First Notice | | 11/2/2009 | 12/28/2009 | | DONE |
|
|
|
|
Permanent Occupancy | | | 10/23/2009 | | DONE |
|
|
|
|
BLD-Final | 10/14/2009 | 10/15/2009 | 10/15/2009 | A | PASS |
Tom Arcoraci
|
|
|
john Phone #: ###-####
|
BLD-Other | 10/9/2009 | 10/9/2009 | 10/9/2009 | P | PASS |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 10/9/2009 | 10/9/2009 | 10/9/2009 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
BLD-Aging Inspection | 10/9/2009 | 10/9/2009 | 10/9/2009 | | PASS |
Tom Arcoraci
|
|
|
|
PubWorks Occupancy Approval | 10/2/2009 | 10/2/2009 | 10/2/2009 | | DONE |
Tiffany Lowery
|
|
|
|
Temporary Occupancy | 7/10/2009 | 10/8/2009 | 7/10/2009 | | PASS |
Jenifer Gilliland
|
|
|
|
PubWorks Occupancy Approval | 7/1/2009 | 7/1/2009 | 7/1/2009 | | PASS |
Tisha Gallop
|
|
|
Per phone call from Dan Erskine ok for temporary occupancy for entire building, no card.
|
Temporary Occupancy | 5/4/2009 | 8/2/2009 | 5/4/2009 | | DONE |
Tisha Gallop
|
|
|
temp issued for entire Assisted Living Facility. Final occ pending approval by Fire Alarm, Fire Life/Safety, Plumbing, Structural.
|
BLD-Final | 4/28/2009 | 4/29/2009 | 4/29/2009 | A | PART |
Tom Arcoraci
|
|
|
John Phone #: ###-#### pending re sub
|
Zoning Approval | 4/29/2009 | 4/29/2009 | 4/29/2009 | | PASS |
Josh Wilson
|
|
|
|
FIRE-Final Inspection | 4/27/2009 | 4/28/2009 | 4/28/2009 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given for the remaining assisted living area. See the city approved resubmittals for the two exit signs that need to be provided and the two emergency lights that need added. Also the project related fire alarm permit needs finaled.
|
FIRE-Final Inspection | 4/27/2009 | 4/27/2009 | 4/27/2009 | P | CANC |
Forrest France
|
|
|
Overbooked
|
BLD-Framing/Rough-in | 2/24/2009 | 2/25/2009 | 2/25/2009 | A | PART |
Tom Arcoraci
|
|
|
John Phone #: ###-####
|
BLD-Aging Inspection | 2/17/2009 | 2/17/2009 | 2/17/2009 | | PASS |
Tom Arcoraci
|
|
|
|
Temporary Occupancy | 2/17/2009 | 5/18/2009 | 2/17/2009 | | DONE |
Jenifer Gilliland
|
|
|
Per email from Jenifer Gilliland see attached documents
|
Temporary Occupancy UNPAID FEE | | | 1/2/2009 | | DONE |
|
|
|
|
Zoning Approval Temp | 12/17/2008 | 12/17/2008 | 12/17/2008 | | PASS |
Josh Wilson
|
|
|
OK per Design Review DRH07-00197
|
BLD-Final | 12/15/2008 | 12/16/2008 | 12/16/2008 | P | PART |
Tom Arcoraci
|
|
|
john Phone #: ###-####
|
FIRE-Final Inspection | 12/15/2008 | 12/16/2008 | 12/16/2008 | A | PART |
Troy Cobbley
|
|
|
The dining area is ok to occupy.
|
FIRE-Final Inspection | 12/15/2008 | 12/15/2008 | 12/15/2008 | P | FAIL |
Troy Cobbley
|
|
|
The inspection today was just for the new Dining Area. The new emergency light in the short corridor was installed and tested but the exit discharge lights had not been installed yet. Inspection is going to be called back in for tomorrow morning. Temporary occupant load signs are going to be installed until management gets the official signs.
|
FIRE-Final Inspection | 12/11/2008 | 12/12/2008 | 12/12/2008 | P | FAIL |
Troy Cobbley
|
|
|
This inspection was for the new Dining Area and the Aid Station Corridor. Not all of the exit discharge lighting is in place yet and some of the emergency lights are not functioning. Also emergency lighting is required in the short corridor next to the private dining room. Provide occupant load signs as well.
