Third Notice | | 11/1/2009 | 11/5/2009 | | DONE |
|
|
|
|
Telephone call | | | 11/5/2009 | | DONE |
Tisha Gallop
|
|
|
called and spoke with Jody/Beniton Const. need final values. She said is still getting change orders for the main building (bld07-01910) but will fax me the fv for the storage bldg (bld07-02483) and concessions stand (bld09-00012). She said I don't need to fax or mail her, she already has the paperwork.
|
Third Notice | | 10/9/2009 | 10/22/2009 | | DONE |
|
|
|
faxed, mailed and called
|
Telephone call | | | 10/22/2009 | | DONE |
Tisha Gallop
|
|
|
called and left vm for Jody Wilson (Prj. mgr) w/Beniton Const. need final values
|
Third Notice | | 9/28/2009 | 9/29/2009 | | DONE |
|
|
|
|
Second Notice | | 9/17/2009 | 9/18/2009 | | DONE |
|
|
|
|
First Notice | | 8/18/2009 | 9/17/2009 | | DONE |
|
|
|
|
BLD-Final | 8/18/2009 | 8/18/2009 | 8/18/2009 | P | PASS |
Dave Hannah
|
|
|
russ Phone #: ###-#### ok for perm occ
|
BLD-Final | 8/14/2009 | 8/17/2009 | 8/18/2009 | A | PART |
Dave Hannah
|
|
|
Russ Phone #: ###-#### ok for temp occ ok for perm occ after zoning finals
|
Permanent Occupancy | | | 8/18/2009 | | DONE |
Tisha Gallop
|
|
|
|
Zoning Approval | 8/17/2009 | 8/17/2009 | 8/17/2009 | | PASS |
David Moser
|
|
|
Landscaping is 98% complete and ACHD is adding seepage pit at SW corner and well is being connected to at SE corner of site. ESC control still in place around these construction of the site. Area around tennis courts need to be seeded.
|
FIRE-Final Inspection | 8/14/2009 | 8/14/2009 | 8/14/2009 | P | PASS |
Forrest France
|
|
|
Items on correction notice regarding EM lights and exit signs field verified for completion, remainder of building fire life safety inspection passed, discussed permit finals for two outbuildings.
|
FIRE-Final Inspection | 8/13/2009 | 8/13/2009 | 8/13/2009 | P | NR |
Forrest France
|
|
|
Notified contractor that project related FIR permit for hood suppression must first be finaled prior to fire life safety.
|
PubWorks Occupancy Approval | 8/11/2009 | 8/11/2009 | 8/11/2009 | | DONE |
Tiffany Lowery
|
|
|
|
FIRE-Final Inspection | 8/4/2009 | 8/4/2009 | 8/4/2009 | P | NR |
Forrest France
|
|
|
Need to final project related FIR hood suppression permit prior to building fire life safety approvals.
|
FIRE-Final Inspection | 7/13/2009 | 7/14/2009 | 7/14/2009 | A | FAIL |
Troy Cobbley
|
|
|
The items needing correctlng for a life safety final include repairing all of the first floor exit signs and emergency lights as circled in red on the city approved plans. None of the second floor exit signs or emergency lights have been tested. All other life safety items are passed.
