(VALLEY VIEW - SKILLED NURSING FACILITY) 7/21/09 - PLAN MODIFICATION #3. Revise Bath Room; Modified size of Mechanical closets; Change Patient Room 101 to Semi-Private & 103 to Private Room; Revised Entries Into Dining Rooms; Made Activity Room Larger by deleting some rooms; Created Storage Room In Bathing Areas and Dressing Area in 2nd Floor bathing Area;Kept Original Central Supply Room instead of making another Patient Room; Eliminated Shafts By Routing Ducts to Exterior Walls in Ceiling Cavity instead of through 2nd Floor. ALL NOTES AND PLAN REVIEW ATTACHMENTS OF ORIGINAL Plan Review; 1ST Plan Mod (1/15/08); 2nd Plan Mod (5/14/08) & 3rd Plan Mod (7/21/09). Code compliance per the 2003 IBC. drs (5/14/08 - PLAN MODIFICATION 2 - TO MODIFY INTERIOR WINDOW FIRE RATING CLASSIFICATIONS; ADD DOOR, CHANGE JAMB THICKNESS, DOOR HARDWARE OPERATIONS, AND CLARIFICATION ON SPRINKLER SYSTEM MODIFICATIONS. SEE ATTACHED DETAILS AND CALL OUTS BY ARCHITECT AND RED-LINED NOTES ON PLANS AND CALL-OUTS. Window Q3 between S-331 & S-323 into 1-hour stair enclosure is not allowed. Only doors can open into enclosure, Sec. 1019.1.1 IBC. Reviewed with Sid Crandall by phone 5/23/08. Will issue addendum. drs 1/15/08 PLAN MODIFICATION - MODIFY SITE PLAN, BUILDING EXTERIORS, FLOOR PLAN LAYOUT, MECHANICAL, PLUMBING, ELECTRICAL, FOOD SERVICE AND STRUCTURAL PLANS. PLAN SHEETS NOT BEING CHANGED AND ALL PREVIOUS PLAN REVIEWS AND NOTES ON PLANS ARE STILL APPLICABLE UNLESS SPECIFICALLY MODIFIED AND APPROVED AS PART OF RESUBMITTALS. To remodel select portions of the existing interior and to add to the exterior of an existing skilled nursing facility. Work included in this permit as follows: Extending the existing two hour fire wall, which is used to separate this building from the R-2, independent living facility and is also used to separate the two different types of construction. To add approximately 5,810 square feet of new floor area to the first floor, this tabulated area includes a 3,800 square feet of additional floor area for the physical therapy wing, enlarging the existing dining room by 1,120 square feet, and the remainder 890 square feet includes the new covered entries and storage rooms. To add approximately 2,600 square feet of new floor area to the second floor. This area includes a 1,120 square feet addition to the existing dining room and 1,455 square feet is for new office space above the new physical therapy wing. Additional work included in this permit is to renovate selected residence rooms, office spaces, the nurse's station and lobby areas. All construction shall be per the approved plans and attached comment list. NOTE: This building is fully fire sprinklered with a NFPA 13 fire sprinkler system and is used for area increase. Refer to BLD 07-02235 for the grading and drainage. DRH 07-00197 CUP 07-00066 m-p/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 12/4/200912/29/2009 DONE
First Notice 11/24/200911/25/2009 DONE
DetailsBarbara Stitt
Permanent Occupancy  10/23/2009 DONE
BLD-Final10/20/200910/21/200910/21/2009PPASS
DetailsTom Arcoraci
John Phone #: ###-####
FIRE-Final Inspection10/8/200910/9/200910/9/2009APASS
DetailsTroy Cobbley
Life safety passed.
FIRE-Final Inspection10/6/200910/7/200910/7/2009AFAIL
DetailsTroy Cobbley
Life safety will be ok to pass when the project related fire alarm and fire sprinkler permits are passed.
Zoning Approval10/5/200910/5/200910/5/2009 DONE
DetailsJosh Wilson
PubWorks Occupancy Approval10/2/200910/2/200910/2/2009 DONE
DetailsTiffany Lowery
BLD-Final9/11/20099/14/20099/14/2009APART
DetailsTom Arcoraci
john Phone #: ###-####
BLD-Final9/10/20099/11/20099/11/2009PDEFR
DetailsJim Storey
john Phone #: ###-#### out of time.
FIRE-Final Inspection9/10/20099/11/20099/11/2009APART
DetailsTroy Cobbley
The life safety is passed in the first floor shower room and isolation room.
