Third Notice BLD | 3/5/2008 | 3/5/2008 | 3/12/2008 | | DONE |
Cathy Brown
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 1/9/2008 | 1/9/2008 | 3/5/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 12/27/2007 | 1/9/2008 | | DONE |
|
|
|
|
BLD-Final | 12/26/2007 | 12/27/2007 | 12/27/2007 | P | PASS |
Tom Arcoraci
|
|
|
ivan - fire life safety Phone #: ###-#### per plan
|
FIRE-Final Inspection | 12/26/2007 | 12/27/2007 | 12/27/2007 | A | PASS |
Troy Cobbley
|
|
|
Corrections were made per Troys last inspection.KR
|
Permanent Occupancy | | | 12/27/2007 | | DONE |
|
|
|
|
BLD-Final | 12/20/2007 | 12/21/2007 | 12/21/2007 | P | CANC |
Tom Arcoraci
|
|
|
ivan Phone #: ###-####
|
FIRE-Final Inspection | 12/20/2007 | 12/21/2007 | 12/21/2007 | A | FAIL |
Troy Cobbley
|
|
|
Remove the thumb turn and repair the automatic flush bolts at the main exit and provide exit discharge lights at the front and rear exits.
|
FIRE-Conference | 10/4/2007 | 10/5/2007 | 10/5/2007 | A | DONE |
Troy Cobbley
|
|
|
The restroom are ok to cover.
|
BLD-Framing/Rough-in | 10/2/2007 | 10/3/2007 | 10/3/2007 | A | PART |
Tom Arcoraci
|
|
|
ivan Note: cover Phone #: ###-####
|
FIRE-Conference | 9/13/2007 | 9/14/2007 | 9/14/2007 | A | DONE |
Troy Cobbley
|
|
|
I discussed wall heights/sprinkler obstructions with the general contractor
|
FIRE-Conference | 9/11/2007 | 9/12/2007 | 9/12/2007 | A | FAIL |
Troy Cobbley
|
|
|
Drove to the job site but contractor was not there. I left a message on his phone.
|
FIRE-Conference | 9/4/2007 | 9/5/2007 | 9/5/2007 | A | DONE |
Troy Cobbley
|
|
|
I went over fire alarm and fire sprinkler requirements with Ivan.
|
Plan assigned to (R_H) | 7/12/2007 | | 8/29/2007 | | PASS |
|
|
|
8/29/2007 08:06:10 RMH - activity updated through activity BLDA022 from case BLD07-01704.
|
Routing - PLAN CHECK | 8/24/2007 | | 8/29/2007 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 8/29/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/29/2007 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/29/2007 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/29/2007 | | DONE |
|
|
|
|
Telephone call | | | 8/29/2007 | | DONE |
|
|
|
t/c w tom whitworth at ###-#### - permit ready and fees given - also need gc name and rce#
|
Issue PAID IN FULL permit | | | 8/29/2007 | | DONE |
|
|
|
|
Plan resubmittals received | | | 8/28/2007 | | |
|
|
|
received 2 copys of sheet A1-1 taken to Ron H.
|
Plan resubmittals received | | | 8/24/2007 | | DONE |
|
|
|
received 1 transmittal,and 2 copys of sheets A2-1,E1-1,P1-1 taken to Ron H
|
1st review completed | | | 8/24/2007 | | FAIL |
|
|
|
|
Routing - FIRE | 8/22/2007 | | 8/24/2007 | | PASS |
|
|
|
Attached IFC review comments to plans.
|
Routing - PLAN CHECK | 7/13/2007 | | 8/22/2007 | | FAIL |
|
|
|
|
Case Summary (BLD) | | | 8/22/2007 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 7/12/2007 | | 7/13/2007 | | PASS |
|
|
|
|
Routing PW Sewer Rating | 7/12/2007 | | 7/12/2007 | | PASS |
|
|
|
|
Pending Assignment by MYS | 6/29/2007 | | 7/12/2007 | | DONE |
|
|
|
7/12/2007 12:32:00 MYS - activity updated through activity BLDA175 from case BLD07-01704.
|
Plans ACCEPTED BY PLAN TECH | | | 6/29/2007 | | |
|
|
|
|
Application received | | | 6/28/2007 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 6/28/2007 | | DONE |
|
|
|
|