Permit NumberBLD07-01705
StatusFinaled
Name FIRST SERVICE GROUP
Site Address 1320 S MAPLE GROVE RD
Project NameFirst Service Group Bldg
Customer Number 
ePlanReviewNo
Description
(VENICE COFFEE & WINE BISTRO - FIRST SERVICE GROUP BLDG) This building is NOT fire sprinklered. To create a 1,568 square foot restaurant tenant space within a new 5,641 square foot building. Work is to include 2 restrooms accessible to the disabled, interior nonbearing walls, suspended gypsum board ceilings, suspended acoustical ceilings, a grease hood and duct, and interior finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. CJW
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD3/5/20083/5/20083/28/2008 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Second Notice BLD2/6/20082/6/20083/5/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 1/16/20082/6/2008 DONE
Override - People Holds  1/16/2008  
Permanent Occupancy UNPAID FEE  1/16/2008 DONE
BLD-Final12/27/200712/28/200712/28/2007APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 12/27/2007 at 3:11:42 PM. Contact: ###-####. ok for perm occ.
BLD-Final12/27/200712/27/200712/27/2007PCANC
DetailsMike Jordan
guy Phone #: ###-####. Called in wrong permit. Needs plumbing final.
FIRE-Final Inspection12/20/200712/21/200712/21/2007APASS
DetailsTroy Cobbley
fire life safety passed. KR
BLD-Other11/29/200711/30/200711/30/2007ANR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 11/29/2007 at 11:53:49 AM. Contact: ###-####. Needs other trades ri insp. first.
BLD-Wall cover11/5/200711/6/200711/6/2007APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 11/5/2007 at 11:52:32 AM. Contact: ###-####.
BLD-Wall cover11/2/200711/2/200711/2/2007APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 11/2/2007 at 7:10:09 AM. Contact: ###-####. demissing wall above ceiling ok. tis side only.
Inspection Record Card- Bld  11/2/2007 DONE
Print Occupancy Form  11/2/2007 DONE
BLD-Energy code compliance10/31/200710/31/200710/31/2007PPASS
DetailsMike Jordan
BLD-Wall cover10/31/200710/31/200710/31/2007PCANC
DetailsMike Jordan
Scheduled by a contractor via Hello! on 10/31/2007 at 9:32:56 AM.
BLD-Framing/Rough-in10/29/200710/29/200710/29/2007APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 10/29/2007 at 7:29:28 AM. Contact: ###-####.
Print Occupancy Form  9/24/2007 DONE
Issue PAID IN FULL permit  9/24/2007 DONE
Routing - PLAN CHECK8/31/2007 9/21/2007 PASS
This project was already approved on August 30, 2007 but issuance was delayed because of a Design Review Modification. In addition, another tenant space was on the same drawings as this tenant space. This permit was delayed until issues relating to the other tenant space were resolved.
PLANS/APPL TAKEN TO FRONT DESK  9/21/2007 DONE
Plan assigned to (CJW)7/16/2007 9/21/2007 PASS
9/21/2007 15:11:02 CJW - activity updated through activity BLDA022 from case BLD07-01705.
Routing - FIRE8/30/2007 8/31/2007 PASS
Attached IFC review comments to plans.
1st review completed  8/31/2007 PASS
Routing - PLAN CHECK7/25/2007 8/30/2007 PASS
The IBC plan review was started on August 28, 2007 and was finished on August 30, 2007. The drawings were approved with 'red lines'. See the plan review report.
Plan resubmittals received  7/30/2007  
received 1 letter, and 3 copys of sheets A-2.0,A-4.0,E-2.0L,E-2.0MP,E-2-0P,E-2.05,E-3.0,E-3.1,P1.0,P1.1,M0.1,M1.0 taken to Carl W.
Plan resubmittals received  7/25/2007  
Received two copies of pages G-1.0, A-1.0, A-2.0, A-3.0, A-4.0, EN0.0, M0.0, M0.1, M1.0, P0.0, P0.1, P1.0, P1.1, E-0.0, E-2.0L, E-2.0MP, E-2.0P, E-2.0S, E-3.0, E-3.1; taken to Carl Westfall
Routing - PLUMBING7/17/2007 7/25/2007 PASS
no time to review will review in the field
Routing - PUBLIC WORKS7/16/2007 7/17/2007 PASS
Routing PW Environmental7/17/2007 7/17/2007 PASS
No grease abatement required provided facility operation remains limited menu sandwhich shop. Future changes to menu and kitchen equipment will require suitable and adequate grease abatement. (8-28-07) The drawings were revised to show a grease trap. (Carl J. Westfall)
Routing PW Sewer Rating7/17/2007 7/17/2007 PASS
Pending Assignment by MYS6/29/2007 7/16/2007 DONE
7/16/2007 08:35:32 MYS - activity updated through activity BLDA172 from case BLD07-01705.
Application received  6/28/2007  
Plans ACCEPTED BY PLAN TECH  6/28/2007  
Recd Pcfee & Taken To Pln CK  6/28/2007 DONE