|
BLD-Other | 11/19/2008 | 11/20/2008 | 11/20/2008 | A | PASS |
Tom Arcoraci
|
|
|
john Note: t-bar grid ceiling Phone #: ###-####
|
BLD-Other | 11/5/2008 | 11/5/2008 | 11/5/2008 | P | PASS |
Tom Arcoraci
|
|
|
wip ok grid and f/p
|
BLD-Other | 11/4/2008 | 11/5/2008 | 11/5/2008 | A | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/4/2008 at 3:04:10 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 9/30/2008 | 9/30/2008 | 9/30/2008 | P | PASS |
Mike Jordan
|
|
|
john Phone #: ###-####. Interior framed walls and 2nd layer of 5/8 typex for alf dining room ok.
|
Temporary Occupancy UNPAID FEE | | | 9/24/2008 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Framing/Rough-in | 6/25/2008 | 6/25/2008 | 6/25/2008 | P | PART |
Tom Arcoraci
|
|
|
john Phone #: ###-#### wip ok
|
BLD-Final | 6/23/2008 | 6/23/2008 | 6/23/2008 | P | PART |
Tom Arcoraci
|
|
|
John- temp Phone #: ###-#### ok for temp phase 1part 2 and 3
|
Temporary Occupancy UNPAID FEE | | | 6/23/2008 | | DONE |
Cathy Weisshaupt
|
|
|
|
FIRE-Final Inspection | 6/20/2008 | 6/20/2008 | 6/20/2008 | P | PART |
Troy Cobbley
|
|
|
The two room west addition and the ten room west addition is ok to occupy.
|
FIRE-Final Inspection | 6/18/2008 | 6/19/2008 | 6/19/2008 | A | FAIL |
Troy Cobbley
|
|
|
The inspection today was for the occupancy of the west two room addition and the west ten room addition. The exit discharge light was not installed at the ten room area. I am requiring a exit discharge light at the exit of the two room area per the review comments which reference chapter 10 of the IFC
|
FIRE-Conference | 6/10/2008 | 6/12/2008 | 6/12/2008 | A | DONE |
Troy Cobbley
|
|
|
I met the other inspectors and the general contractor and discussed project phasing.
|
CHANGE STATUS TO (ISS) | | | 6/11/2008 | | |
|
|
|
already issued- plan mod
|
(F) Reprint permit | | | 6/11/2008 | | |
|
|
|
|
OVERRIDE | | | 6/10/2008 | | |
|
|
|
|
Plan assigned to (DRS) | 5/6/2008 | 5/6/2008 | 6/10/2008 | | PASS |
Dan Stuart
|
|
|
6/10/2008 07:06:50 DRS - activity updated through activity BLDA022 from case BLD07-01845.
