CHANGE STATUS TO (FNL) | | | 12/1/2008 | | DONE |
Jason Blais
|
|
|
Passed final inspection 5/6/08.
|
BLD-Final | 5/6/2008 | 5/6/2008 | 5/6/2008 | P | PASS |
Tony Young
|
|
|
curt Phone #: ###-####
|
BLD-Final | 5/5/2008 | 5/6/2008 | 5/6/2008 | A | PASS |
Tony Young
|
|
|
curt Phone #: ###-####
|
FIRE-Final Inspection | 5/5/2008 | 5/5/2008 | 5/5/2008 | P | PASS |
Forrest France
|
|
|
Acceptable per G. Slane
|
BLD-Final | 5/5/2008 | 5/5/2008 | 5/5/2008 | P | PART |
Tony Young
|
|
|
curt Phone #: ###-#### need FLS 1st
|
BLD-Conference | 4/22/2008 | 4/23/2008 | 4/23/2008 | A | PASS |
Tony Young
|
|
|
Curt; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt got ok from G.S. on exits as long as ADA signage is in place
|
BLD-Conference | 4/18/2008 | 4/21/2008 | 4/22/2008 | A | PART |
Tony Young
|
|
|
Curt; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt need to do more research for upgrade agreements,, need to see G. Slane, and J. Blais,, t/w Curt about this
|
Extend Permit 180 days | 4/21/2008 | 4/22/2008 | 4/22/2008 | A | CANC |
Tony Young
|
|
|
Curt; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
BLD-Conference | 4/17/2008 | 4/18/2008 | 4/21/2008 | A | PART |
Tony Young
|
|
|
Curt; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt doing research
|
FIRE-Final Inspection | 1/8/2008 | 1/9/2008 | 1/9/2008 | P | NR |
Forrest France
|
|
|
Project is not ready for final inspection, pending application of IFC 2003 sec. 1008.1.3.4.
|
FIRE-Final Inspection | 11/27/2007 | 11/28/2007 | 11/28/2007 | A | FAIL |
Forrest France
|
|
|
Missing exit sign above door. When building is locked down mag locks on main entrance south side will not release when aproached from egress side, sensor were not installed. Noted they need to follow steps from 2003 IFC chapter 10, 1008.1.3.4 all 6 steps. Noted on plans. Doors will release on fire alarm. as per KR
|
Code Occupancy Approval | 11/28/2007 | 11/28/2007 | 11/28/2007 | P | PASS |
Michael Garner
|
|
|
SITE INSPECTION COMPLETE - WORK COMPLETED ACCORDING TO APPROVED PERMITS/PLANS - PASS
|
BLD-Final | 11/26/2007 | 11/27/2007 | 11/27/2007 | P | PART |
Tony Young
|
|
|
CURT Phone #: ###-#### final ok pending trades , zoning and f/l/s
|
Override - Parcel Holds | 11/27/2007 | 1/1/1900 | 11/27/2007 | | |
|
|
|
entry way only
|
Override - Parcel Holds | 11/26/2007 | 1/1/1900 | 11/26/2007 | | |
|
|
|
OK
|
Plan resubmittals received | | | 9/7/2007 | | |
|
|
|
received 1 letter of transmittal, 2 copys of Red Head concrete anchoring and 2 sheets A-301 taken to Jason B. this permit was issued 8-31-07 ///dld
|
Plan Reviewer's activity | | | 9/7/2007 | | DONE |
|
|
|
CHANGE. Resubmittal sheet A-301 received changing the epoxy/adhesive bolts to Red Head Trubolt Wedge Type Anchors. (1/2" dia. x 4 1/8" depth) Noted on resubmittal sheet. Special Inspection is still required per the ICC Report ESR-2251 (attached to this case under "Documents" and the plan). A new sheet is to be made available to the Building Inspector on the site. A copy of this new sheet will be provided to Records for scanning.
|
Issue PAID IN FULL permit | | | 8/31/2007 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/17/2007 | | 8/30/2007 | | PASS |
|
|
|
Plans approved and taken to front desk to prep for issuance.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/30/2007 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 8/30/2007 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/30/2007 | | DONE |
|
|
|
|
Telephone call | | | 8/30/2007 | | DONE |
|
|
|
bud gover at ###-#### that permit is ready
|
Plan assigned to (JCB) | 7/9/2007 | | 8/30/2007 | | PASS |
|
|
|
8/30/2007 13:04:52 JCB - activity updated through activity BLDA022 from case BLD07-01778.
|
Plan resubmittals received | | | 8/29/2007 | | |
|
|
|
received letter of transmittal from zga arch & "2" sets of plans including G-OO1, A-1O1, A-1O2 & A-3O1--plans taken to Jason Blais
|
Plan resubmittals received | | | 8/23/2007 | | |
|
|
|
received 1 letter of transmittal,1 response,2 structural calcs,and 2 copys of sheets A-301,A-102,A-101,G-001 taken to Jason B.
|
1st review completed | | | 8/17/2007 | | FAIL |
|
|
|
Failed Building Plan Review.
|
Routing - PLAN CHECK | 7/10/2007 | | 8/17/2007 | | FAIL |
|
|
|
Plan Review report e-mailed to owner and architect. Plan resubmittals and written response required for further review.
Jason Blais ###-####.
|
Routing - FIRE | 8/17/2007 | | 8/17/2007 | | DONE |
|
|
|
No fire review needed per Scott Arellano. Field verify any Fire Code related items. Fire sprinkler not required in vestibule per Scott and Brian.
|
Telephone call | | | 8/13/2007 | | DONE |
|
|
|
Talked with Mike Simmonds and Bud Gover asking if there were any structural calculations included with the submittal. None provided. Mike and Bud will look into.
|
Routing - PLANNING | 7/9/2007 | | 7/10/2007 | | PASS |
|
|
|
Josh Wilson CZC07-00166
|
Pending Assignment by MYS | 7/6/2007 | | 7/9/2007 | | DONE |
|
|
|
7/9/2007 15:03:10 MYS - activity updated through activity BLDA184 from case BLD07-01778.
|
Plans ACCEPTED BY PLAN TECH | | | 7/9/2007 | | |
|
|
|
|
Application received | | | 7/6/2007 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/6/2007 | | DONE |
|
|
|
|