FIRE-Sprinkler Rough-in9/10/20099/10/20099/10/2009PFAIL
DetailsTroy Cobbley
The project related fire alarm permit needs addressed prior to life safety. I did have the emergency light in the shower room tested while I was waiting for the fire alarm contractor. Will need to be rescheduled.
BLD-Other9/4/20099/4/20099/4/2009PPASS
DetailsJim Sly
John- fire wall Phone #: ###-####
Existing holes in existing CMU wall filled in with dry pack mortar.......Room 325
BLD-Framing/Rough-in8/27/20098/28/20098/28/2009APART
DetailsJim Sly
john Phone #: ###-####
Grid...Day room and Isolation Rm ...OK. Frame....S-2 Storage and S-41 Toilet Rm....OK
BLD-Framing/Rough-in8/20/20098/21/20098/21/2009APASS
DetailsMike Jordan
Ben Phone #: ###-####. 1st and 2nd. floor patient room seperation walls ok.
BLD-Framing/Rough-in8/20/20098/20/20098/20/2009PNR
DetailsTony Young
Ben Phone #: ###-####
need elec 1st
BLD-Framing/Rough-in8/13/20098/14/20098/14/2009APASS
DetailsJim Storey
ben Phone #: ###-#### 1 st floor 2 hr wall ok to cover rm and fur out.
BLD-Framing/Rough-in7/30/20097/30/20097/30/2009PFAIL
DetailsJim Storey
Ben Phone #: ###-#### maintane 2hr wall assembly.
CHANGE STATUS TO (ISS)  7/30/2009 DONE
(F) Reprint permit  7/30/2009 DONE
OVERRIDE  7/29/2009  
Telephone call  7/29/2009 DONE
Details
left vm for angela at ###-#### - permit (plan mod #3) ready and fees given
Override - Parcel Holds  7/29/2009  
Permit Ready to Issue  7/29/2009 DONE
Details
Plan assigned to (DRS)7/20/20097/20/20097/28/2009 PASS
DetailsDan Stuart
7/28/2009 17:42:26 DRS - activity updated through activity BLDA022 from case BLD07-01846.
Routing - PLAN CHECK7/21/2009 7/28/2009 PASS
DetailsDan Stuart
Plan Mod 3 - Interior room use changes, fixture layout changes, delete some original rooms; leave some rooms without any modifications (pre-2007); modify ductwork, plumbing & electrical. Plan Modification Plans to permit desk to issue.
PLANS/APPL TAKEN TO FRONT DESK  7/28/2009 PASS
Override - Parcel Holds  7/28/2009  
Plan Modification Accepted  7/20/2009  
DetailsDan Stuart
Plan mod rec'd for- Revised the bathing rooms, modified the size of the mechanical closets. Change patient room 101 into a semi-private room and 103 into private room. Revised the entried into the dining rooms, made activity room larger, created storage rooms in bathing areas. Kept existing central supply and janitors closets. Eliminated shafts for fresh air and octained thru wall. Rec'd A0.01; A0.01a; A0.01b; A0.02; A0.03; A0.04; A0.05; A0.06; A0.07; A0.08; A0.10; A0.11; A1.01; A1.02; A1.11; A3.01; A6.01; A6.02; A6.03; A7.01; A8.01; A8.02; A8.11; P1.01; P1.11; P2.01; P2.11; M1.01; M1.02; M1.11; E2.11; E2.21; E3.21- Taken to Dan S
Temporary Occupancy UNPAID FEE  7/2/2009 DONE
Temporary Occupancy UNPAID FEE  7/2/2009 DONE
BLD-Final6/30/20097/1/20097/1/2009PPART
DetailsTom Arcoraci
Ben Phone #: ###-####
FIRE-Final Inspection6/30/20097/1/20097/1/2009PPART
DetailsTroy Cobbley
Emergency lighting has been provided in the second floor, skilled nursing shower. Life safety in this area is passed.
PubWorks Occupancy Approval7/1/20097/1/20097/1/2009 PASS
DetailsTisha Gallop
Per phone call from Dan Erskine ok for temporary occupancy for entire building, no card to sign off on.
FIRE-Final Inspection6/30/20096/30/20096/30/2009PPART
DetailsTroy Cobbley
Life safety is complete in the Area B of Skilled Nursing. Emergency lighting is required in the new shower rooms on the second floor of skilled nursing prior to occupnancy of the shower room.