|
Override - Parcel Holds | | | 6/10/2008 | | |
|
|
|
|
Override - Parcel Holds | | | 6/10/2008 | | |
|
|
|
|
Override - Parcel Holds | | | 6/10/2008 | | |
|
|
|
|
Routing - PLAN CHECK | 5/27/2008 | | 6/10/2008 | | PASS |
Dan Stuart
|
|
|
Plan Modification #2 taken to permit desk to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/10/2008 | | PASS |
|
|
|
|
Print Occupancy Form | | | 6/10/2008 | | DONE |
|
|
|
|
Telephone call | | | 6/10/2008 | | DONE |
|
|
|
t/c w wyatt at ###-#### - permit ready and fees given
|
Override - Parcel Holds | | | 6/10/2008 | | |
|
|
|
|
Override - Parcel Holds | | | 6/10/2008 | | |
|
|
|
|
Override - Parcel Holds | | | 6/10/2008 | | |
|
|
|
|
Permit Ready to Issue | | | 6/10/2008 | | DONE |
|
|
|
|
Routing - FIRE | 5/21/2008 | | 5/27/2008 | | PASS |
Scott Arellano
|
|
|
Attached updated IFC comments to plans
|
Routing - PLUMBING | 5/16/2008 | | 5/21/2008 | | PASS |
Bill VanDegrift
|
|
|
no plumbing changes,
|
Plan resubmittals received | | | 5/16/2008 | | |
|
|
|
Received two copies of FP1.01; inserted by LEG and taken plans back to Josh Wilson
|
Routing - PLANNING | 5/15/2008 | | 5/16/2008 | | PASS |
Josh Wilson
|
|
|
Approved per CZC08-00078
|
Routing - PUBLIC WORKS | 5/7/2008 | | 5/15/2008 | | PASS |
Beverly Hall
|
|
|
|
Plan resubmittals received | | | 5/14/2008 | | |
|
|
|
received "2" sets of civil plans with each sheet of C3.O1, C3.O2, C4.O1, & C4.O2--plans taken to Brian Murphy
|
Routing PW Drainage | 5/7/2008 | | 5/14/2008 | | PASS |
Brian Murphy
|
|
|
|
Plan resubmittals received | | | 5/14/2008 | | |
|
|
|
Received transmittal, response letter, and three copies of Addendum #10, and sheets P2.01, FP1.01; inserted by LEG and taken plans back to Connie B. in Public Works
|
BLD-Framing/Rough-in | 5/13/2008 | 5/13/2008 | 5/13/2008 | P | PART |
Tom Arcoraci
|
|
|
ceiling grid - ###-#### - bryan grid in A/L ok shear ok at dinning A/L and aid station
|
Override - Parcel Holds | | | 5/13/2008 | | |
|
|
|
tom a. said it was okay to give the inspection for ceiling grid
|
Override - Parcel Holds | | | 5/13/2008 | | |
|
|
|
tom a. said it was okay to give the inspection for ceiling grid
|
Routing - PLAN CHECK | 5/5/2008 | | 5/7/2008 | | PEND |
Dan Stuart
|
|
|
Re-write permit to reflect Plan Modification #2 & routing order for re-review.
|
Plan Modification Accepted | | | 5/5/2008 | | |
|
|
|
Plan modification accepted for exterior modifications, interior modifications, electrical, mechanical, plumbing, and fire protection modifications, see attached scanned plan mod. application for further details. Submitted on pages C3.01, C3.02, C4.01, C4.02, A0.01, A0.02, A0.03, A0.04, A0.05, A0.07, A1.01, A1.02, A2.01, A3.01, A4.01, A6.01, A6.02, A7.01, A8.01, A8.02, E2.11, E3.11, E3.12, E5.11, M1.01, M1.02, P1.01, P2.01, P2.01, FP1.01; routed to Dan Stuart.
|
BLD-Framing/Rough-in | 3/26/2008 | 3/27/2008 | 3/27/2008 | P | NR |
Mike Jordan
|
|
|
john Phone #: ###-####
|
Override - Parcel Holds | 3/26/2008 | 1/1/1900 | 3/26/2008 | | |
|
|
|
not for this one
|
BLD-Framing/Rough-in | 2/11/2008 | 2/12/2008 | 2/12/2008 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 2/11/2008 at 2:17:02 PM. Contact: ###-####. ok for part cover in n/west and s/east wings
|
Print Occupancy Form | | | 2/6/2008 | | DONE |
|
|
|
|
Telephone call | | | 2/6/2008 | | |
|
|
|
fax the fees to Angie at Petra at 11:45 and she called back and will be to pay the fees today
|
Override - Parcel Holds | | | 2/6/2008 | | |
|
|
|
|
Override - Parcel Holds | | | 2/6/2008 | | |
|
|
|
|
Permit Ready to Issue | | | 2/6/2008 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/6/2008 | | DONE |
|
|
|
plan mod fees paid and permit returned to issue
|
(F) Reprint permit | | | 2/6/2008 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 12/31/2007 | 12/31/2007 | 2/5/2008 | | PASS |
Dan Stuart
|
|
|
2/5/2008 17:28:05 DRS - activity updated through activity BLDA022 from case BLD07-01845.