|
FIRE-Final Inspection | 6/5/2009 | 6/5/2009 | 6/5/2009 | A | NR |
Forrest France
|
|
|
Contact Russ on site
|
BLD-Other | 5/6/2009 | 5/6/2009 | 5/7/2009 | P | PASS |
Dave Hannah
|
|
|
Ross- ceiling grid Phone #: ###-#### ok to cover ceilings in locker roons
|
BLD-Other | 4/22/2009 | 4/22/2009 | 4/22/2009 | P | PASS |
Dave Hannah
|
|
|
Russ- ceiling grid Phone #: ###-####
|
BLD-Framing/Rough-in | 4/13/2009 | 4/13/2009 | 4/13/2009 | P | CANC |
Dave Hannah
|
|
|
russ - ceiling grid Phone #: ###-#### ok to cover
|
BLD-Other | 3/31/2009 | 4/1/2009 | 4/1/2009 | A | PART |
Dave Hannah
|
|
|
Russ Phone #: ###-#### ceiling hard in locker rooms ok to cover also ceililing grig second floor hallways ok to cover
|
BLD-Other | 3/23/2009 | 3/24/2009 | 3/24/2009 | A | PART |
Dave Hannah
|
|
|
Russ- ceiling grid Phone #: ###-#### ok to cover band rooms and ground level hallways
|
BLD-Other | 3/19/2009 | 3/19/2009 | 3/20/2009 | P | PART |
Dave Hannah
|
|
|
Russ Phone #: ###-#### ok to cover ceilings in halls on ground floor
|
BLD-Framing/Rough-in | 3/16/2009 | 3/17/2009 | 3/17/2009 | A | PART |
Dave Hannah
|
|
|
russ - ceiling grid in section C Phone #: ###-#### ok to cover ceiling
|
BLD-Framing/Rough-in | 3/5/2009 | 3/6/2009 | 3/6/2009 | P | PASS |
Dave Hannah
|
|
|
Denny Phone #: ###-####
|
BLD-Other | 3/4/2009 | 3/4/2009 | 3/4/2009 | P | PART |
Jim Storey
|
|
|
Russ Phone #: ###-#### area c ceilling grid ok fire wall not top of wall and pentrations not complet. no tile in this area.
|
BLD-Framing/Rough-in | 2/24/2009 | 2/24/2009 | 2/24/2009 | P | PART |
Dave Hannah
|
|
|
russ - ceiling grid in area F Phone #: ###-#### ok to cover ceiling
|
BLD-Framing/Rough-in | 2/19/2009 | 2/20/2009 | 2/20/2009 | A | PART |
Dave Hannah
|
|
|
russ - ceiling grid in area F Phone #: ###-#### ok to cover
|
BLD-Framing/Rough-in | 2/13/2009 | 2/17/2009 | 2/17/2009 | A | PART |
Dave Hannah
|
|
|
russ - ceiling grid in area G Phone #: ###-#### ok to cover ceiling
|
BLD-Other | 2/10/2009 | 2/10/2009 | 2/10/2009 | P | PART |
Dave Hannah
|
|
|
ceiling grid inspection//Russ ###-#### ok to cover ceiling area h
|
BLD-Other | 2/3/2009 | 2/3/2009 | 2/3/2009 | P | PART |
Dave Hannah
|
|
|
russ Note: ceiling grid Phone #: ###-#### ok to cover ceiling in class rooms ground floor of areas d and e
|
BLD-Energy code compliance | 1/29/2009 | 1/30/2009 | 1/30/2009 | A | PART |
Dave Hannah
|
|
|
suspended ceiling grid inspection please-Russ Phone #: ###-#### walls in band and choir room also insulation ok ok to cover
|
BLD-Framing/Rough-in | 1/29/2009 | 1/30/2009 | 1/30/2009 | A | PART |
Dave Hannah
|
|
|
suspended ceiling grid inspection please-Russ Phone #: ###-#### area d ground floor ok to cover
|
BLD-Energy code compliance | 1/22/2009 | 1/22/2009 | 1/23/2009 | P | PART |
Dave Hannah
|
|
|
russ Phone #: ###-#### need to check with arct on walls around cooling tower soffits in caf,ok hard lids in entry ok
|
BLD-Framing/Rough-in | 1/16/2009 | 1/20/2009 | 1/20/2009 | A | PART |
Dave Hannah
|
|
|
denny Phone #: ###-#### hard lids in locker rooms ok to cover. wallup on maz needs stiffeners to high ok to insulate walls in cooling tower
|
BLD-Energy code compliance | 12/30/2008 | 12/31/2008 | 12/31/2008 | A | PASS |
Dave Hannah
|
|
|
russ - admin area Phone #: ###-#### ok to cover
|
BLD-Framing/Rough-in | 12/29/2008 | 12/29/2008 | 12/29/2008 | P | PART |
Dave Hannah
|
|
|
russ Note: fat grid Phone #: ###-#### hard lid framing on mazzanin
|
BLD-Framing/Rough-in | 12/12/2008 | 12/15/2008 | 12/15/2008 | A | PART |
Dave Hannah
|
|
|
Russ Phone #: ###-#### ok to cover hard lid above stag and weight room also ok to insulate ext walls in adm area
|
BLD-Energy code compliance | 12/8/2008 | 12/8/2008 | 12/8/2008 | P | PART |
Dave Hannah
|
|
|
russ Phone #: ###-#### ok to cover libary
|
BLD-Framing/Rough-in | 12/3/2008 | 12/4/2008 | 12/5/2008 | A | PART |
Dave Hannah
|
|
|
russ Phone #: ###-#### ok to insulate ext walls in libary
|
BLD-Framing/Rough-in | 11/24/2008 | 11/25/2008 | 11/25/2008 | A | PART |
Jim Sly
|
|
|
russ Note: fire lids Phone #: ###-#### OK to cover ceilings at Bandroom, Chior room, and Wrestling room.
