Second Notice | | 12/4/2009 | 12/29/2009 | | DONE |
|
|
|
|
First Notice | | 11/24/2009 | 11/25/2009 | | DONE |
Barbara Stitt
|
|
|
|
Permanent Occupancy | | | 10/23/2009 | | DONE |
|
|
|
|
BLD-Final | 10/20/2009 | 10/21/2009 | 10/21/2009 | P | PASS |
Tom Arcoraci
|
|
|
John Phone #: ###-####
|
FIRE-Final Inspection | 10/8/2009 | 10/9/2009 | 10/9/2009 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
FIRE-Final Inspection | 10/6/2009 | 10/7/2009 | 10/7/2009 | A | FAIL |
Troy Cobbley
|
|
|
Life safety will be ok to pass when the project related fire alarm and fire sprinkler permits are passed.
|
Zoning Approval | 10/5/2009 | 10/5/2009 | 10/5/2009 | | DONE |
Josh Wilson
|
|
|
|
PubWorks Occupancy Approval | 10/2/2009 | 10/2/2009 | 10/2/2009 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Final | 9/11/2009 | 9/14/2009 | 9/14/2009 | A | PART |
Tom Arcoraci
|
|
|
john Phone #: ###-####
|
BLD-Final | 9/10/2009 | 9/11/2009 | 9/11/2009 | P | DEFR |
Jim Storey
|
|
|
john Phone #: ###-#### out of time.
|
FIRE-Final Inspection | 9/10/2009 | 9/11/2009 | 9/11/2009 | A | PART |
Troy Cobbley
|
|
|
The life safety is passed in the first floor shower room and isolation room.
|
FIRE-Sprinkler Rough-in | 9/10/2009 | 9/10/2009 | 9/10/2009 | P | FAIL |
Troy Cobbley
|
|
|
The project related fire alarm permit needs addressed prior to life safety. I did have the emergency light in the shower room tested while I was waiting for the fire alarm contractor. Will need to be rescheduled.
|
BLD-Other | 9/4/2009 | 9/4/2009 | 9/4/2009 | P | PASS |
Jim Sly
|
|
|
John- fire wall Phone #: ###-#### Existing holes in existing CMU wall filled in with dry pack mortar.......Room 325
|
BLD-Framing/Rough-in | 8/27/2009 | 8/28/2009 | 8/28/2009 | A | PART |
Jim Sly
|
|
|
john Phone #: ###-#### Grid...Day room and Isolation Rm ...OK. Frame....S-2 Storage and S-41 Toilet Rm....OK
|
BLD-Framing/Rough-in | 8/20/2009 | 8/21/2009 | 8/21/2009 | A | PASS |
Mike Jordan
|
|
|
Ben Phone #: ###-####. 1st and 2nd. floor patient room seperation walls ok.
|
BLD-Framing/Rough-in | 8/20/2009 | 8/20/2009 | 8/20/2009 | P | NR |
Tony Young
|
|
|
Ben Phone #: ###-#### need elec 1st
|
BLD-Framing/Rough-in | 8/13/2009 | 8/14/2009 | 8/14/2009 | A | PASS |
Jim Storey
|
|
|
ben Phone #: ###-#### 1 st floor 2 hr wall ok to cover rm and fur out.
|
BLD-Framing/Rough-in | 7/30/2009 | 7/30/2009 | 7/30/2009 | P | FAIL |
Jim Storey
|
|
|
Ben Phone #: ###-#### maintane 2hr wall assembly.
|
CHANGE STATUS TO (ISS) | | | 7/30/2009 | | DONE |
|
|
|
|
(F) Reprint permit | | | 7/30/2009 | | DONE |
|
|
|
|
OVERRIDE | | | 7/29/2009 | | |
|
|
|
|
Telephone call | | | 7/29/2009 | | DONE |
|
|
|
left vm for angela at ###-#### - permit (plan mod #3) ready and fees given
|
Override - Parcel Holds | | | 7/29/2009 | | |
|
|
|
|
Permit Ready to Issue | | | 7/29/2009 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 7/20/2009 | 7/20/2009 | 7/28/2009 | | PASS |
Dan Stuart
|
|
|
7/28/2009 17:42:26 DRS - activity updated through activity BLDA022 from case BLD07-01846.