BLD-Framing/Rough-in6/29/20096/29/20096/29/2009PPEND
DetailsTom Arcoraci
Ben-ceiling grid inspection please Phone #: ###-####
FIRE-Final Inspection6/29/20096/29/20096/29/2009PFAIL
DetailsTroy Cobbley
Inspection was for Area B skilled nursing (1st and 2nd floors). The project related fire alarm permit for this area needs to be completed which includes the installation of the door release at the nurse's station. Provide white background for signage on doors. Provide emergency lighting above signed delayed egress doors. Per Dan Stuart, resubmittals are required showing delayed egress locks being installed in this area.
Temporary Occupancy UNPAID FEE  6/23/2009 PASS
DetailsJenifer Gilliland
BLD-Framing/Rough-in6/19/20096/19/20096/19/2009PPASS
DetailsTom Arcoraci
ben - ceiling grid Phone #: ###-####
BLD-Final6/5/20096/5/20096/5/2009PPART
DetailsTom Arcoraci
ben Phone #: ###-####
FIRE-Final Inspection6/4/20096/5/20096/5/2009APART
DetailsTroy Cobbley
The life safety passed on first floor skilled nursing/entry way and associated rooms and the second floor activities area directly above it.
Override - Parcel Holds6/5/20091/1/19006/5/2009  
area not being modified
Override - Parcel Holds  6/5/2009  
Temporary Occupancy UNPAID FEE  6/5/2009 DONE
DetailsAlexandra L. DeYoung
Override - Parcel Holds  6/5/2009  
Temporary Occupancy UNPAID FEE  6/5/2009 DONE
DetailsAlexandra L. DeYoung
Override - Parcel Holds6/4/20091/1/19006/4/2009  
fire life safety
FIRE-Final Inspection6/2/20096/3/20096/3/2009AFAIL
DetailsTroy Cobbley
This inspection was for two new entry areas Emergency lighting is required in the exit way. Atleast one fire extinguisher is required as discussed. An exit sign leading to the exit way is missing. The project related fire alarm for this area had issues as well See the city approved fire alarm plans for deficiancies. They include smoke detector and a door holder that are not shown on the plans. A door holder that is shown on the plans but has not been installed. A remote annunciator that has not been installed. A smoke detector that does not set off the general alarm. A room missing a strobe. A wall mount a/v has been revised to a ceiling mount and was the wrong candella. All of these items are in a very small area.
FIRE-Final Inspection6/1/20096/2/20096/2/2009ACANC
DetailsTroy Cobbley
ben Phone #: ###-####
Override - Parcel Holds6/2/20091/1/19006/2/2009  
fire life safety
Zoning Approval Temp5/28/20095/28/20095/28/2009 PASS
DetailsJosh Wilson
BLD-Framing/Rough-in5/13/20095/14/20095/14/2009APASS
DetailsTom Arcoraci
Ben Phone #: ###-####
BLD-Framing/Rough-in4/14/20094/15/20094/15/2009APASS
DetailsTom Arcoraci
Ben Phone #: ###-####
BLD-Other3/13/20093/16/20093/16/2009APASS
DetailsTom Arcoraci
ceiling grid inspection//ben ###-####
BLD-Other3/6/20093/9/20093/9/2009APASS
DetailsTom Arcoraci
John- ceiling grid Phone #: ###-####
BLD-Wall cover3/3/20093/3/20093/3/2009PPART
DetailsTom Arcoraci
BLD-Framing/Rough-in3/2/20093/3/20093/3/2009APASS
DetailsTom Arcoraci
ben Phone #: ###-#### wip ok
Temporary Occupancy2/26/20095/27/20092/26/2009 DONE
DetailsDarla L Downs
BLD-Final2/25/20092/25/20092/25/2009PPART
DetailsTom Arcoraci
Ben- temp Phone #: ###-####
FIRE-Final Inspection2/24/20092/25/20092/25/2009APART
DetailsTroy Cobbley
The first and second floor dining areas are ok to occupy. The second floor nurses station is ok to occupy.
FIRE-Final Inspection2/23/20092/24/20092/24/2009PFAIL
DetailsTroy Cobbley
The project related fire alarm permit needs addressed. There are missing emergency lights in the second floor dining area and one addition light is needed see plan for location. The exit sign infront of the second floor stair access did not operate.
