Permit Information
Permit NumberBLD07-01868
StatusFinaled
Name GUENTHER MGMT
Site Address 8030 W EMERALD ST Unit: 165
Project NamePOSITIVE CHANGES HYPNOSIS
Customer Number 
ePlanReviewNo
Description
**[ Positive Change Hypnosis ]** [suite # 165] To remodel exsisting 3946 sq ft office space per approved plans. Work to include new nonbearing interior partions to create individual office, storage and inlarge restroom to meet accessibility standards.Relocate exsiting lights repair or replace existing ceilling tile.miscellaneous related interior finshes. This building is fully fire sprinkled ANY ALTERATION OR MODIFICATIONS TO THE SPRINKLER SYSTEM WILL REQUIRE A SEPARATE PERMIT, and shall be instaled and maintained per NFPA313 as regulated by the fire dept. jds
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD10/30/200710/30/200711/6/2007 DONE
Second Notice has not been responded to.
Routing - PLAN CHECK7/17/2007 11/6/2007 PASS
Jim Story
Second Notice BLD10/1/200710/1/200710/30/2007 DONE
First Notice has not been responded to.
First Notice 9/5/200710/1/2007 DONE
Permanent Occupancy UNPAID FEE  9/5/2007 DONE
BLD-Final9/4/20079/4/20079/4/2007PPASS
DetailsTom Arcoraci
Mike; Phone #: ###-#### Internet Inspection Request from: Hattie James
BLD-Final8/23/20078/24/20078/24/2007PNR
DetailsMike Jordan
sergy Phone #: ###-####
FIRE-Final Inspection8/23/20078/23/20078/23/2007PPASS
DetailsTroy Cobbley
life safety passed
FIRE-Final Inspection8/21/20078/22/20078/22/2007AFAIL
DetailsTroy Cobbley
Provide aproved hardware on the north facing exit door. The keyed hardware deadbolt needs to be removed. All other items are ok.
BLD-Final8/17/20078/17/20078/17/2007PNR
DetailsMike Jordan
Serge; Phone #: ###-#### Internet Inspection Request from: Hattie James
BLD-Framing/Rough-in7/26/20077/27/20077/27/2007PPASS
DetailsTom Arcoraci
sergey Phone #: ###-####
Issue PAID IN FULL permit  7/24/2007 DONE
Telephone call  7/23/2007 DONE
t/c w doug watson at ###-#### - permit ready and fees given - also need gc name and rce#
Permit Ready to Issue  7/23/2007 DONE
Routing - PLAN CHECK7/16/2007 7/20/2007 PASS
Routing - FIRE7/20/2007 7/20/2007 PASS
Minor remodel / Field Verify
Case Summary (BLD)  7/20/2007 DONE
1st review completed  7/20/2007 PASS
PLANS/APPL TAKEN TO FRONT DESK  7/20/2007 PASS
Print Occupancy Form  7/20/2007 DONE
Application received  7/17/2007  
Plans ACCEPTED BY PLAN TECH  7/17/2007  
Recd Pcfee & Taken To Pln CK  7/17/2007 DONE