|
Routing - PLAN CHECK | 7/21/2009 | | 7/28/2009 | | PASS |
Dan Stuart
|
|
|
Plan Mod 3 - Interior room use changes, fixture layout changes, delete some original rooms; leave some rooms without any modifications (pre-2007); modify ductwork, plumbing & electrical. Plan Modification Plans to permit desk to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/28/2009 | | PASS |
|
|
|
|
Override - Parcel Holds | | | 7/28/2009 | | |
|
|
|
|
Plan Modification Accepted | | | 7/20/2009 | | |
Dan Stuart
|
|
|
Plan mod rec'd for- Revised the bathing rooms, modified the size of the mechanical closets. Change patient room 101 into a semi-private room and 103 into private room. Revised the entried into the dining rooms, made activity room larger, created storage rooms in bathing areas. Kept existing central supply and janitors closets. Eliminated shafts for fresh air and octained thru wall. Rec'd A0.01; A0.01a; A0.01b; A0.02; A0.03; A0.04; A0.05; A0.06; A0.07; A0.08; A0.10; A0.11; A1.01; A1.02; A1.11; A3.01; A6.01; A6.02; A6.03; A7.01; A8.01; A8.02; A8.11; P1.01; P1.11; P2.01; P2.11; M1.01; M1.02; M1.11; E2.11; E2.21; E3.21- Taken to Dan S
|
Temporary Occupancy UNPAID FEE | | | 7/2/2009 | | DONE |
|
|
|
|
Temporary Occupancy UNPAID FEE | | | 7/2/2009 | | DONE |
|
|
|
|
BLD-Final | 6/30/2009 | 7/1/2009 | 7/1/2009 | P | PART |
Tom Arcoraci
|
|
|
Ben Phone #: ###-####
|
FIRE-Final Inspection | 6/30/2009 | 7/1/2009 | 7/1/2009 | P | PART |
Troy Cobbley
|
|
|
Emergency lighting has been provided in the second floor, skilled nursing shower. Life safety in this area is passed.
|
PubWorks Occupancy Approval | 7/1/2009 | 7/1/2009 | 7/1/2009 | | PASS |
Tisha Gallop
|
|
|
Per phone call from Dan Erskine ok for temporary occupancy for entire building, no card to sign off on.
|
FIRE-Final Inspection | 6/30/2009 | 6/30/2009 | 6/30/2009 | P | PART |
Troy Cobbley
|
|
|
Life safety is complete in the Area B of Skilled Nursing. Emergency lighting is required in the new shower rooms on the second floor of skilled nursing prior to occupnancy of the shower room.
|
BLD-Framing/Rough-in | 6/29/2009 | 6/29/2009 | 6/29/2009 | P | PEND |
Tom Arcoraci
|
|
|
Ben-ceiling grid inspection please Phone #: ###-####
|
FIRE-Final Inspection | 6/29/2009 | 6/29/2009 | 6/29/2009 | P | FAIL |
Troy Cobbley
|
|
|
Inspection was for Area B skilled nursing (1st and 2nd floors). The project related fire alarm permit for this area needs to be completed which includes the installation of the door release at the nurse's station. Provide white background for signage on doors. Provide emergency lighting above signed delayed egress doors. Per Dan Stuart, resubmittals are required showing delayed egress locks being installed in this area.