BLD-Other2/11/20092/11/20092/11/2009PPART
DetailsTom Arcoraci
John Phone #: ###-#### wip ok
BLD-Other1/27/20091/28/20091/28/2009APASS
DetailsTom Arcoraci
Brian-Inspection for steel beams & fire proofing please Phone #: ###-#### wip ok
BLD-Framing/Rough-in12/30/200812/30/200812/30/2008PPASS
DetailsTom Arcoraci
John Phone #: ###-#### wip 2nd floor ok
BLD-Other12/2/200812/3/200812/3/2008APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/2/2008 at 4:23:53 PM. Contact: ###-####.
BLD-Framing/Rough-in11/20/200811/20/200811/20/2008PPASS
DetailsTom Arcoraci
BLD-Framing/Rough-in11/19/200811/20/200811/20/2008APASS
DetailsTom Arcoraci
john Phone #: ###-####
BLD-Other10/7/200810/7/200810/7/2008PPASS
DetailsJim Storey
temp stair encloser ok for use.
BLD-Other9/30/20089/30/20089/30/2008PFAIL
DetailsMike Jordan
john - temp egress Phone #: ###-####. Still lacking onr rated door to complete exit corridor. Can not continue until door is in place.
BLD-Framing/Rough-in9/16/20089/16/20089/16/2008PPART
DetailsMike Jordan
Framing for new parapet. wip.
BLD-Energy code compliance9/10/20089/16/20089/16/2008PCANC
DetailsMike Jordan
Plan resubmittals received  9/11/2008 DONE
DetailsDan Stuart
Received 1 letter of transmittal from Wyatt Leonard, 3 copies of the following sheets- A0.10 & A0.11 and taken to Dan Stuart
BLD-Framing/Rough-in9/5/20089/10/20089/10/2008PPART
DetailsMike Jordan
Framing for new parapet.
BLD-Framing/Rough-in9/3/20089/5/20089/5/2008PPART
DetailsMike Jordan
Framing for new parapet.
BLD-Framing/Rough-in8/27/20089/3/20089/3/2008PPART
DetailsMike Jordan
Framing for paprpet wall.
BLD-Framing/Rough-in8/27/20088/27/20088/27/2008PPART
DetailsMike Jordan
John Phone #: ###-####. Trusses for new parapet on existing roof.
BLD-Framing/Rough-in8/1/20088/1/20088/1/2008PPASS
DetailsTom Arcoraci
John Phone #: ###-####
BLD-Aging Inspection7/18/20087/18/20087/18/2008 PASS
DetailsTom Arcoraci
wip
CHANGE STATUS TO (ISS)  6/13/2008 DONE
(F) Reprint permit  6/13/2008 DONE
Plan assigned to (DRS)5/15/20085/15/20086/9/2008 PASS
DetailsDan Stuart
6/9/2008 06:57:32 DRS - activity updated through activity BLDA022 from case BLD07-01846.
Routing - PLAN CHECK5/27/2008 6/9/2008 PASS
DetailsDan Stuart
Routing to permit desk to issue Plan Modification Permit.
PLANS/APPL TAKEN TO FRONT DESK  6/9/2008 PASS
To permit desk to issue Plan Mod 2 permit.
Print Occupancy Form  6/9/2008 DONE
Details
Telephone call  6/9/2008 DONE
Details
left vm for sid crandall at ###-#### - permit ready and fees given
Override - Parcel Holds  6/9/2008  
Override - Parcel Holds  6/9/2008  
Override - Parcel Holds  6/9/2008  
Permit Ready to Issue  6/9/2008 DONE
Details
Routing - FIRE5/23/2008 5/27/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
Routing - PLAN CHECK5/14/2008 5/23/2008 PEND
DetailsDan Stuart
Routing to fire code analyst. Reviewed limitations of openings into stair enclosure with Sid Crandall on phone will issue addendum removing window Q3 from wall between stair enclosure S-331 & conference room S-332.
Override - Parcel Holds  5/22/2008  
Override - Parcel Holds  5/22/2008  
Override - Parcel Holds  5/22/2008  
Plan Modification Accepted  5/14/2008  
Plan modification accepted for Bld07-01846 for Valley View Skilled Nursing Facility to make interior architectural and fire protection changes (see scanned application for more details); submitted on Addendum # 7, and sheets A0.01, A1.01, A1.02, A1.11, A3.01, A5.03, A5.04, A6.03, A7.01, FP1.01; routed to Dan Stuart
Telephone call  4/29/2008 DONE
Phone call from Sid Crandal - provided a shaft wall detail U.L. U469 for 1-hour shaft enclosure of existing ductwok penetrating the rated floor assembly at SNF. A smoke/fire damper is being installed at the 1-hour floor at the bottom of the shaft. Copy of the detail and architects data forwarded to Tom Arcoraci.
