Permit Information
Permit NumberBLD07-01673
StatusFinaled
Name NORTHWEST TECHNOLOGIES
Site Address 314 S 9TH ST Unit: 101
Project NameBODO BLDG #4-Foster Bldg
Customer Number 
ePlanReviewNo
Description
(GREYLOCK REALTY - HISTORIC FOSTER BLDG - 1ST STORY AND BASEMENT) This building is fire sprinklered for story increase and for code trade-offs. To construct interior improvements within the basement (1,734 square feet) and on the 1st story (1,795 square feet) of the Historic Foster Building for a new office occupant. The basement and 1st story will be under the control of a single tenant. Work is to include a new stairway to serve the basement, 2 restrooms accessible to the disabled, interior nonbearing walls, interior doors, interior windows, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  12/19/2008  
Second Notice BLD2/6/20082/6/20082/25/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
Routing - PLUMBING  2/25/2008 PASS
First Notice 12/31/20072/6/2008 DONE
BLD-Final12/28/200712/31/200712/31/2007PPASS
DetailsDave Hannah
craig Phone #: ###-#### ok for perm occ
Permanent Occupancy  12/31/2007 DONE
FIRE-Final Inspection12/27/200712/28/200712/28/2007PPASS
DetailsForrest France
Fire life safety inspection passed, keyed locking hardware at two office doors removed while on site.
BLD-Conference12/18/200712/19/200712/19/2007APART
DetailsDave Hannah
greg Phone #: ###-#### pre final walk
BLD-Other11/7/200711/7/200711/7/2007PDONE
DetailsDave Hannah
greg Note: cover Phone #: ###-####
BLD-Framing/Rough-in11/7/200711/7/200711/7/2007PPASS
DetailsDave Hannah
greg Note: cover Phone #: ###-####
BLD-Conference11/2/200711/5/200711/5/2007ADONE
DetailsDave Hannah
craig Phone #: ###-####
BLD-Conference10/17/200710/18/200710/18/2007APASS
DetailsDave Hannah
craig Phone #: ###-####
Print Occupancy Form  9/19/2007 DONE
Telephone call  9/19/2007  
left message w cassie for craig reisch at ###-#### - permit ready and fees given
Permit Ready to Issue  9/19/2007 DONE
Issue PAID IN FULL permit  9/19/2007  
Routing - PLAN CHECK8/24/2007 9/18/2007 PASS
Completed the resubmittal review. Drawings approved.
Plan assigned to (CJW)7/19/2007 9/18/2007 PASS
9/18/2007 14:41:47 CJW - activity updated through activity BLDA022 from case BLD07-01673.
PLANS/APPL TAKEN TO FRONT DESK  9/18/2007 DONE
Plan resubmittals received  9/11/2007  
received "3" sets of engineering calculations (10) pages each, & "3" sets of plans including A-2.O, A-2.1, A-2.2, A-2.3, A-2.4, M1.O, & S-1.O--plans taken to Carl Westfall
1st review completed  8/24/2007 FAIL
Routing - FIRE8/23/2007 8/24/2007 PASS
Attached IFC review comments to plans.
Routing - PLAN CHECK7/23/2007 8/23/2007 FAIL
The IBC plan review was started on August 21, 2007 and was finished on August 23, 2007. Revised drawings and additional information were required. See the plan review report.
Routing - PUBLIC WORKS7/19/2007 7/23/2007 PASS
Routing PW Sewer Rating7/20/2007 7/20/2007 PASS
Pending Assignment by MYS7/2/2007 7/19/2007 DONE
7/19/2007 14:50:25 MYS - activity updated through activity BLDA172 from case BLD07-01673.
Plans ACCEPTED BY PLAN TECH  6/29/2007 DONE
GC brought 3 new Sheet I-1.0 to insert into plans with the correct changes
Plan Reviewer's activity  6/29/2007  
Per Marlene Southard- she had to go to P & Z and get documents stating that this building is historic, enclosed a copy with directions for George McLean on what to do///6/29/07
Application received  6/25/2007  
Recd Pcfee & Taken To Pln CK  6/25/2007 DONE
Plans ACCEPTED BY PLAN TECH  6/25/2007 FAIL
Missing code information-contacted George McLean-6/25/07 BAS