|
Temporary Occupancy UNPAID FEE | | | 6/23/2009 | | PASS |
Jenifer Gilliland
|
|
|
|
BLD-Framing/Rough-in | 6/19/2009 | 6/19/2009 | 6/19/2009 | P | PASS |
Tom Arcoraci
|
|
|
ben - ceiling grid Phone #: ###-####
|
BLD-Final | 6/5/2009 | 6/5/2009 | 6/5/2009 | P | PART |
Tom Arcoraci
|
|
|
ben Phone #: ###-####
|
FIRE-Final Inspection | 6/4/2009 | 6/5/2009 | 6/5/2009 | A | PART |
Troy Cobbley
|
|
|
The life safety passed on first floor skilled nursing/entry way and associated rooms and the second floor activities area directly above it.
|
Override - Parcel Holds | 6/5/2009 | 1/1/1900 | 6/5/2009 | | |
|
|
|
area not being modified
|
Override - Parcel Holds | | | 6/5/2009 | | |
|
|
|
|
Temporary Occupancy UNPAID FEE | | | 6/5/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Override - Parcel Holds | | | 6/5/2009 | | |
|
|
|
|
Temporary Occupancy UNPAID FEE | | | 6/5/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
|
Override - Parcel Holds | 6/4/2009 | 1/1/1900 | 6/4/2009 | | |
|
|
|
fire life safety
|
FIRE-Final Inspection | 6/2/2009 | 6/3/2009 | 6/3/2009 | A | FAIL |
Troy Cobbley
|
|
|
This inspection was for two new entry areas Emergency lighting is required in the exit way. Atleast one fire extinguisher is required as discussed. An exit sign leading to the exit way is missing. The project related fire alarm for this area had issues as well See the city approved fire alarm plans for deficiancies. They include smoke detector and a door holder that are not shown on the plans. A door holder that is shown on the plans but has not been installed. A remote annunciator that has not been installed. A smoke detector that does not set off the general alarm. A room missing a strobe. A wall mount a/v has been revised to a ceiling mount and was the wrong candella. All of these items are in a very small area.
|
FIRE-Final Inspection | 6/1/2009 | 6/2/2009 | 6/2/2009 | A | CANC |
Troy Cobbley
|
|
|
ben Phone #: ###-####
|
Override - Parcel Holds | 6/2/2009 | 1/1/1900 | 6/2/2009 | | |
|
|
|
fire life safety
|
Zoning Approval Temp | 5/28/2009 | 5/28/2009 | 5/28/2009 | | PASS |
Josh Wilson
|
|
|
|
BLD-Framing/Rough-in | 5/13/2009 | 5/14/2009 | 5/14/2009 | A | PASS |
Tom Arcoraci
|
|
|
Ben Phone #: ###-####
|
BLD-Framing/Rough-in | 4/14/2009 | 4/15/2009 | 4/15/2009 | A | PASS |
Tom Arcoraci
|
|
|
Ben Phone #: ###-####
|
BLD-Other | 3/13/2009 | 3/16/2009 | 3/16/2009 | A | PASS |
Tom Arcoraci
|
|
|
ceiling grid inspection//ben ###-####
|
BLD-Other | 3/6/2009 | 3/9/2009 | 3/9/2009 | A | PASS |
Tom Arcoraci
|
|
|
John- ceiling grid Phone #: ###-####
|
BLD-Wall cover | 3/3/2009 | 3/3/2009 | 3/3/2009 | P | PART |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 3/2/2009 | 3/3/2009 | 3/3/2009 | A | PASS |
Tom Arcoraci
|
|
|
ben Phone #: ###-#### wip ok
|
Temporary Occupancy | 2/26/2009 | 5/27/2009 | 2/26/2009 | | DONE |
Darla L Downs
|
|
|
|
BLD-Final | 2/25/2009 | 2/25/2009 | 2/25/2009 | P | PART |
Tom Arcoraci
|
|
|
Ben- temp Phone #: ###-####
|
FIRE-Final Inspection | 2/24/2009 | 2/25/2009 | 2/25/2009 | A | PART |
Troy Cobbley
|
|
|
The first and second floor dining areas are ok to occupy. The second floor nurses station is ok to occupy.