BLD-Aging Inspection2/28/20082/28/20082/28/2008 PASS
DetailsTom Arcoraci
wip ok
Issue PAID IN FULL permit  2/15/2008 DONE
Print Occupancy Form  2/14/2008 DONE
Telephone call  2/14/2008 DONE
left vm for linda cross at ###-#### - permit ready and fees given
Permit Ready to Issue  2/14/2008 DONE
Plan assigned to (DRS)1/17/20081/17/20082/13/2008 PASS
DetailsDan Stuart
2/13/2008 16:16:12 DRS - activity updated through activity BLDA022 from case BLD07-01846.
Routing - PLAN CHECK2/9/2008 2/13/2008 PASS
DetailsDan Stuart
To permit desk to reissue.
PLANS/APPL TAKEN TO FRONT DESK  2/13/2008 PASS
Plan mod review completed.
Routing - FIRE2/5/2008 2/9/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
Routing - PLUMBING2/1/2008 2/5/2008 PASS
DetailsBill VanDegrift
per plans and 2003 upc
Routing - PUBLIC WORKS1/31/2008 2/5/2008 PASS
DetailsBeverly Hall
Routing PW Solid Waste2/1/2008 2/1/2008 PASS
DetailsPeter J. McCullough
Routing PW Sewer Rating2/1/2008 2/1/2008 PASS
DetailsLouise Waldorf
Routing PW Drainage2/1/2008 2/1/2008 PASS
DetailsBrian Murphy
Routing PW Environmental2/1/2008 2/1/2008 PASS
DetailsWalt Baumgartner
West Boise sewer district jurisdiction, existing grease abatement,
Routing - PLANNING1/22/2008 1/31/2008 PASS
DetailsJon Williams
DRH07-00197 - Josh Wilson
Routing - PLAN CHECK1/22/2008 1/22/2008 PEND
DetailsDan Stuart
ROUTED TO PLANNING TO REVIEW EXTERIOR PLAN MODIFICATIONS & SITE PLAN.
Plan Modification Accepted  1/17/2008  
Plan modification accepted for modifications to exterior, interior, structural, plumbing, mechanical, and electrical; see attached scanned document for further details. Submitted on pages A0.01, A0.01a, A0.01b, A0.02, A0.03, A0.04, A0.05, A0.06, A0.07, A0.08, A0.09, A0.10, A1.01, A1.02, A1.11, A3,01, A5.02, A5.04, A6.01, A6.02, A6.03, A7.01, A8.02, A8.11, FSE-1, FSE-2, FSE-3, FSE-4, FSE-1a, FSE-2a, FSE-3a, FSE-4a, S2.0, S2.2, S3.0, S3.1, S5.1, S6.0, P1.01, P1.02, P2.01, P2.02, FP1.02, M1.02, E2.11, E2.12, E3.11, E3.12, E3.21, E5.11, E5.12, E6.02; routed to Dan Stuart.
Issue PAID IN FULL permit  11/29/2007 DONE
CHANGE ISSUED DATE  11/29/2007  
Print Occupancy Form  11/28/2007 DONE
Telephone call  11/28/2007 DONE
lft vm with drew brown ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  11/28/2007 DONE
Plan assigned to (DRS)10/5/200710/5/200711/21/2007 PASS
11/21/2007 16:20:41 DRS - activity updated through activity BLDA022 from case BLD07-01846.
Routing - PLAN CHECK11/6/2007 11/21/2007 PASS
Plans approved to include redlined notes thereon and all attched plan review comments of all reviewing agencies. Routing to permit desk to issue.
PLANS/APPL TAKEN TO FRONT DESK  11/21/2007 PASS
PLANS AND SPECS TO PERMIT DESK TO ISSUE
Plan resubmittals received  11/14/2007  
received letter of transmittal & letter from anderson peyton eng. also (3) sets of revisions from don kirkman architect (1) set 11 pages, (1) set 7 pages, 1 set 7 pages ---also (3) sets of plans with each sheet AO.O1, AO.O1b, A1.O1, A1.O2, A1.11, A3.O1, A5.O3, A5.O4, S1.2, S2.O, S2.1, S7.O, S7.1, P1.O1, P1.O2, P2.O1, P2.O2, M1.O1, M1.11, E3.11, E5.11--plans taken to Dan Stuart
Routing Off Site - STRUCTURAL11/7/2007 11/14/2007 PASS
sending resubmittal structrual plans and calcs called Action Courters for pick up. 11/14/07 - Jan Welch, Stapley Eng provided final approval letter for third party structural review.