|
Routing - PLAN CHECK | 1/17/2008 | | 2/5/2008 | | PEND |
Dan Stuart
|
|
|
Inserted addendum #7 plan modifications of 12/28/07 into original plans. Inserted addendum #8 plan modification and response to failed reviews under addendum #7. Reviewed additionals engineering for addendum #7 received 1/8/08. Assembled most current plan sheet changes and routed back to planning.
|
Routing - PLANNING | 2/5/2008 | | 2/5/2008 | | PASS |
Josh Wilson
|
|
|
Resubmitted site plan matches building permit submittal JGW 2/5/08
|
Routing - PLUMBING | 2/5/2008 | | 2/5/2008 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Routing - PLAN CHECK | 2/5/2008 | | 2/5/2008 | | PASS |
Dan Stuart
|
|
|
Plan modifications to permit desk to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/5/2008 | | PASS |
|
|
|
|
FIRE-Conference | 2/4/2008 | 2/4/2008 | 2/4/2008 | P | DONE |
Troy Cobbley
|
|
|
The fire alarm wire has been removed. Per agreement the stop work order is being lifted by Troy Cobbley.
|
Override - Parcel Holds | | | 2/4/2008 | | |
|
|
|
|
Override - Parcel Holds | | | 2/4/2008 | | |
|
|
|
|
FIRE-Conference | 1/29/2008 | 1/29/2008 | 1/29/2008 | P | DONE |
Troy Cobbley
|
|
|
While performing a fire sprinkler inspection I noticed that the backboxes and wire for the fire alarm system had been installed. I posted a stop work order for the fire alarm system and also noted that no covering of walls or ceiling was to be performed. I notified the electrical forman, fire alarm vendor and the job site superintendant. The stop work order was issued due to the fire alarm plans not even being submitted yet per the fire alarm vendor, Sentry Security Systems.
|
Plan resubmittals received | | | 1/23/2008 | | |
|
|
|
Received 1 cover transmittal, 1 copy of 4 page letter from Sidney Crandall, 2 copies of 4 page letter called Addundum, 2 copies of the following sheets-A0.01, A0.01a, A0.01b, A0.02, A0.03, A0.04, A0.07, A1.01, A2.01, A3.01, A8.01, A8.02, FSE-1, FSE-2, FSE-3, E0.02, E1.01, E2.11, E2.12, E5.11, E5.12, E6.02, M1.01, P1.01, P1.02, P2.01, P2.02, FP1.01, FP1.02, C2.01, C4.01, C6.01, L0.01a, L0.01b and taken to Dan Stuart's desk 1-23-08 @ 11:20am BAS
|
Routing - PLUMBING | 1/15/2008 | | 1/17/2008 | | FAIL |
Bill VanDegrift
|
|
|
page P1.01 note- ice maker drain may require an air gap. provide installation and operating instructions and any listings for the Master Care Entree AV series bathing system.
|
Routing - PLAN CHECK | 1/14/2008 | | 1/15/2008 | | PEND |
Dan Stuart
|
|
|
Routing to plumbing for re-review.
|
Routing - FIRE | 1/9/2008 | | 1/14/2008 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Routing - PUBLIC WORKS | 1/9/2008 | | 1/9/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Drainage | 1/9/2008 | | 1/9/2008 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Sewer Rating | 1/9/2008 | | 1/9/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing - PLANNING | 1/4/2008 | | 1/8/2008 | | FAIL |
|
|
|
CUP - Failed CUP review based on site design changes. Site design is also under the purview of the DRH. Drawings routed to Josh Wilson, Design Review Planner, for further review and subsequent communications with applicant. (DCP 1/4/08)
DRH - Failed DR review based on sidte design changes. Called applicant 1/8/08 to discuss- left voicemail. Routed to Public Works.
|
Routing - PLAN CHECK | 12/31/2007 | | 1/4/2008 | | PEND |
Dan Stuart
|
|
|
PLANS MODIFICATION ROUTING BEGUN TO PLANNING, PLUMBING, PW, FIRE
|
Override - Parcel Holds | | | 1/4/2008 | | |
|
|
|
|
Plan Reviewer's activity | | | 1/4/2008 | | DONE |
|
|
|
Sent e-mail to sid Crandall requesting stamped & signed copies of structural engineering calcs and details for plan modification structural changes.
