Permit Information
Permit NumberBLD07-01707
StatusFinaled
Name C BAR CONSTRUCTION
Site Address 519 W FRONT ST
Project NameFRONT 5 BUILDING
Customer Number 
ePlanReviewNo
Description
(OAAS LANEY - 2ND STORY EXPANSION - FRONT 5 BUILDING) This building is fire sprinklered for code trade-offs. To expand the 2nd story within an existing office tenant space by about 331 square feet. After the expansion, the 2nd story of this tenant space will have a total floor area of about 1,851 square feet (34 occupant load) and the 1st story of this tenant space will continue to have a floor area of about 2,665 square feet (43 occupant load). The volume of this tenant space will not change. Work is to include bearing walls, wood joists, wood sheathing, lightweight gypcrete floor topping, guards, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. CJW
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance  7/23/2008 DONE
DetailsBarbara Stitt
Per Dave Hannah no mechanical permit required///7-23-08 BAS
DOC - Permit Finaled  7/23/2008 DONE
DetailsBarbara Stitt
Per Dave Hannah no mechanical permit required///7-23-08 BAS
BLD-Final7/10/20087/11/20087/11/2008PPASS
DetailsDave Hannah
Steve Phone #: ###-#### ok for perm occ
FIRE-Final Inspection7/10/20087/11/20087/11/2008APASS
DetailsTroy Cobbley
fire life safety passed.
BLD-Framing/Rough-in10/10/200710/11/200710/11/2007PPASS
DetailsDave Hannah
lee Phone #: ###-####
Inspection Record Card- Bld  10/4/2007 DONE
Telephone call  10/4/2007 DONE
t/c w amber hunter at ###-#### - permit ready and fees given
Permit Ready to Issue  10/4/2007 DONE
Issue PAID IN FULL permit  10/4/2007  
Routing - PLAN CHECK9/4/2007 10/3/2007 PASS
(10-3-07 - AM) Worked on the resubmittal review. Called the Structural Engineer's representative. Asked for additional analysis for the lateral design. (10-3-07 - PM) Approved the drawings with 'red lines'.
Plan assigned to (CJW)7/16/2007 10/3/2007 PASS
10/3/2007 15:39:32 CJW - activity updated through activity BLDA022 from case BLD07-01707.
PLANS/APPL TAKEN TO FRONT DESK  10/3/2007 DONE
Plan resubmittals received  10/2/2007  
Received 1 cover transmittal, 3 copoies of sheets A2.0 & A3.0 and taken to Carl Westfall///10/2/07 BAS
Plan resubmittals received  9/25/2007  
Received transmittal letter and two copies of sturctural calculations; taken to Carl Westfall
1st review completed  9/4/2007 FAIL
Routing - FIRE8/31/2007 9/4/2007 PASS
Attached review comments to plans.
Routing - PLAN CHECK7/17/2007 8/31/2007 FAIL
The IBC plan review was started on August 30, 2007 and was finished the next day. Additional information was required. See the plan review report.
Routing - PUBLIC WORKS7/16/2007 7/17/2007 PASS
Routing PW Sewer Rating7/17/2007 7/17/2007 PASS
Pending Assignment by MYS7/3/2007 7/16/2007 DONE
7/16/2007 11:40:06 MYS - activity updated through activity BLDA172 from case BLD07-01707.
Plans ACCEPTED BY PLAN TECH  7/3/2007  
Recd Pcfee & Taken To Pln CK  7/3/2007  
Application received  6/28/2007