BLD-Energy code compliance | 9/9/2007 | 9/10/2007 | 9/10/2007 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 9/9/2007 at 5:46:33 PM. Contact: ###-####. Framing issues resolved.
|
BLD-Framing/Rough-in | 9/6/2007 | 9/6/2007 | 9/6/2007 | P | PASS |
Tony Young
|
|
|
Matt, please 30 minutes prior; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt, need straps, fireblocks,, see Matt,, ok to insulate
|
BLD-Foundation | 6/22/2007 | 6/22/2007 | 6/22/2007 | P | PASS |
Jim Storey
|
|
|
ben; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
|
CHANGE STATUS TO (ISS) | | | 6/22/2007 | | DONE |
|
|
|
Was acidentally changed to REC somehow--BAS
|
BLD-Footing | 6/20/2007 | 6/20/2007 | 6/20/2007 | P | PASS |
Dave Hannah
|
|
|
ben - pour time is 3:00 Phone #: ###-####
|
PubWorks Subgrade Approval | 6/20/2007 | 6/20/2007 | 6/20/2007 | | DONE |
|
|
|
FOOTING SUBGRADE APPROVED
|
Routing Walk-In (BLD) | 6/18/2007 | 6/18/2007 | 6/19/2007 | A | DONE |
|
|
|
6/19/2007 09:47:32 DLD - activity updated through activity BLDC405 from case BLD07-01574.
|
Routing - Erosion and Sediment | 6/18/2007 | | 6/19/2007 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
(F) Reprint permit | | | 6/19/2007 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/19/2007 | | DONE |
|
|
|
|
Telephone call | | | 6/19/2007 | | |
|
|
|
called Chris permit ready to pick up
|
Plan assigned to (SRZ) | 6/18/2007 | 6/18/2007 | 6/18/2007 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 6/18/2007 | 6/18/2007 | 6/18/2007 | A | DONE |
|
|
|
6/18/2007 11:36:26 SAH - activity updated through activity BLDI252 from case BLD07-01574.
|
Application received | | | 6/18/2007 | | |
|
|
|
|
Case Summary (BLD) | | | 6/18/2007 | | |
|
|
|
|
Case Summary (BLD) | | | 6/18/2007 | | DONE |
|
|
|
|