|
BLD-Framing/Rough-in | 11/19/2008 | 11/19/2008 | 11/19/2008 | P | PART |
Dave Hannah
|
|
|
russ Phone #: ###-#### 1hr hard lid admen area ok to cover
|
BLD-Framing/Rough-in | 11/10/2008 | 11/10/2008 | 11/10/2008 | P | PART |
Dave Hannah
|
|
|
Russ- Kitchen and mechanial room Phone #: ###-#### hard lid ceilings ok to cover
|
BLD-Energy code compliance | 11/10/2008 | 11/10/2008 | 11/10/2008 | P | PART |
Dave Hannah
|
|
|
Russ- areas G & H Phone #: ###-#### ok to cover ext walls second floor
|
BLD-Framing/Rough-in | 10/28/2008 | 10/29/2008 | 10/29/2008 | A | PART |
Dave Hannah
|
|
|
russ Phone #: ###-#### areas g and h ok to insulate
|
BLD-Energy code compliance | 10/24/2008 | 10/27/2008 | 10/27/2008 | A | PART |
Dave Hannah
|
|
|
russ Phone #: ###-#### ok to cover walls area d and e and ok to cover ceiling area f
|
BLD-Concrete | 10/20/2008 | 10/21/2008 | 10/21/2008 | A | PART |
Dave Hannah
|
|
|
russ Note: pouring concrete 11:00 am Phone #: ###-####
|
BLD-Framing/Rough-in | 9/25/2008 | 9/26/2008 | 9/26/2008 | A | PART |
Mike Jordan
|
|
|
RUSS NOTE: 1ST FLOOR CLASSROOM Phone #: ###-####. Interior steel stud framed walls in areas E and D, 1st floor. ok to insul. ardlids in restrooms ok. STILL NEED TO VERIFY TRHU AND MEMBRANE PENETRATIONS AT 2HR WALL.
|
BLD-Concrete | 9/22/2008 | 9/22/2008 | 9/23/2008 | P | PART |
Dave Hannah
|
|
|
russ Phone #: ###-####
|
BLD-Concrete | 9/17/2008 | 9/18/2008 | 9/18/2008 | A | PART |
Dave Hannah
|
|
|
russ Note: pouring at noon Phone #: ###-####
|
BLD-Concrete | 9/4/2008 | 9/4/2008 | 9/4/2008 | P | PART |
Dave Hannah
|
|
|
Russ Phone #: ###-####
|
BLD-Concrete | 8/14/2008 | 8/15/2008 | 8/15/2008 | A | PART |
Dave Hannah
|
|
|
russ Phone #: ###-#### elev deck ok to place concrete
|
BLD-Concrete | 7/25/2008 | 7/25/2008 | 7/25/2008 | P | NR |
Tom Arcoraci
|
|
|
russ - pouring at 2:00 Phone #: ###-#### wip ok
|
BLD-Concrete | 7/15/2008 | 7/15/2008 | 7/16/2008 | P | PART |
Mike Jordan
|
|
|
russ Phone #: ###-####. 2nd floor pan deck, area E.
