Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD07-01689
StatusFinaled
Name ST LUKES REG MED CNTR
Site Address 190 E BANNOCK ST
Project NameST LUKES - 4 CENTRAL
Customer Number 
ePlanReviewNo
Description
(ST LUKES - 4 CENTRAL - EXTERIOR WALL/CORRIDOR EXTENSION - 4TH FLR) This building is fully sprinklered. To create an opening through the existing exterior corridor wall and the existing exterior penthouse mechanical/electrical room wall and construct two new exterior walls with a roof, adding approximately 15 sq. ft. to the existing penthouse and changing the use to a storage room with connection to the fourth floor hospital corridor. To install a new rated door between the hospital corridor and the new expansion and storage room, all per the approved plans, red-lined notes on plans and attached plan review clarifications. The integrity of the existing 2-hour floor / roof between the third floor and the new storage area shall be maintained or provided, if not existing, at protection of openings, penetrations or ducts. Verify sprinkler system protection in the addition and storage room. To remove existing mechanical/electrical equipment within the existing penthouse. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 12/26/201012/21/2010 DONE
Second Notice 12/18/201012/21/2010 DONE
First Notice11/30/201011/30/201012/8/2010 DONE
DetailsDave Hannah
BLD-Aging Inspection11/24/201011/24/201011/30/2010 PASS
DetailsDave Hannah
DOC - Permit Finaled11/30/201011/30/201011/30/2010PPASS
DetailsDave Hannah
BLD-Aging Inspection9/22/20109/22/20109/23/2010 PASS
DetailsDave Hannah
BLD-Aging Inspection7/22/20107/22/20107/23/2010 PASS
DetailsDave Hannah
FIRE-Final Inspection8/28/20088/28/20088/28/2008PPASS
DetailsForrest France
Fire life safety approved per last visit-see project activities for details, related fire sprinkler and alarm permits are finaled.
FIRE-Final Inspection1/23/20081/23/20081/23/2008PPASS
DetailsForrest France
Fire life safety finaled.
FIRE-Alarm Testing1/23/20081/23/20081/23/2008PPASS
DetailsForrest France
Project related fire alarm permit has been finaled.
BLD-Aging Inspection11/28/200711/28/200712/4/2007 PASS
DetailsDave Hannah
Issue & PRINT to be Invoiced  8/20/2007 DONE
Routing - PLAN CHECK8/14/2007 8/16/2007 PASS
Plans red-lined and plan review clarifications and description were modified to reflect the change in use from penthouse to storage area. Routing to permit desk to issue.
PLANS/APPL TAKEN TO FRONT DESK  8/16/2007 PASS
Inspection Record Card- Bld  8/16/2007  
Telephone call  8/16/2007 DONE
lft mes for curtis that permit and fees are ready to be picked up
Permit Ready to Issue  8/16/2007 DONE
Plan assigned to (DRS)7/9/2007 8/16/2007 PASS
8/16/2007 15:51:43 DRS - activity updated through activity BLDA022 from case BLD07-01689.
Routing - FIRE8/10/2007 8/14/2007 PASS
Attached review comments to plans.
1st review completed  8/14/2007 PASS
Telephone call  8/10/2007 DONE
Curtis Weedop, SLRMC, the existing rooftop mechanical penthouse is being changed to a storage use and will need to comply with current code for new use. Will redline additional sheetrock coverage for exterior walls and roof system for code compliance with Tables 601 & 602.
Routing - PLAN CHECK7/9/2007 8/10/2007 PEND
No resubmittals required. routing to fire code analyst for review.
Pending Assignment by MYS6/26/2007 7/9/2007 DONE
7/9/2007 12:46:34 MYS - activity updated through activity BLDA168 from case BLD07-01689.
Plans ACCEPTED BY PLAN TECH  6/26/2007  
Recd Pcfee & Taken To Pln CK  6/26/2007 DONE
Application received  6/26/2007  
BLD-Final9/22/20109/23/2010 A 
DetailsDave Hannah
daryl Phone #: ###-####
BLD-Conference7/23/20107/23/2010 A 
DetailsDave Hannah