Case Summary (BLD) | | | 5/6/2008 | | DONE |
|
|
|
|
Second Notice BLD | 1/9/2008 | 1/9/2008 | 1/15/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 12/17/2007 | 1/9/2008 | | DONE |
|
|
|
|
BLD-Final | 12/14/2007 | 12/17/2007 | 12/17/2007 | P | PASS |
Jim Storey
|
|
|
ed cuttlers ###-####//please call 30 min prior to meet becuase he might be in Eagle
|
FIRE-Final Inspection | 12/14/2007 | 12/17/2007 | 12/17/2007 | A | PASS |
Forrest France
|
|
|
Items on correction notice are complete, fire life safety finaled.
|
Permanent Occupancy UNPAID FEE | | | 12/17/2007 | | DONE |
|
|
|
|
FIRE-Final Inspection | 12/13/2007 | 12/14/2007 | 12/14/2007 | A | FAIL |
Forrest France
|
|
|
Missing two fire extinguishers, one for the office area 1st floor and one for the warehouse, need to repair one EM light at the main entry/exit.
|
BLD-Final | 12/13/2007 | 12/14/2007 | 12/14/2007 | P | DEFR |
Jim Storey
|
|
|
ed cuttlers ###-####//please call 30 min prior to meet becuase he might be in Eagle to monday pm
|
BLD-Framing/Rough-in | 12/4/2007 | 12/5/2007 | 12/5/2007 | P | PASS |
Jim Storey
|
|
|
ed - suspended ceiling Phone #: ###-####
|
BLD-Wall cover | 11/7/2007 | 11/7/2007 | 11/7/2007 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/7/2007 at 6:52:38 AM. Contact: ###-####.fire tape ok need access to spr. under stairs.
|
BLD-Framing/Rough-in | 10/31/2007 | 10/31/2007 | 10/31/2007 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/31/2007 at 5:36:37 AM. Contact: ###-####.
|
(F) Reprint permit | | | 10/17/2007 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/17/2007 | | DONE |
|
|
|
picked up and paid for plan mod.
|
Print Occupancy Form | | | 10/10/2007 | | DONE |
|
|
|
|
Telephone call | | | 10/10/2007 | | DONE |
|
|
|
t/c w ben at ###-#### - permit ready and fees given
|
Override - Parcel Holds | | | 10/10/2007 | | |
|
|
|
|
Permit Ready to Issue | | | 10/10/2007 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 10/3/2007 | 10/3/2007 | 10/9/2007 | | PASS |
|
|
|
10/9/2007 09:03:54 DRS - activity updated through activity BLDA022 from case BLD07-01562.
|
Routing - PLAN CHECK | 10/3/2007 | | 10/9/2007 | | PEND |
|
|
|
PLAN MODIFICATION. ROUTING TO PUBLIC WORKS AND THEN FIRE CODE ANALYST FOR REVIEW.
|
Routing - FIRE | 10/9/2007 | | 10/9/2007 | | PASS |
|
|
|
Hnad carried plans to Scott Arellano to review what the plan mod changes are. Scott said not need to review. code requirements can be verified in field based on attached plan review notes.
|
Routing - PUBLIC WORKS | 10/9/2007 | | 10/9/2007 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 10/9/2007 | | 10/9/2007 | | PASS |
|
|
|
Plan modification review completed. Plans red-lined for clarification for clearance between doors in series & modified plan review and permit wordage to cover changes. PW adjusted fee's and fire code analyst did not need to see. Routing to permit desk to issue.
|
Telephone call | | | 10/9/2007 | | DONE |
|
|
|
Reviewed requirement for doors in series to have 48" clear per Sec. 404 ICC/ANSI. Told Cornel I would red-line plans and add note to plan review. He will mark up set of plans for Dawna to review with contractor in field. Plans to permit desk to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/9/2007 | | PASS |
|
|
|
|
Plan Modification Accepted | | | 10/3/2007 | | |
|
|
|
1-Addition of single door thru the stair way to the exterior, for exit from warehouse. 2-Addition of floor drain & domestic water/sewer lines stubs for future fixtures. 3-Addition of 200 amp electrical panel. 3 copies of sheets A-1, A-2, E-1.0, E2.1L, E2.1P & P1.0 and taken to Dan Stuart
|
Issue PAID IN FULL permit | | | 9/26/2007 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/20/2007 | | 9/24/2007 | | PASS |
|
|
|
CUP07-00123 issued 9/17/07 to 527 thru 924 Mc Gregor dr. (Attached to 930 McGregor). 10 day appeal period end 9/27/07 - 5p.m. Ron at Petra was notified. 9/21/07 - Notification from Sarah Schafer, Planning, to go ahead and take plans to permit desk to issue as their are no parties of record to appeal. Plans taken to permit desk and copy of Sarahs directions forwarded to Marlene Southard.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/24/2007 | | PASS |
|
|
|
|
Print Occupancy Form | | | 9/24/2007 | | DONE |
|
|
|
|
Telephone call | | | 9/24/2007 | | DONE |
|
|
|
left vm for cornel larson at ###-#### - permit ready and fees given - also need gc name and rce#
|
Permit Ready to Issue | | | 9/24/2007 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 7/2/2007 | | 9/24/2007 | | PASS |
|
|
|
9/24/2007 06:35:04 DRS - activity updated through activity BLDA022 from case BLD07-01562.