|
Plan Modification Accepted | | | 12/31/2007 | | |
|
|
|
Plan modification accepted for exterior modification, interior modifications, structural modifications, electrical, mechanical, and plumbing modifications. For further details see attaches scanned document; submitted on pages A0.01, A0.02, A0.03, A0.04, A0.05, A0.07, A1.01, A1.02, A2.01, A3.01, A4.01, A4.02, A5.01, A5.02, A6.02, A7.01, A8.01, A8.02, S2.0, S2.2, S3.0, S3.1, S4.0, S4.1, E0.02, E2.11, E2.12, E3.11, E3.12, E4.11, E5.11, E6.02, M1.01, M2.01, P1.01, P2.01, P3.01, FP1.01; routed to Dan Stuart
|
BLD-Wall cover | 12/18/2007 | 12/19/2007 | 12/19/2007 | P | PART |
Mike Jordan
|
|
|
1st. layer of shaft liner at 2hr. wall, west half.
|
BLD-Wall cover | 12/17/2007 | 12/18/2007 | 12/18/2007 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 12/14/2007 | 12/17/2007 | 12/17/2007 | P | PASS |
Tom Arcoraci
|
|
|
wip
|
BLD-Framing/Rough-in | 12/14/2007 | 12/14/2007 | 12/14/2007 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/14/2007 at 10:57:30 AM. Contact: ###-####.
|
BLD-Footing | 11/14/2007 | 11/15/2007 | 11/15/2007 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/14/2007 at 5:06:01 PM. Contact: ###-####.
|
Telephone call | | | 11/2/2007 | | DONE |
|
|
|
called angie to let her know that the permit and fees are ready to be picked up and fax the price value to her also 3:00 pm
|
Permit Ready to Issue | | | 11/2/2007 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/2/2007 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 10/30/2007 | 10/30/2007 | 10/31/2007 | | PASS |
|
|
|
10/31/2007 08:06:14 DRS - activity updated through activity BLDA022 from case BLD07-01845.
|
Routing - PLAN CHECK | 10/30/2007 | | 10/31/2007 | | PASS |
|
|
|
Resubmittals inserted into plans. Plans to permit desk to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/31/2007 | | PASS |
|
|
|
|
CHANGE STATUS TO (REV) | | | 10/30/2007 | | |
|
|
|
|
Plan resubmittals received | | | 10/30/2007 | | |
|
|
|
received letter of transmittal from valley view retirement, one letter from don kirkman arch, attn to mike phillips. also from don kirkman arch attn to Dan Stuart (2) pages. also "4" pages from don kirkman arch addendum #6--also "2" sets of plans with each sheet of AO.O2, AO.O4, AO.O7, A1.O1, A1.O2, A3.O1, A6.O1, A7.O1, A8.O1, M1.O1, EO.O2, & E2.11--plans taken to Dan Stuart
|
Plan assigned to (DRS) | 10/5/2007 | | 10/22/2007 | | PASS |
|
|
|
10/22/2007 07:44:40 DRS - activity updated through activity BLDA022 from case BLD07-01845.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/22/2007 | | PASS |
|
|
|
|
Print Occupancy Form | | | 10/22/2007 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/5/2007 | | 10/19/2007 | | PASS |
|
|
|
Approved as noted on and attached plan review clarifications. To permit desk to issue permit.
|
Plan assigned to (M_P) | 7/16/2007 | 7/16/2007 | 10/5/2007 | | DONE |
|
|
|
Plans have been assigned to Dan Stuart.
|
Routing - PLAN CHECK | 9/25/2007 | | 10/5/2007 | | |
|
|
|
Plans assigned to Dan Stuart.