|
BLD-Concrete | 6/24/2008 | 6/24/2008 | 6/25/2008 | P | PART |
Dave Hannah
|
|
|
denny - pan deck - rebar Phone #: ###-####ok to place after mti oks
|
BLD-Concrete | 6/11/2008 | 6/11/2008 | 6/11/2008 | P | PART |
Dave Hannah
|
|
|
russ - pouring at 2:00 Phone #: ###-#### beams ok to pour
|
Override - Parcel Holds | 6/11/2008 | 1/1/1900 | 6/11/2008 | | |
|
|
|
concrete insp
|
BLD-Concrete | 6/9/2008 | 6/9/2008 | 6/9/2008 | P | PASS |
Dave Hannah
|
|
|
russ Phone #: ###-#### ok to place elev slab
|
Override - Parcel Holds | 6/9/2008 | 1/1/1900 | 6/9/2008 | | |
|
|
|
concrete
|
BLD-Concrete | 5/23/2008 | 5/23/2008 | 5/23/2008 | P | PART |
Tom Arcoraci
|
|
|
russ - pouring at 1:00 Phone #: ###-#### mti on site
|
Override - Parcel Holds | 5/23/2008 | 1/1/1900 | 5/23/2008 | | |
|
|
|
conrete only
|
CHANGE STATUS TO (ISS) | | | 5/13/2008 | | |
|
|
|
plan mod-- already issued
|
(F) Reprint permit | | | 5/13/2008 | | |
|
|
|
|
(F) Reprint permit | | | 5/13/2008 | | |
|
|
|
|
Override - Parcel Holds | | | 5/9/2008 | | |
|
|
|
|
Permit Ready to Issue | | | 5/9/2008 | | |
|
|
|
|
Telephone call | | | 4/28/2008 | | |
|
|
|
left mess for beniton const at ###-#### that permit is ready
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/18/2008 | | DONE |
|
|
|
Plan Modification
|
Plan assigned to (JCM) | 4/15/2008 | | 4/18/2008 | | PASS |
John Menard
|
|
|
4/18/2008 10:40:40 JCM - activity updated through activity BLDA022 from case BLD07-01910.
|
Plan Reviewer's activity | | | 4/18/2008 | | PASS |
John Menard
|
|
|
Reviewed and approved plan modification to delete smoke/fire dampers from penetrations of storage rooms. This building was approved with nonseparated uses and the storage areas were reveiwed as S Occupancies I.L.O. incidental use areas. JCM
|
Routing - PLAN CHECK | 4/15/2008 | | 4/18/2008 | | PASS |
John Menard
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/18/2008 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/18/2008 | | DONE |
|
|
|
|
Telephone call | | | 4/18/2008 | | DONE |
|
|
|
left vm for dan russell at ###-#### - permit ready and fees given
|
Override - Parcel Holds | | | 4/18/2008 | | |
|
|
|
|
Permit Ready to Issue | | | 4/18/2008 | | DONE |
|
|
|
|
BLD-Concrete | 4/15/2008 | 4/16/2008 | 4/16/2008 | A | PART |
Dave Hannah
|
|
|
russ - stem walls Phone #: ###-####
|
Plan Modification Accepted | | | 4/15/2008 | | |
|
|
|
Plan modification accepted for Bld07-01910 (East Junior High School) to delete fire/smoke dampers located at duct penetrations of incidental use storage areas. Thsi action is the result of recent code interpretation discussion between the mechanial engineer on the project and several Boise Cit entities including the Building Official, Mechanical Plan Reviewer, and Mechanical Inspector. All have reviewed the applicable code sections and have given verbal confirmation that the dampers shown on the original drawings are not required; Submitted on sheets M1.1A, M1.1B, M1.1D, M1.1E, M1.2F, M1.2G; routed to John Menard
|
BLD-Concrete | 4/8/2008 | 4/8/2008 | 4/8/2008 | P | PART |
Dave Hannah
|
|
|
russ -pouring at 3:00 Phone #: ###-####
|
BLD-Concrete | 4/1/2008 | 4/2/2008 | 4/2/2008 | A | PART |
Dave Hannah
|
|
|
russ Phone #: ###-####
|
BLD-Concrete | 3/26/2008 | 3/27/2008 | 3/27/2008 | P | PASS |
Jim Storey
|
|
|
russ - pourng at 2:00 Phone #: ###-####placed with si observation pending reports.