|
FIRE-Final Inspection | 2/23/2009 | 2/24/2009 | 2/24/2009 | P | FAIL |
Troy Cobbley
|
|
|
The project related fire alarm permit needs addressed. There are missing emergency lights in the second floor dining area and one addition light is needed see plan for location. The exit sign infront of the second floor stair access did not operate.
|
BLD-Other | 2/11/2009 | 2/11/2009 | 2/11/2009 | P | PART |
Tom Arcoraci
|
|
|
John Phone #: ###-#### wip ok
|
BLD-Other | 1/27/2009 | 1/28/2009 | 1/28/2009 | A | PASS |
Tom Arcoraci
|
|
|
Brian-Inspection for steel beams & fire proofing please Phone #: ###-#### wip ok
|
BLD-Framing/Rough-in | 12/30/2008 | 12/30/2008 | 12/30/2008 | P | PASS |
Tom Arcoraci
|
|
|
John Phone #: ###-#### wip 2nd floor ok
|
BLD-Other | 12/2/2008 | 12/3/2008 | 12/3/2008 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/2/2008 at 4:23:53 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 11/20/2008 | 11/20/2008 | 11/20/2008 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 11/19/2008 | 11/20/2008 | 11/20/2008 | A | PASS |
Tom Arcoraci
|
|
|
john Phone #: ###-####
|
BLD-Other | 10/7/2008 | 10/7/2008 | 10/7/2008 | P | PASS |
Jim Storey
|
|
|
temp stair encloser ok for use.
|
BLD-Other | 9/30/2008 | 9/30/2008 | 9/30/2008 | P | FAIL |
Mike Jordan
|
|
|
john - temp egress Phone #: ###-####. Still lacking onr rated door to complete exit corridor. Can not continue until door is in place.
|
BLD-Framing/Rough-in | 9/16/2008 | 9/16/2008 | 9/16/2008 | P | PART |
Mike Jordan
|
|
|
Framing for new parapet. wip.
|
BLD-Energy code compliance | 9/10/2008 | 9/16/2008 | 9/16/2008 | P | CANC |
Mike Jordan
|
|
|
|
Plan resubmittals received | | | 9/11/2008 | | DONE |
Dan Stuart
|
|
|
Received 1 letter of transmittal from Wyatt Leonard, 3 copies of the following sheets- A0.10 & A0.11 and taken to Dan Stuart
|
BLD-Framing/Rough-in | 9/5/2008 | 9/10/2008 | 9/10/2008 | P | PART |
Mike Jordan
|
|
|
Framing for new parapet.
|
BLD-Framing/Rough-in | 9/3/2008 | 9/5/2008 | 9/5/2008 | P | PART |
Mike Jordan
|
|
|
Framing for new parapet.
|
BLD-Framing/Rough-in | 8/27/2008 | 9/3/2008 | 9/3/2008 | P | PART |
Mike Jordan
|
|
|
Framing for paprpet wall.
|
BLD-Framing/Rough-in | 8/27/2008 | 8/27/2008 | 8/27/2008 | P | PART |
Mike Jordan
|
|
|
John Phone #: ###-####. Trusses for new parapet on existing roof.
|
BLD-Framing/Rough-in | 8/1/2008 | 8/1/2008 | 8/1/2008 | P | PASS |
Tom Arcoraci
|
|
|
John Phone #: ###-####
|
BLD-Aging Inspection | 7/18/2008 | 7/18/2008 | 7/18/2008 | | PASS |
Tom Arcoraci
|
|
|
wip
|
CHANGE STATUS TO (ISS) | | | 6/13/2008 | | DONE |
|
|
|
|
(F) Reprint permit | | | 6/13/2008 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 5/15/2008 | 5/15/2008 | 6/9/2008 | | PASS |
Dan Stuart
|
|
|
6/9/2008 06:57:32 DRS - activity updated through activity BLDA022 from case BLD07-01846.
|
Routing - PLAN CHECK | 5/27/2008 | | 6/9/2008 | | PASS |
Dan Stuart
|
|
|
Routing to permit desk to issue Plan Modification Permit.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/9/2008 | | PASS |
|
|
|
To permit desk to issue Plan Mod 2 permit.
