Case Summary (BLD) | | | 12/19/2008 | | |
|
|
|
|
Third Notice BLD | 3/5/2008 | 3/5/2008 | 3/25/2008 | | DONE |
Barbara Stitt
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 2/6/2008 | 2/6/2008 | 3/5/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 1/11/2008 | 2/6/2008 | | DONE |
|
|
|
|
Permanent Occupancy UNPAID FEE | | | 1/11/2008 | | DONE |
|
|
|
|
BLD-Final | 1/9/2008 | 1/10/2008 | 1/10/2008 | P | PASS |
Dave Hannah
|
|
|
jeff Phone #: ###-####ok forperm occ
|
FIRE-Final Inspection | 1/9/2008 | 1/10/2008 | 1/10/2008 | A | PASS |
Forrest France
|
|
|
Fire life safety passed.KR
|
BLD-Aging Inspection | 1/3/2008 | 1/3/2008 | 1/3/2008 | | PASS |
Dave Hannah
|
|
|
wip
|
Plan assigned to (CJW) | 12/3/2007 | 12/3/2007 | 12/12/2007 | | PASS |
|
|
|
12/12/2007 10:28:41 CJW - activity updated through activity BLDA022 from case BLD07-01841.
|
Routing - FRONT DESK | 12/3/2007 | | 12/12/2007 | | PASS |
|
|
|
Plan modification approved
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/12/2007 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/12/2007 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 12/12/2007 | | |
|
|
|
already issued-plan mod
|
(F) Reprint permit | | | 12/12/2007 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/12/2007 | | |
|
|
|
|
Telephone call | | | 12/3/2007 | | |
|
|
|
no plan mod fee required per Jenifer G. see comments
|
Plan Modification Accepted | | | 12/3/2007 | | |
|
|
|
plans excepted for bld07-01841 for the redesign of : replace plywood finish panels for duo-polycarbonate panels by 3-form. including "2" sheets of A2.1 & A4.1 routed to Carl Westfall.
|
Plan assigned to (CJW) | 7/20/2007 | | 9/27/2007 | | PASS |
|
|
|
9/27/2007 09:01:26 CJW - activity updated through activity BLDA022 from case BLD07-01841.
|
Routing - PLAN CHECK | 9/10/2007 | | 9/27/2007 | | PASS |
|
|
|
(9-24-07) Waiting for information about the safety glazing status of the polycarbonate panels. E-mailed the Architect and the manufacturer's rep. (9-27-07) The polycarbonate panels were removed from areas subject to human impact loads. Drawings approved.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/27/2007 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/27/2007 | | DONE |
|
|
|
|
Telephone call | | | 9/27/2007 | | DONE |
|
|
|
left vm for mark rossitier at ###-#### - permit ready and fees - also need gc name and rce#
|
Permit Ready to Issue | | | 9/27/2007 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/27/2007 | | DONE |
|
|
|
|
Plan resubmittals received | | | 9/26/2007 | | |
|
|
|
Received transmittal and two copies of pages A2.1, A4.1; taken to Carl Westfall
|
Plan resubmittals received | | | 9/18/2007 | | |
|
|
|
Received transmittal, copy of Boise City Plan Review Report, cut sheets for polycarbonate panels, two copies of pages A2.1, M4.1; taken to Carl Westfall
|
1st review completed | | | 9/10/2007 | | FAIL |
|
|
|
|
Routing - FIRE | 9/6/2007 | | 9/10/2007 | | PASS |
|
|
|
Attached IFC review comments to plans.
|
Routing - PLAN CHECK | 7/23/2007 | | 9/6/2007 | | FAIL |
|
|
|
The IBC plan review was started on September 5, 2007 and was finished the next day. Revised drawings were required. See the plan review report.
|
Routing - PUBLIC WORKS | 7/20/2007 | | 7/23/2007 | | PASS |
|
|
|
|
Routing PW Sewer Rating | 7/23/2007 | | 7/23/2007 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 7/20/2007 | | DONE |
|
|
|
INTERIOR DEMO PERMIT DENIED. No need for demo permit. This space is an empty space and has not been previously occupied. This space is in a shell building renovated under BLD05-03461.
|
Pending Assignment by MYS | 7/13/2007 | | 7/20/2007 | | DONE |
|
|
|
7/20/2007 14:37:49 MYS - activity updated through activity BLDA172 from case BLD07-01841.
|
Plans ACCEPTED BY PLAN TECH | | | 7/13/2007 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/13/2007 | | |
|
|
|
|
Application received | | | 7/13/2007 | | |
|
|
|
|