|
BLD-Concrete | 3/20/2008 | 3/20/2008 | 3/20/2008 | P | PART |
Dave Hannah
|
|
|
russ - pouring at 2:00 Phone #: ###-####
|
BLD-Concrete | 3/18/2008 | 3/18/2008 | 3/18/2008 | P | PART |
Dave Hannah
|
|
|
russ Phone #: ###-####
|
BLD-Concrete | 3/13/2008 | 3/14/2008 | 3/14/2008 | A | PART |
Dave Hannah
|
|
|
Russ, ppouring concrete @ 9:00; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
BLD-Concrete | 3/11/2008 | 3/11/2008 | 3/12/2008 | P | PART |
Dave Hannah
|
|
|
russ - pouring at 2:00 Phone #: ###-#### int ftgs area e mti on site did rebar inspection and are testing concrete
|
BLD-Concrete | 2/27/2008 | 2/27/2008 | 2/27/2008 | P | PART |
Dave Hannah
|
|
|
russ - pouring at 2:30 Phone #: ###-####
|
BLD-Concrete | 2/20/2008 | 2/20/2008 | 2/20/2008 | P | PART |
Dave Hannah
|
|
|
russ - pouring at 2:00 Phone #: ###-####
|
BLD-Other | 2/13/2008 | 2/14/2008 | 2/14/2008 | A | PART |
Dave Hannah
|
|
|
denny Note: pouring concrete at 2:00 - stem wall inspection Phone #: ###-####
|
BLD-Footing | 2/12/2008 | 2/12/2008 | 2/12/2008 | P | PASS |
Jim Storey
|
|
|
Russ-pouring at 2 this afternoon Phone #: ###-#### ft at grid lines 1/lmn ok rebar si on site for testing.
|
BLD-Concrete | 2/7/2008 | 2/8/2008 | 2/8/2008 | A | PART |
Dave Hannah
|
|
|
russ Phone #: ###-####
|
BLD-Concrete | 2/4/2008 | 2/5/2008 | 2/5/2008 | A | PART |
Mike Jordan
|
|
|
Russ Please call first , late AM if possible Phone #: ###-####. stemwall at area E, south and east sides.
|
BLD-Concrete | 2/4/2008 | 2/4/2008 | 2/4/2008 | P | CANC |
Jim Sly
|
|
|
russ - stem wall - pour time is 2:00 pm Phone #: ###-#### Cancelled....til Tuesday
|
BLD-Footing | 1/29/2008 | 1/30/2008 | 1/31/2008 | A | PART |
Dave Hannah
|
|
|
russ Note: late morning please - pouring footing at 2:00 pm Phone #: ###-#### second pour on ftgs mti on site inspecting rebar and testing concrete as per spec inspection
|
BLD-Footing | 1/22/2008 | 1/23/2008 | 1/23/2008 | A | PART |
Mike Jordan
|
|
|
russ Phone #: ###-####. East perimeter footing, area E. Noted special inspector was on site. Contractor is following cold weather copnc. const. requirements.
|
(F) Reprint permit | | | 11/20/2007 | | |
|
|
|
|
Telephone call | | | 11/19/2007 | | DONE |
|
|
|
talked to jennifer bresee with the achd said schools were exempt for highway impact fees.- found out from Darrin Carroll with the achd that there were issues to be resolved/talked to Russ Rogers (GC) that picked up the permit & will call Darrin to get it resolved....11/19/07/mls--any questions call darrin
|
Issue PAID IN FULL permit | | | 11/19/2007 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/9/2007 | | DONE |
|
|
|
|
Telephone call | | | 11/9/2007 | | DONE |
|
|
|
left vm for scott henson at ###-#### - permit ready and fees given - also need ACHD receipt
|
Permit Ready to Issue | | | 11/9/2007 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/8/2007 | | 11/9/2007 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/9/2007 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 7/23/2007 | | 11/9/2007 | | PASS |
|
|
|
11/9/2007 10:02:27 JCM - activity updated through activity BLDA022 from case BLD07-01910.
