Permit Information
Permit NumberBLD07-01712
StatusFinaled
Name IDAHO IRISH DANCE
Site Address 1909 N WILDWOOD AVE
Project NameSTEELWOOD FLEX CONDOS
Customer Number 
ePlanReviewNo
Description
(IDAHO IRISH DANCE STUDIO - STEELWOOD FLEX CONDOS - BLDG #5 - UNIT 17) This building is NOT fire sprinklered. To create a 1,596 square foot tenant space to be used as a dance studio. Work is to include a tenant demising wall, 2 restrooms accessible to the disabled, a mechanical room above the restrooms, an elevated wood floor finish on rubber pads, and interior finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. CJW
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD2/6/20082/6/20082/25/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 1/15/20082/6/2008 DONE
BLD-Final1/14/20081/15/20081/15/2008APASS
DetailsJim Sly
shawna Phone #: ###-#### Note: Please call 1/2 hr prior to inspection ot get in
OK for Perm Occ. :)
Permanent Occupancy UNPAID FEE  1/15/2008 DONE
FIRE-Final Inspection12/5/200712/6/200712/6/2007APASS
DetailsTroy Cobbley
Fire life safety completed.KR
BLD-Conference11/30/200711/30/200711/30/2007PPASS
DetailsJim Sly
shawna Phone #: ###-####
FIRE-Final Inspection11/29/200711/30/200711/30/2007AFAIL
DetailsTroy Cobbley
Cannot final until shell is final.extinguisher is tagged and hanging.
BLD-Final11/29/200711/30/200711/30/2007ANR
DetailsJim Sly
shawna Phone #: ###-####
FIRE-Final Inspection11/29/200711/29/200711/29/2007PFAIL
DetailsTroy Cobbley
Need the shell permit finaled. Need the fire extinguisher tagged and mounted. Need a duct smoke detector or provide verification that the hvac unit moves less than 2,000 cfm.
BLD-Framing/Rough-in11/2/200711/5/200711/5/2007PPASS
DetailsJim Sly
shauna Phone #: ###-#### or ###-####
Issue PAID IN FULL permit  9/25/2007  
Telephone call  9/21/2007 DONE
t/c w elizabeth cooper at ###-#### - permit ready and fees given - also need gc name and rce#
Permit Ready to Issue  9/21/2007 DONE
Routing - PLAN CHECK9/7/2007 9/20/2007 PASS
Drawings approved after resubmittal review.
Plan resubmittals received  9/20/2007  
Received 1 cover transmittal, 1 copy of info regarding BiPower Pad, and 3 copies of sheet A1.0 and taken to Carl Westfall
PLANS/APPL TAKEN TO FRONT DESK  9/20/2007 DONE
Print Occupancy Form  9/20/2007 DONE
Plan assigned to (CJW)7/16/2007 9/20/2007 PASS
9/20/2007 14:02:57 CJW - activity updated through activity BLDA022 from case BLD07-01712.
Routing - FIRE9/5/2007 9/7/2007 PASS
Attached IFC review comments to plans.
Plan resubmittals received  9/7/2007 DONE
received 3 copys of sheet A1.0 inserted into plans and returned to fire///dld
1st review completed  9/7/2007 FAIL
Routing - PLAN CHECK7/19/2007 9/5/2007 FAIL
The IBC plan review was started on September 4, 2007 and was finished the next day. Revised drawings were required. See the plan review report.
Routing - PLANNING7/17/2007 7/19/2007 PASS
Sarah Schafer (verify parking x refer DRH07-00002) Approved per the DR.
Routing PW Sewer Rating7/17/2007 7/17/2007 PASS
Routing - PUBLIC WORKS7/16/2007 7/17/2007 PASS
Pending Assignment by MYS7/2/2007 7/16/2007 DONE
7/16/2007 12:14:32 MYS - activity updated through activity BLDA172 from case BLD07-01712.
Plans ACCEPTED BY PLAN TECH  7/2/2007  
Recd Pcfee & Taken To Pln CK  7/2/2007 DONE
Application received  6/29/2007