Permit Information
Permit NumberBLD07-01884
StatusFinaled
Name WESTERN TRAILERS
Site Address 251 W GOWEN RD
Project NameWestern Trailers
Customer Number 
ePlanReviewNo
Description
(WESTERN TRAILERS) To construct a new 55,415 square foot, two story, shop warehouse and office building and related site improvements. The building is constructed of a pre-engineered steel building. All construction per the approved plans and attached comment list. (First Floor: 51,045 square feet, Second Floor: 4,370 square feet) JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  3/6/2012  
Third Notice BLD9/22/20089/22/200812/24/2008 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Second Notice BLD8/11/20088/11/20089/22/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 7/16/20088/11/2008 DONE
Override - Condition Holds  7/16/2008  
Permanent Occupancy UNPAID FEE  7/16/2008  
BLD-Final7/15/20087/15/20087/15/2008PPASS
DetailsJim Storey
Herb Phone #: ###-####
FIRE-Final Inspection7/15/20087/15/20087/15/2008PPASS
DetailsForrest France
All corrections were made per notes from last inspection. KR
Override - Condition Holds7/15/20081/1/19007/15/2008  
fire insp
FIRE-Final Inspection7/9/20087/10/20087/10/2008AFAIL
DetailsForrest France
Sprinkler plans are not finaled. Fire extinguisher in warehouse and truck shop need to be 4A, wrong extiguishers were installed. Fire extinguishers in offices need to be hung, Egress lighting at all exit from office spaces were not installed and misc emergency lights did not function. All egeress and emergency lights need to be retested.KR
Code Occupancy Approval  6/26/2008 DONE
Inspection shows compliance w/ landscaping, curbing, striping requirements
CHANGE STATUS TO (ISS)  6/25/2008 DONE
(F) Reprint permit  6/25/2008 DONE
OVERRIDE  6/11/2008  
Print Occupancy Form  6/11/2008 DONE
Details
Telephone call  6/11/2008 DONE
Details
left message w leslie for rocky towle at ###-#### - permit ready and fees given
Override - Condition Holds  6/11/2008  
Permit Ready to Issue  6/11/2008 DONE
Details
Routing - PLAN CHECK5/29/2008 6/10/2008 PASS
DetailsJohn Menard
Plan Reviewer's activity  6/10/2008 PASS
DetailsJohn Menard
Reviewed and approved modification for installation of required smoke and heat vents. Information on vents with fire reviewer. JCM
PLANS/APPL TAKEN TO FRONT DESK  6/10/2008 DONE
DetailsJohn Menard
Plan assigned to (JCM)5/29/2008 6/10/2008 PASS
DetailsJohn Menard
6/10/2008 13:46:47 JCM - activity updated through activity BLDA022 from case BLD07-01884.
BLD-Framing/Rough-in5/29/20085/30/20085/30/2008APASS
DetailsJim Storey
herb - ###-#### - ceiling cover
Plan Modification Accepted  5/29/2008  
Plan Modification accepted for Bld07-01884 (Western Trailers) to add (8) smoke/fire vents to the roof over the parts warehouse. Submitted on sheet A1.1; routed to John Menard
Routing - FIRE5/29/2008 5/29/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
Override - Parcel Holds  5/29/2008  
Override - Condition Holds  5/29/2008  
BLD-Energy code compliance4/10/20084/11/20084/11/2008PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/10/2008 at 3:28:51 PM. Contact: ###-####.
BLD-Framing/Rough-in4/8/20084/9/20084/9/2008APASS
DetailsJim Storey
herb Phone #: ###-####
BLD-Aging Inspection2/29/20082/29/20082/29/2008 PASS
DetailsJim Storey
wip
BLD-Footing9/26/20079/26/20079/26/2007PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/26/2007 at 8:44:22 AM. Contact: ###-####.center pad ft ok
BLD-Footing9/24/20079/24/20079/24/2007PPART
DetailsJim Storey
herb Phone #: ###-#### need si from engineer to justafy n/a .
(F) Reprint permit  9/24/2007  
Routing - PLAN CHECK9/20/2007 9/21/2007 PASS
PLANS/APPL TAKEN TO FRONT DESK  9/21/2007 DONE
Print Occupancy Form  9/21/2007 DONE
Telephone call  9/21/2007 DONE
left message w andy for rocky towle at ###-#### - permit ready and fees given - also need ACHD receipt
Permit Ready to Issue  9/21/2007 DONE
Issue PAID IN FULL permit  9/21/2007 DONE
Plan assigned to (JCM)7/24/2007 9/21/2007 PASS
9/21/2007 08:23:18 JCM - activity updated through activity BLDA022 from case BLD07-01884.
