mike Jordan
|
|
|
molly Phone #: ###-####
|
FIRE-Final Inspection | 12/4/2007 | 12/4/2007 | 12/4/2007 | P | PART |
Troy Cobbley
|
|
|
Fire approval for temporary occupancy was given with dave hannimans permission until the restroom in the vault is complete and the mezzanine is complete.
|
BLD-Energy code compliance | 10/24/2007 | 10/25/2007 | 10/25/2007 | A | PASS |
Mike Jordan
|
|
|
tammy - please call 1/2 hr prior to inspection Phone #: ###-####. ok to cover
|
BLD-Framing/Rough-in | 10/15/2007 | 10/15/2007 | 10/15/2007 | P | PASS |
Mike Jordan
|
|
|
Molly or Tammy Phone #: ###-####framing for offices in warehouse only. ok to insul.
|
BLD-Foundation | 9/12/2007 | 9/12/2007 | 9/12/2007 | P | PART |
Mike Jordan
|
|
|
Dan; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. wip. Needs to add stirups over doorway.
|
BLD-Footing | 9/5/2007 | 9/5/2007 | 9/5/2007 | P | PASS |
Mike Jordan
|
|
|
Molly; Phone #: ###-#### Internet Inspection Request from: Hattie James
|
Telephone call | | | 8/7/2007 | | DONE |
|
|
|
left vm for thomas whitworth at ###-#### - permit ready and fees given - also need gc name and rce#
|
Permit Ready to Issue | | | 8/7/2007 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/7/2007 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 8/6/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/6/2007 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/6/2007 | | DONE |
|
|
|
|
Plan assigned to (R_H) | 6/29/2007 | | 8/6/2007 | | PASS |
|
|
|
8/6/2007 10:29:40 RMH - activity updated through activity BLDA022 from case BLD07-01561.
|
Plan resubmittals received | | | 8/3/2007 | | |
|
|
|
Received 1 cover transmittal, 3 copies of sheets A2-2, E1-0, E2-1L, E2-1P and taken to Ron Hill
|
Routing - FIRE | 7/20/2007 | | 7/24/2007 | | PASS |
|
|
|
Attached IFC review comments to plans.
|
1st review completed | | | 7/24/2007 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 7/20/2007 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/5/2007 | | 7/20/2007 | | PASS |
|
|
|
|
Routing - PLANNING | 7/2/2007 | | 7/5/2007 | | PASS |
|
|
|
Sarah Schafer DRH06-00084 (verify additional square footage for mezzanine) - Application is approved per the DR and the Conditional Use permit which allows for 40% office per building or 75% of office per tenant. (Application is only at 33.5% if mezzanine space is used for office.)
|
Routing - PUBLIC WORKS | 6/29/2007 | | 7/2/2007 | | PASS |
|
|
|
|
Routing PW Sewer Rating | 7/2/2007 | | 7/2/2007 | | PASS |
|
|
|
|
Pending Assignment by MYS | 6/19/2007 | | 6/29/2007 | | DONE |
|
|
|
6/29/2007 12:02:24 MYS - activity updated through activity BLDA175 from case BLD07-01561.
|
Plans ACCEPTED BY PLAN TECH | | | 6/18/2007 | | DONE |
|
|
|
Waited for Architect to bring in restroom elevations and key plan before process permit application and plans
|
Recd Pcfee & Taken To Pln CK | | | 6/15/2007 | | DONE |
|
|
|
|
Application received | | | 6/15/2007 | | |
|
|
|
|
Routing - PLAN CHECK | 7/24/2007 | | | | |
|
|
|
|