|
Telephone call | | | 9/20/2007 | | DONE |
|
|
|
Ron, Petra construction called to check on this permit. I told him I had signed approved plans back from Planning but I had understood there is a 10 day waiting period per previous e-mail from Sarah Shafer. I will try to locate a copy of the CUP or Sarah Schafer to see if CUP was issued and if the 10 dat waiting period is applicable and call him back.
|
Telephone call | | | 9/20/2007 | | DONE |
|
|
|
Called Ron at Petra Cont. to let him know I had located the CUP07-000123 and there is a 10 day appeal period before permit can be issued - on 9/27/07 after 5 p.m..
|
Meeting | | | 9/20/2007 | | DONE |
|
|
|
Talked with Marlene concerning 10 day appeal period and inability to find data under this permit say8ing I could or could not issue the permit. Sarah Schafer is not available so I e-mailed her concerning this permit. Marlene suggested I talk with Bonnie Cubber to see if she had zoning hearing minutes from 9/17/07. CUP07-000123 / 527-924 W. McGregor Dr. was approved 9/17/07 and there is a 10 day appeal period (9/27/07 - 5 p.m.) before permit can be issued. CUP tied to 930 W. McGregor.
|
Routing - PLANNING | 9/19/2007 | | 9/20/2007 | | PASS |
|
|
|
Approved per the DR and the CU.
Go ahead and take to the permit desk. There was no public testimony on the item so there are no parties of record to appeal.
>>> DAN STUART 9/20/2007 9:55 AM >>>
Sarah,
Is there still a 10 day appeal period? or since the plan is signed can I take to permit desk to issue?
>>> Sarah Schafer 9/17/2007 11:10 AM >>>
Dan,
This one will be heard tonight by the Planning and Zoning Commission. There will be a 10 day appeal period and then we are ready to go.
>>> DAN STUART 8/1/2007 5:49 PM >>>
has been received and approved for this project so I can route plans back to you. I am routing to fire code analyst and they should be back in five days or less. Thanks
|
Routing - PLAN CHECK | 8/7/2007 | | 9/19/2007 | | PEND |
|
|
|
Notified by Sara Schafer to route plans back to Planning for re-review.
|
Routing - PLANNING | 8/6/2007 | | 8/7/2007 | | FAIL |
|
|
|
Applicant has applied for the Conditional Use Permit and will be heard in September. Not able to sign off on building plans until Conditional Use Permit is heard and action taken.
|
Routing - PLAN CHECK | 8/4/2007 | | 8/6/2007 | | PEND |
|
|
|
Routing plans to Planning - Sarah Schafer.
|
1st review completed | | | 8/4/2007 | | |
|
|
|
|
Routing - FIRE | 8/1/2007 | | 8/4/2007 | | PASS |
|
|
|
Attached review comments to plans.
|
Routing Off Site - STRUCTURAL | 7/17/2007 | | 8/1/2007 | | PASS |
|
|
|
Resubmittals for structural engineering concerns were provided with changes on new Sheet S0, S1 & S2. Changes did not required re-review by outside contract firm per letter on file.
|
Routing - PLAN CHECK | 7/5/2007 | | 8/1/2007 | | PEND |
|
|
|
No resubmittals required.
|
Plan resubmittals received | | | 7/17/2007 | | |
|
|
|
received letter of transmittal from larson arch & plan review division fax transmittal (2) pages. also "2" sheets each of SO, S1, & s2//plans taken to Dan Stuart
|
Routing Off Site - STRUCTURAL | 7/2/2007 | | 7/12/2007 | | FAIL |
|
|
|
Sent to outside engineer for review of new mezzanine. 7/12/07 - OUTSIDE STRUCTURAL REVIEW FAILED. CLARIFICATIONS TO PLANS REQUIRED. COPY OF REPORT FAXED TO CORNELL LARSON.
|
Routing - PLANNING | 7/2/2007 | | 7/5/2007 | | FAIL |
|
|
|
Sarah Schafer (DRH04-00210) verify additional square footage for new mezzanine - The building permit plans show an office percentage of 44.6%. Ordinance allows only 25% accessory office space in a project without a conditional use permit. I have notified Larson Architects that a Conditional Use Permit will be required to exceed the 25% office allowance. They will be processing this CU. (The 25% office is per tenant and not for the entire building.)
|
Routing - PUBLIC WORKS | 7/2/2007 | | 7/2/2007 | | PASS |
|
|
|
|
Telephone call | | | 7/2/2007 | | DONE |
|
|
|
called Action Couriers for pick up and deliver to off site engineering
|
Pending Assignment by MYS | 6/15/2007 | | 7/2/2007 | | DONE |
|
|
|
7/2/2007 08:13:41 MYS - activity updated through activity BLDA168 from case BLD07-01562.
|
Routing PW Sewer Rating | 7/2/2007 | | 7/2/2007 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 6/18/2007 | | |
|
|
|
|
Application received | | | 6/15/2007 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/15/2007 | | |
|
|
|
|