|
Routing - PUBLIC WORKS | 11/8/2007 | | 11/8/2007 | | PASS |
|
|
|
|
Plan resubmittals received | | | 11/8/2007 | | |
|
|
|
Received three copies of pages C3.01, C3.02, C3.10, C4.01, C4.02; put with plans
|
Routing PW Drainage | 11/8/2007 | | 11/8/2007 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 11/8/2007 | | 11/8/2007 | | PASS |
|
|
|
Parcel is larger than 5 acres
|
Routing - PLAN CHECK | 10/11/2007 | | 11/8/2007 | | PASS |
|
|
|
|
Plan resubmittals received | | | 11/7/2007 | | |
|
|
|
Received two copies of pages C3.01, C3.02, C3.10, C4.01, C4.02, L1.00, L1.01, L1.02; inserted into plans by arch. rep. and plans taken back to John Menard (told rep need 3 extra revised civil sheet sets for Brian Murphy, he said he will get those to us)
|
Plan resubmittals received | | | 10/25/2007 | | |
|
|
|
Received 1 cover transmittal from Action Couriers; 1 cover transmittal from The Land Group; 1 response letter dated 10/24/07 from Jason Densmer (2 pgs), 1 copy of Strata Geotech letter/report dated 10/19/07; 1 copy of an updated drainage report dated 10/18/07; 3 copies of the following sheets-C3.02, C4.01, C4.02. Called The Land Group and left voice message for Jason that someone from his office needs to come down and insert these into the plans///10/25/07 @ 12:29pm BAS//On 10/26/07 Jim Wylie called me and said that these documents are for pre-approval by him before being inserted into our 2 sets so he came and got them///10/26/07 @ 9:30am BAS
|
Routing PW Sewer Rating | | | 10/11/2007 | | PASS |
|
|
|
|
Routing PW Drainage | 10/11/2007 | | 10/11/2007 | | FAIL |
|
|
|
Drainage plan not in compliance with City standards.
|
Routing - PUBLIC WORKS | 10/5/2007 | | 10/11/2007 | | FAIL |
|
|
|
|
Plan resubmittals received | | | 10/5/2007 | | |
|
|
|
Received 1 cover transmittal, 2 copies of sheets C2.05, C3.00, C3.01, C3.02, C3.10, C4.00, C4.01, C4.02, C6-0 to C6.4, C7-1to C7-2, C8-1 to C8--2 inserted into plans by Architects office and taken back to John Menard///10/5/07 @ 8:27am BAS
|
Routing - PLAN CHECK | 9/24/2007 | | 10/5/2007 | | |
|
|
|
|
Plan Reviewer's activity | | | 9/25/2007 | | PASS |
|
|
|
Reviewed and approved final nonstructural revisions. JCM
|
Routing - FIRE | 9/17/2007 | | 9/24/2007 | | PASS |
|
|
|
Attached updated review comments to plans.
|
Plan resubmittals received | | | 9/18/2007 | | |
|
|
|
Received response letter and two copies of page A2.1F, M1.1C; inserted by arch. rep; Issue set taken back to fire review and office copy to John Menard
|
Plan resubmittals requested | | | 9/17/2007 | | DONE |
|
|
|
E-mailed the architect a request for additional revisions. JCM
|
Routing - PLAN CHECK | 9/12/2007 | | 9/17/2007 | | FAIL |
|
|
|
|
Plan Reviewer's activity | | | 9/17/2007 | | PASS |
|
|
|
Reviewed and approved structural revisions.
|
Plan Reviewer's activity | | | 9/17/2007 | | FAIL |
|
|
|
Reviewed nonstructural revisions and not all requested revisions were adequately addressed.
