Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD07-01574
StatusExpired
Name THAD & RHONDA BURNELLI
Site Address 1621 S PROMONTORY RD
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 770 s.f. addition to a 3172 s.f. existing Single family dwelling to include: remodel the interior for upgraded utility services, add two new bedrooms, expand the Master bedroom with a Two story addition to the North as per approved plans, all red-lining, and Plan review report. This lot is within the hillside area and is subject to the hillside ordinances. A class "A" roof system and defensible area will be maintained. A letter from the applicant's geotechnical engineer indicating that the footing sub-grade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at 384-3946. R-1B Zoning district, and building setbacks as per Planning and Zoning.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Energy code compliance9/9/20079/10/20079/10/2007APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 9/9/2007 at 5:46:33 PM. Contact: ###-####. Framing issues resolved.
BLD-Framing/Rough-in9/6/20079/6/20079/6/2007PPASS
DetailsTony Young
Matt, please 30 minutes prior; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt, need straps, fireblocks,, see Matt,, ok to insulate
BLD-Foundation6/22/20076/22/20076/22/2007PPASS
DetailsJim Storey
ben; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
CHANGE STATUS TO (ISS)  6/22/2007 DONE
Was acidentally changed to REC somehow--BAS
BLD-Footing6/20/20076/20/20076/20/2007PPASS
DetailsDave Hannah
ben - pour time is 3:00 Phone #: ###-####
PubWorks Subgrade Approval6/20/20076/20/20076/20/2007 DONE
FOOTING SUBGRADE APPROVED
Routing Walk-In (BLD)6/18/20076/18/20076/19/2007ADONE
6/19/2007 09:47:32 DLD - activity updated through activity BLDC405 from case BLD07-01574.
Routing - Erosion and Sediment6/18/2007 6/19/2007 PASS
ESC plan approved with attached conditions.
(F) Reprint permit  6/19/2007  
Issue PAID IN FULL permit  6/19/2007 DONE
Telephone call  6/19/2007  
called Chris permit ready to pick up
Plan assigned to (SRZ)6/18/20076/18/20076/18/2007 DONE
Routing Walk-In (Zoning)6/18/20076/18/20076/18/2007ADONE
6/18/2007 11:36:26 SAH - activity updated through activity BLDI252 from case BLD07-01574.
Application received  6/18/2007  
Case Summary (BLD)  6/18/2007  
Case Summary (BLD)  6/18/2007 DONE