Routing - FIRE9/19/2007 9/20/2007 PASS
Attached updated review comments to plans.
Additional plans submitted  9/20/2007 DONE
Recieved Hazardous materials list from owner.
Routing - PLUMBING9/17/2007 9/19/2007 PASS
per plans and 2003 upc
Routing - PUBLIC WORKS9/14/2007 9/17/2007 PASS
Routing PW Solid Waste9/17/2007 9/17/2007 PASS
Routing - PLANNING9/11/2007 9/14/2007 PASS
REDLINES SHEET L1
Plan resubmittals received  9/12/2007  
Received 2 copies of page A0.1; inserted into plans by runner and took plans back to Josh Wilson
Routing - PUBLIC WORKS9/7/2007 9/11/2007 FAIL
Solid Waste failed. See entry.
Routing PW Solid Waste9/11/2007 9/11/2007 FAIL
Proposed changes to plans not made.
Plan Reviewer's activity  9/7/2007 PASS
Reviewed and approved structural and nonstructural revisions. JCM
Routing - PLAN CHECK8/16/2007 9/7/2007 PASS
Plan resubmittals received  8/29/2007  
Received 1 cover transmittal from Design Resources, 1 plan review responce from Design Resources (2 Pgs), 1 cover transmittal from K2 Construction, 2 copies of Plan review responces and letter for Structural from Butler Manufacturing, 2 copies of Footing & Foundations structual calcs from Harrison Engineering, 2 copies of the following sheets-S5, C-5, P1.2, P1.3, M1.2, M1.3, A1.1, A1.2, A1.3, A1.4, A3.3, A4.1, A7.4 and taken to John Menard
1st review completed  8/16/2007 FAIL
Routing - FIRE8/13/2007 8/16/2007 FAIL
Faxed resubmittal item to architect.
Routing - PLAN CHECK8/9/2007 8/13/2007 FAIL
John Menard
Routing - PLANNING8/6/2007 8/9/2007 FAIL
Spoke with applicant-- submitting new site plan

DRH07-00013-Josh Wilson
Routing - PLUMBING7/31/2007 8/6/2007 FAIL
note 5 page P1.2- increase cold water pipe size to 1 1/4". provide sewer pump detail, septic tank, etc.
Routing Off Site - STRUCTURAL7/24/2007 8/1/2007 FAIL
Called action Courier to pick up on 7/24/07 @ 11:00am BAS - received comment list from consulting structural engineer requesting revisions. JCM
Plan Reviewer's activity  8/1/2007 FAIL
Reviewed plans and found revisions required.
Plan resubmittals requested  8/1/2007 DONE
E-mailed the architect a copy of the plan review requesting revisions. JCM
Plan resubmittals requested  8/1/2007 DONE
Faxed the architect a copy of the structural plan review requesting revisions.
Routing - Erosion and Sediment7/30/2007 7/31/2007 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS7/24/2007 7/30/2007 FAIL
Routing PW Sewer Rating7/25/2007 7/30/2007 PASS
Routing PW Environmental7/25/2007 7/30/2007 PASS
Use approved design for truck wash oil/sediment interceptor.
Routing PW Solid Waste7/25/2007 7/27/2007 FAIL
1. Clarification of trash and recycling containers size 2. If roll-offs need 65-70 Ft. clearence in front of containers.
Routing PW Drainage7/25/2007 7/26/2007 PASS
Routing PW Sewer Design7/25/2007 7/26/2007 PASS
Routing PW Street Lights7/25/2007 7/25/2007 PASS
Plans ACCEPTED BY PLAN TECH  7/24/2007 DONE
All plans brought back stamped & signed///7/23/07 BAS
Routing - PLANNING Land Div7/24/2007 7/24/2007 PASS
Parcel is larger than 5 acres
Plans ACCEPTED BY PLAN TECH  7/23/2007 FAIL
Missing stampand signature on steel building plans-all plans were taken off site by Design Resources to be stamped and signed and returned///7/23/07 @ 1:45pm BAS
Plan routing begun/NEW & ADDTN  7/23/2007  
CHANGE STATUS TO (PND)  7/23/2007 DONE
Plans taken off site by Design Resouce to be stamped & signed///7/23/07 @ 1:45pm BAS
Recd Pcfee & Taken To Pln CK  7/19/2007  
Application received  7/18/2007  
BLD-Final7/9/20087/10/2008 P 
DetailsJim Storey
Hurb Phone #: ###-####