|
Plan resubmittals received | | | 9/14/2007 | | |
|
|
|
Received new bld permit application and COV for the storage building (see Bld07-02483); Received two copies of response letter, spec. sheet, structural calcs, and pages C1.01, FP1.1, M1.1C, A2.2, A7.4, A8.11, A8.12, A2,05, A4.01, A2.1D, A2.1E, A2.1G, A2.1H, A4.03, S0.1, S2.1F, S2.2A, S2.2F, S7.14, S7.4; inserted by architect
|
1st review completed | | | 9/12/2007 | | FAIL |
|
|
|
|
Routing - FIRE | 9/7/2007 | | 9/12/2007 | | FAIL |
|
|
|
Faxed and emailed resubmittal items to architect.
|
Routing - PLAN CHECK | 8/31/2007 | | 9/10/2007 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 9/10/2007 | | DONE |
|
|
|
E-mailed the architect a copy of the plan review requesting revisions. JCM
|
Routing - PUBLIC WORKS | 8/27/2007 | | 8/31/2007 | | FAIL |
|
|
|
|
Routing PW Street Lights | 8/27/2007 | | 8/31/2007 | | PASS |
|
|
|
|
Routing PW Drainage | 8/27/2007 | | 8/31/2007 | | FAIL |
|
|
|
|
Routing PW Sewer Rating | 8/27/2007 | | 8/31/2007 | | PASS |
|
|
|
|
Routing PW Solid Waste | 8/27/2007 | | 8/31/2007 | | PASS |
|
|
|
Revised plans ok (per CC). Warning signs and enhanced striping on crosswalk.
|
Plan resubmittals received | | | 8/28/2007 | | |
|
|
|
Received 1 cover transmittal, 1 pg letter from Dan Russell (EIT), 4 copies of P1.0A and taken to John Menard///8/28/07 @ 4:50pm BAS
|
Routing PW Sewer Design | 8/27/2007 | | 8/28/2007 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 8/17/2007 | | 8/27/2007 | | |
|
|
|
John Menard
|
Routing PW Street Lights | 7/26/2007 | | 8/27/2007 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 8/23/2007 | | DONE |
|
|
|
E-mailed the architect a copy of the structural review requesting revisions. JCM
|
Routing Off Site - STRUCTURAL | 7/25/2007 | | 8/20/2007 | | FAIL |
|
|
|
Received comment list from the consulting structural engineer requesting revisions.
|
Routing - PLANNING | 8/15/2007 | | 8/17/2007 | | PASS |
|
|
|
CUP07-00044-Angela Wood reviewed plans.
|
Routing - PLUMBING | 8/8/2007 | | 8/15/2007 | | PASS |
|
|
|
3" waste to the P-13 and P-14 page P-1.0a
|
Routing - Erosion and Sediment | 8/8/2007 | | 8/8/2007 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 7/26/2007 | | 8/8/2007 | | FAIL |
|
|
|
|
Routing PW Environmental | 7/26/2007 | | 8/8/2007 | | PASS |
|
|
|
1500 gallon GI noted for kitchen drainage
|
Routing PW Sewer Rating | 8/7/2007 | | 8/7/2007 | | FAIL |
|
|
|
|
Routing PW Sewer Design | 7/26/2007 | | 8/7/2007 | | FAIL |
|
|
|
|
Routing PW Solid Waste | 7/26/2007 | | 8/7/2007 | | PASS |
|
|
|
Revised Plans are approved.
|
Routing PW Drainage | 7/26/2007 | | 7/30/2007 | | FAIL |
|
|
|
|
Routing - PLANNING Land Div | 7/25/2007 | | 7/26/2007 | | FAIL |
|
|
|
|
Telephone call | | | 7/25/2007 | | DONE |
|
|
|
called Action Couriers for pick to off site engineering
|
Plans ACCEPTED BY PLAN TECH | | | 7/25/2007 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/25/2007 | | |
|
|
|
|
Application received | | | 7/23/2007 | | |
|
|
|
|
Pending Assignment by MYS | 7/23/2007 | | 7/23/2007 | | DONE |
|
|
|
7/23/2007 13:57:20 JCM - activity updated through activity BLDA166 from case BLD07-01910.
|
Routing PW Drainage | 8/31/2007 | | | | FAIL |
|
|
|
Drainage plan and supporting documentation are not complete.
|