|
Print Occupancy Form | | | 6/9/2008 | | DONE |
|
|
|
|
Telephone call | | | 6/9/2008 | | DONE |
|
|
|
left vm for sid crandall at ###-#### - permit ready and fees given
|
Override - Parcel Holds | | | 6/9/2008 | | |
|
|
|
|
Override - Parcel Holds | | | 6/9/2008 | | |
|
|
|
|
Override - Parcel Holds | | | 6/9/2008 | | |
|
|
|
|
Permit Ready to Issue | | | 6/9/2008 | | DONE |
|
|
|
|
Routing - FIRE | 5/23/2008 | | 5/27/2008 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Routing - PLAN CHECK | 5/14/2008 | | 5/23/2008 | | PEND |
Dan Stuart
|
|
|
Routing to fire code analyst. Reviewed limitations of openings into stair enclosure with Sid Crandall on phone will issue addendum removing window Q3 from wall between stair enclosure S-331 & conference room S-332.
|
Override - Parcel Holds | | | 5/22/2008 | | |
|
|
|
|
Override - Parcel Holds | | | 5/22/2008 | | |
|
|
|
|
Override - Parcel Holds | | | 5/22/2008 | | |
|
|
|
|
Plan Modification Accepted | | | 5/14/2008 | | |
|
|
|
Plan modification accepted for Bld07-01846 for Valley View Skilled Nursing Facility to make interior architectural and fire protection changes (see scanned application for more details); submitted on Addendum # 7, and sheets A0.01, A1.01, A1.02, A1.11, A3.01, A5.03, A5.04, A6.03, A7.01, FP1.01; routed to Dan Stuart
|
Telephone call | | | 4/29/2008 | | DONE |
|
|
|
Phone call from Sid Crandal - provided a shaft wall detail U.L. U469 for 1-hour shaft enclosure of existing ductwok penetrating the rated floor assembly at SNF. A smoke/fire damper is being installed at the 1-hour floor at the bottom of the shaft. Copy of the detail and architects data forwarded to Tom Arcoraci.
|
BLD-Aging Inspection | 2/28/2008 | 2/28/2008 | 2/28/2008 | | PASS |
Tom Arcoraci
|
|
|
wip ok
|
Issue PAID IN FULL permit | | | 2/15/2008 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/14/2008 | | DONE |
|
|
|
|
Telephone call | | | 2/14/2008 | | DONE |
|
|
|
left vm for linda cross at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 2/14/2008 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 1/17/2008 | 1/17/2008 | 2/13/2008 | | PASS |
Dan Stuart
|
|
|
2/13/2008 16:16:12 DRS - activity updated through activity BLDA022 from case BLD07-01846.
|
Routing - PLAN CHECK | 2/9/2008 | | 2/13/2008 | | PASS |
Dan Stuart
|
|
|
To permit desk to reissue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/13/2008 | | PASS |
|
|
|
Plan mod review completed.
|
Routing - FIRE | 2/5/2008 | | 2/9/2008 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Routing - PLUMBING | 2/1/2008 | | 2/5/2008 | | PASS |
Bill VanDegrift
|
|
|
per plans and 2003 upc
|
Routing - PUBLIC WORKS | 1/31/2008 | | 2/5/2008 | | PASS |
Beverly Hall
|
|
|
|
Routing PW Solid Waste | 2/1/2008 | | 2/1/2008 | | PASS |
Peter J. McCullough
|
|
|
|
Routing PW Sewer Rating | 2/1/2008 | | 2/1/2008 | | PASS |
Louise Waldorf
|
|
|
|
Routing PW Drainage | 2/1/2008 | | 2/1/2008 | | PASS |
Brian Murphy
|
|
|
|
Routing PW Environmental | 2/1/2008 | | 2/1/2008 | | PASS |
Walt Baumgartner
|
|
|
West Boise sewer district jurisdiction, existing grease abatement,
|
Routing - PLANNING | 1/22/2008 | | 1/31/2008 | | PASS |
Jon Williams
|
|
|
DRH07-00197 - Josh Wilson
|
Routing - PLAN CHECK | 1/22/2008 | | 1/22/2008 | | PEND |
Dan Stuart
|
|
|
ROUTED TO PLANNING TO REVIEW EXTERIOR PLAN MODIFICATIONS & SITE PLAN.