Plan resubmittals received  11/13/2007  
Received transmittal and one copy of sheets S1.0, S1.1, S1.2, S2.0, S2.1, S2.2, S3.0, S3.1, S4.0, S4.1, S4.2, S5.0, S5.1, S6.0, S7.0, S7.2; taken to Dan Stuart
Plan resubmittals requested  11/6/2007 DONE
Resubmittal requirements e-mailed to architect.
Routing - PLAN CHECK10/4/2007 11/6/2007 FAIL
Resubmittal requirements e-mailed to architect. Structural plans to permit desk to re-route back to third party review.
Plan resubmittals received  10/19/2007  
Received 1 transmittal letter,1 comments1,1 special inspections,1 addendum # 4, 3 supplemental calcs,1 response, and 3 copies of sheets A0.01,A0.01A,A0.01B,A0.02,A0.03,A0.04,A0.05,A0.06,A0.07,A0.08,A0.09,A1.01,A1.02,A1.11,A2.01,A3.01,A4.01,A4.02,A5.01,A5.02,A5.03,A5.04,A6.01,A6.02,A7.01,A8.01,A8.02,A8.11,A9.01,S1.0,S1.1,S1.2,S2.0,S2.1,S2.2,S3.0,S3.1,S4.0,S4.1,S4.2,S5.0,S5.1,S6.0,S7.0,S7.1,P1.01,P1.02,P2.01,P2.02P3.01,M1.01,M1.02,M1.11,E1.02,E2.11,E2.12,E2.21,E3.11,E3.12,E5.11,E5.12E5.21E6.02 taken to Dan S.
Plan assigned to (M_P)7/16/20077/16/200710/5/2007 DONE
PLans have been assigned to Dan Stuart.
Plan Reviewer's activity  10/5/2007  
Plans have been assigned to Dan Stuart.
1st review completed  10/4/2007 FAIL
Routing - FIRE9/28/2007 10/4/2007 PASS
Attached IFC review comments to plans.
Routing Off Site - STRUCTURAL7/16/2007 9/28/2007 FAIL
Called Action Courier for pick up 7/16/07 @ 1:03pm BAS
Outside reveiw complete, Sent correction report to the architect. Additional review required by outside engineering firm.
Routing - PLAN CHECK8/8/2007 9/28/2007 FAIL
Routing to fire for grading review
Plan review complete, sent correction report top the architect. Additional information is requried to be submitted for further review prior to issuing permit.
Plan resubmittals received  9/13/2007 DONE
Received 1 letter of transmittal, 3 copys of addendum # 2 and # 4 ,6 copys of sheet A0.01 , & 3 copys of sheets A0.10,0.11,0.07 taken to Mike P .
Routing - PLANNING7/30/2007 8/8/2007  
Pass DR JGW
Pass CU DCP (redlines on A0.01a)

CUP07-00066 & CUP07-00052-Diane Perkins
DRH07-00197 - Josh Wilson
CUP06-00098-Angela Wood
DRH06-00442-Greg Johnson
DRH07-00197-Josh Wilson
Routing - PLUMBING7/23/2007 7/30/2007 PASS
provide a floor sink under sink at beverage table room s-29. provide drain for the ice maker with bin room s-29. 120 deg. max hot water to public lavs. additional cross connection protection may be required.
Routing - Erosion and Sediment7/20/2007 7/23/2007 PASS
Refer to ESC07-00872 as master ESC plan for project.adh.
Routing PW Drainage7/17/2007 7/18/2007 PASS
Routing PW Sewer Rating7/17/2007 7/17/2007 PASS
Routing - PUBLIC WORKS7/18/2007 7/17/2007 PASS
Pending Assignment by MYS7/13/2007 7/16/2007 DONE
7/16/2007 11:14:02 B_S - activity updated through activity BLDA170 from case BLD07-01846.
Plans ACCEPTED BY PLAN TECH  7/16/2007  
Plan routing begun/NEW & ADDTN  7/16/2007  
Application received  7/13/2007  
Recd Pcfee & Taken To Pln CK  7/13/2007 DONE