|
Plan resubmittals received | | | 10/3/2007 | | |
|
|
|
Received 2 copies of cover transmittal, 2 copies of the following sheets-A.01, A0.01a, A0.01b, A0.02, A0.03, A0.04, A0.05, A0.07, A1.01, A1.02, A2.01, A3.01, A5.01, A5.02, A6.01, A6.02, A7.01, A8.01, A8.02, S1.0, S1.1, S2.0, S2.1, S2.2, S3.0, S3.1, S4.0, S4.1, E0.02, E2.11, E2.12, E3.11, E5.11, E5.12, E6.02, M1.01, P1.01, P2.01, P3.01, P3.02, P3.03, FP1.01.--1 copy of Addendum #5 (4pgs), 1 copy of plan review process letter (27 pgs), 2 copies of specification 15910-ductwork accessories, 2 copies of structural calcs, 2 copies of project start up for special inspections, 1 copy of accessibility letter and taken to Mike Phillips///10/3/07 @ 10:00am BAS
|
Plan resubmittals received | | | 9/25/2007 | | DONE |
|
|
|
Recieved fire flow documentation and information on the final location of the relocated fire hydrant. Documentation recieved by fax from Beth Fedler of LOCHSA Engineering.
|
Routing - FIRE | 9/25/2007 | | 9/25/2007 | | PASS |
|
|
|
Attached updated review comments to plans.
|
1st review completed | | | 9/24/2007 | | FAIL |
|
|
|
|
Routing - FIRE | 9/19/2007 | | 9/24/2007 | | FAIL |
|
|
|
Faxed and Emailed resubmittal requirements to architect.
|
Routing - PLAN CHECK | 9/17/2007 | | 9/19/2007 | | FAIL |
|
|
|
New review required because of letter from Life Care Centers of America reflectign occupants are not capable of responding to an emergency without assistance from staff.
Sent correction report to the architect, additional informtionis required to be submitted for further review prior to issuing permit.
|
Routing - PLAN CHECK | 8/21/2007 | | 9/17/2007 | | |
|
|
|
Completed my review and then received an e-mail today from Life Care Centers of America reflecting residents are not capable of responding to an emergency without staff assistance. I will need to re-review as an I-2 occupancy.
|
Plan Reviewer's activity | | | 9/17/2007 | | |
|
|
|
Received letter from Life Care Centers of America, reflecting the level of care the residents are receiving in the assisted living facility. Not all occupancts are capable of responding to an emergency without the assistance of staff. Plan review must be reformatted to an I-2 occupancy instaed of an I-1.
|
Plan resubmittals received | | | 9/13/2007 | | DONE |
|
|
|
Received 1 letter of transmittal, 3 copys of addendum # 2 and # 4 ,6 copys of sheet A0.01 , & 3 copys of sheets A0.10,0.11,0.07 taken to Mike P .
|
Routing - FIRE | 8/17/2007 | | 8/21/2007 | | PASS |
Scott Arellano
|
|
|
Being reviewed for grading and drainage at this time.
|
Routing - PLAN CHECK | | | 8/17/2007 | | |
|
|
|
Mike Phillips Routing to fire for review of grading and drainage being issued under BLD 07-02235.
|
Routing - PLANNING | 8/1/2007 | | 8/8/2007 | | PASS |
|
|
|
Pass DR JGW
Pass CU DCP - redlined A0.01a
CUP07-000667 & CUP07-00052-Diane Perkins
DRH07-00166 & DRH07-00167-Andrea Tunning
CUP06-00098-Angela Wood
DRH06-00442-Greg Johnson
DRH07-00197-Josh Wilson
|
Routing - PLUMBING | 7/23/2007 | | 8/1/2007 | | PASS |
|
|
|
additional cross connection protection may be required.
|
Routing - Erosion and Sediment | 7/20/2007 | | 7/23/2007 | | PASS |
|
|
|
Refer to ESC07-00872 as master ESC plan.
|
Routing - PUBLIC WORKS | 7/17/2007 | | 7/20/2007 | | PASS |
|
|
|
|
Routing PW Sewer Rating | 7/19/2007 | | 7/19/2007 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 7/16/2007 | | 7/17/2007 | | PASS |
|
|
|
|
Pending Assignment by MYS | 7/13/2007 | | 7/16/2007 | | DONE |
|
|
|
7/16/2007 15:01:46 B_S - activity updated through activity BLDA170 from case BLD07-01845.
|
Plans ACCEPTED BY PLAN TECH | | | 7/16/2007 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 7/16/2007 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/13/2007 | | DONE |
|
|
|
|
Application received | | | 7/13/2007 | | |
|
|
|
|