|
Plan Modification Accepted | | | 1/17/2008 | | |
|
|
|
Plan modification accepted for modifications to exterior, interior, structural, plumbing, mechanical, and electrical; see attached scanned document for further details. Submitted on pages A0.01, A0.01a, A0.01b, A0.02, A0.03, A0.04, A0.05, A0.06, A0.07, A0.08, A0.09, A0.10, A1.01, A1.02, A1.11, A3,01, A5.02, A5.04, A6.01, A6.02, A6.03, A7.01, A8.02, A8.11, FSE-1, FSE-2, FSE-3, FSE-4, FSE-1a, FSE-2a, FSE-3a, FSE-4a, S2.0, S2.2, S3.0, S3.1, S5.1, S6.0, P1.01, P1.02, P2.01, P2.02, FP1.02, M1.02, E2.11, E2.12, E3.11, E3.12, E3.21, E5.11, E5.12, E6.02; routed to Dan Stuart.
|
Issue PAID IN FULL permit | | | 11/29/2007 | | DONE |
|
|
|
|
CHANGE ISSUED DATE | | | 11/29/2007 | | |
|
|
|
|
Print Occupancy Form | | | 11/28/2007 | | DONE |
|
|
|
|
Telephone call | | | 11/28/2007 | | DONE |
|
|
|
lft vm with drew brown ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 11/28/2007 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 10/5/2007 | 10/5/2007 | 11/21/2007 | | PASS |
|
|
|
11/21/2007 16:20:41 DRS - activity updated through activity BLDA022 from case BLD07-01846.
|
Routing - PLAN CHECK | 11/6/2007 | | 11/21/2007 | | PASS |
|
|
|
Plans approved to include redlined notes thereon and all attched plan review comments of all reviewing agencies. Routing to permit desk to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/21/2007 | | PASS |
|
|
|
PLANS AND SPECS TO PERMIT DESK TO ISSUE
|
Plan resubmittals received | | | 11/14/2007 | | |
|
|
|
received letter of transmittal & letter from anderson peyton eng. also (3) sets of revisions from don kirkman architect (1) set 11 pages, (1) set 7 pages, 1 set 7 pages ---also (3) sets of plans with each sheet AO.O1, AO.O1b, A1.O1, A1.O2, A1.11, A3.O1, A5.O3, A5.O4, S1.2, S2.O, S2.1, S7.O, S7.1, P1.O1, P1.O2, P2.O1, P2.O2, M1.O1, M1.11, E3.11, E5.11--plans taken to Dan Stuart
|
Routing Off Site - STRUCTURAL | 11/7/2007 | | 11/14/2007 | | PASS |
|
|
|
sending resubmittal structrual plans and calcs called Action Courters for pick up. 11/14/07 - Jan Welch, Stapley Eng provided final approval letter for third party structural review.
|
Plan resubmittals received | | | 11/13/2007 | | |
|
|
|
Received transmittal and one copy of sheets S1.0, S1.1, S1.2, S2.0, S2.1, S2.2, S3.0, S3.1, S4.0, S4.1, S4.2, S5.0, S5.1, S6.0, S7.0, S7.2; taken to Dan Stuart
|
Plan resubmittals requested | | | 11/6/2007 | | DONE |
|
|
|
Resubmittal requirements e-mailed to architect.
|
Routing - PLAN CHECK | 10/4/2007 | | 11/6/2007 | | FAIL |
|
|
|
Resubmittal requirements e-mailed to architect. Structural plans to permit desk to re-route back to third party review.
|
Plan resubmittals received | | | 10/19/2007 | | |
|
|
|
Received 1 transmittal letter,1 comments1,1 special inspections,1 addendum # 4, 3 supplemental calcs,1 response, and 3 copies of sheets A0.01,A0.01A,A0.01B,A0.02,A0.03,A0.04,A0.05,A0.06,A0.07,A0.08,A0.09,A1.01,A1.02,A1.11,A2.01,A3.01,A4.01,A4.02,A5.01,A5.02,A5.03,A5.04,A6.01,A6.02,A7.01,A8.01,A8.02,A8.11,A9.01,S1.0,S1.1,S1.2,S2.0,S2.1,S2.2,S3.0,S3.1,S4.0,S4.1,S4.2,S5.0,S5.1,S6.0,S7.0,S7.1,P1.01,P1.02,P2.01,P2.02P3.01,M1.01,M1.02,M1.11,E1.02,E2.11,E2.12,E2.21,E3.11,E3.12,E5.11,E5.12E5.21E6.02 taken to Dan S.
|
Plan assigned to (M_P) | 7/16/2007 | 7/16/2007 | 10/5/2007 | | DONE |
|
|
|
PLans have been assigned to Dan Stuart.
|
Plan Reviewer's activity | | | 10/5/2007 | | |
|
|
|
Plans have been assigned to Dan Stuart.
|
1st review completed | | | 10/4/2007 | | FAIL |
|
|
|
|
Routing - FIRE | 9/28/2007 | | 10/4/2007 | | PASS |
|
|
|
Attached IFC review comments to plans.
|
Routing Off Site - STRUCTURAL | 7/16/2007 | | 9/28/2007 | | FAIL |
|
|
|
Called Action Courier for pick up 7/16/07 @ 1:03pm BAS
Outside reveiw complete, Sent correction report to the architect. Additional review required by outside engineering firm.
|
Routing - PLAN CHECK | 8/8/2007 | | 9/28/2007 | | FAIL |
|
|
|
Routing to fire for grading review
Plan review complete, sent correction report top the architect. Additional information is requried to be submitted for further review prior to issuing permit.
|
Plan resubmittals received | | | 9/13/2007 | | DONE |
|
|
|
Received 1 letter of transmittal, 3 copys of addendum # 2 and # 4 ,6 copys of sheet A0.01 , & 3 copys of sheets A0.10,0.11,0.07 taken to Mike P .
|
Routing - PLANNING | 7/30/2007 | | 8/8/2007 | | |
|
|
|
Pass DR JGW
Pass CU DCP (redlines on A0.01a)
CUP07-00066 & CUP07-00052-Diane Perkins
DRH07-00197 - Josh Wilson
CUP06-00098-Angela Wood
DRH06-00442-Greg Johnson
DRH07-00197-Josh Wilson
|
Routing - PLUMBING | 7/23/2007 | | 7/30/2007 | | PASS |
|
|
|
provide a floor sink under sink at beverage table room s-29. provide drain for the ice maker with bin room s-29. 120 deg. max hot water to public lavs. additional cross connection protection may be required.
|
Routing - Erosion and Sediment | 7/20/2007 | | 7/23/2007 | | PASS |
|
|
|
Refer to ESC07-00872 as master ESC plan for project.adh.
|
Routing PW Drainage | 7/17/2007 | | 7/18/2007 | | PASS |
|
|
|
|
Routing PW Sewer Rating | 7/17/2007 | | 7/17/2007 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 7/18/2007 | | 7/17/2007 | | PASS |
|
|
|
|
Pending Assignment by MYS | 7/13/2007 | | 7/16/2007 | | DONE |
|
|
|
7/16/2007 11:14:02 B_S - activity updated through activity BLDA170 from case BLD07-01846.
|
Plans ACCEPTED BY PLAN TECH | | | 7/16/2007 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 7/16/2007 | | |
|
|
|
|
Application received | | | 7/13/2007 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/13/2007 | | DONE |
|
|
|
|