Second Notice BLD | 3/4/2009 | 3/4/2009 | 3/13/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
First Notice has not been responded to.
|
First Notice | | 1/30/2009 | 3/4/2009 | | DONE |
|
|
|
|
BLD-Final | 1/29/2009 | 1/30/2009 | 1/30/2009 | P | PASS |
Tom Arcoraci
|
|
|
roberto Phone #: ###-####
|
FIRE-Final Inspection | 1/30/2009 | 1/30/2009 | 1/30/2009 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
FIRE-Final Inspection | 1/29/2009 | 1/30/2009 | 1/30/2009 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. The builder lowered the rack shelving to provide the 24" minimum clearance.
|
Permanent Occupancy | | | 1/30/2009 | | DONE |
Barbara Stitt
|
|
|
OK per Ron Hill for no Central District Health signature
|
BLD-Other | 12/22/2008 | 12/22/2008 | 12/22/2008 | P | PASS |
Tom Arcoraci
|
|
|
robert Note: drob ceiling Phone #: ###-####
|
BLD-Framing/Rough-in | 11/24/2008 | 11/25/2008 | 11/25/2008 | A | PASS |
Tom Arcoraci
|
|
|
roberto Phone #: ###-####
|
BLD-Footing | 11/18/2008 | 11/19/2008 | 11/19/2008 | A | PASS |
Tom Arcoraci
|
|
|
Roberto Phone #: ###-####
|
BLD-Wall cover | 11/19/2008 | 11/19/2008 | 11/19/2008 | P | PASS |
Tom Arcoraci
|
|
|
Roberto Phone #: ###-#### 2 hr wall ok wip
|
BLD-Framing/Rough-in | 11/13/2008 | 11/14/2008 | 11/14/2008 | A | PART |
Tom Arcoraci
|
|
|
ROBERTO Phone #: ###-#### int ok for cover ext wall requires 2 layers 5/8 x both sides
|
Override - Parcel Holds | | | 11/13/2008 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 11/13/2008 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/12/2008 | | DONE |
|
|
|
|
Telephone call | | | 11/12/2008 | | DONE |
|
|
|
t/c w james at ###-#### - permit ready and fees given
|
Override - Parcel Holds | | | 11/12/2008 | | |
|
|
|
|
Permit Ready to Issue | | | 11/12/2008 | | DONE |
|
|
|
|
Plan assigned to (R_H) | 11/6/2008 | 11/6/2008 | 11/10/2008 | | PASS |
|
|
|
11/10/2008 13:47:09 RMH - activity updated through activity BLDA022 from case BLD07-01941.
|
Case Summary (BLD) | | | 11/10/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 11/10/2008 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/10/2008 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 11/6/2008 | | 11/7/2008 | | PASS |
Beverly Hall
|
|
|
|
BLD-Footing | 11/5/2008 | 11/6/2008 | 11/6/2008 | A | PASS |
Tom Arcoraci
|
|
|
roberto - rebar Phone #: ###-####
|
Plan Modification Accepted | | | 11/6/2008 | | DONE |
Barbara Stitt
|
|
|
Plan modification accepted for adding 2 sinks and a sandwich counter area. Submitted on sheet A3 and routed to public works and Ron Hill per Ron///11-6-08 BAS
|
BLD-Footing | 10/27/2008 | 10/27/2008 | 10/27/2008 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-####
|
BLD-Aging Inspection | 7/22/2008 | 7/22/2008 | 7/22/2008 | | NR |
Tom Arcoraci
|
|
|
no calls for insp
|
BLD-Aging Inspection | 4/17/2008 | 4/17/2008 | 4/22/2008 | | NR |
Tom Arcoraci
|
|
|
|
Issue PAID IN FULL permit | | | 1/17/2008 | | DONE |
|
|
|
|
CHANGE ISSUED DATE | | | 1/17/2008 | | DONE |
Rita DeYoung
|
|
|
|
Ready Permit EXTENDED | | | 1/8/2008 | | |
|
|
|
|
Print Occupancy Form | | | 12/21/2007 | | DONE |
|
|
|
|
Telephone call | | | 12/21/2007 | | DONE |
|
|
|
left vm for james gipson at ###-#### - permit ready and fees given - also need gc name and rce#
|
Permit Ready to Issue | | | 12/21/2007 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/20/2007 | | 12/20/2007 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/20/2007 | | DONE |
|
|
|
|
Routing - PLUMBING | 8/9/2007 | | 12/20/2007 | | PASS |
|
|
|
|
Plan assigned to (R_H) | 9/18/2007 | | 12/20/2007 | | PASS |
|
|
|
12/20/2007 13:13:55 RMH - activity updated through activity BLDA022 from case BLD07-01941.
|
Plan resubmittals received | | | 12/18/2007 | | DONE |
|
|
|
received 1 response , and 3 copies of sheets A2, A4 taken to Ron H.
|
Routing - PLAN CHECK | 9/24/2007 | | 12/13/2007 | | FAIL |
|
|
|
Faxed and mailed requirements to architect 12-13-07
|
Plan resubmittals received | | | 12/7/2007 | | |
|
|
|
received response letter, two copies of structural calculations, and three copies of A2, A3, A4, A5, P1.0, P1.1, P2.1; taken to Ron Hill
|
1st review completed | | | 9/24/2007 | | FAIL |
|
|
|
|
Routing - FIRE | 9/19/2007 | | 9/24/2007 | | PASS |
|
|
|
Attached IFC review comments to plans.
|
Routing - PLAN CHECK | 8/14/2007 | | 9/19/2007 | | FAIL |
|
|
|
Faxed and mailed requirements to the architect on 9/19/07
|
Plan resubmittals received | | | 9/19/2007 | | |
|
|
|
Received another set of sheets A2, P1.0, P1.1, P2.1 and took both sets to Ron Hill///9/19/07 @2:00pm BAS
|
Plan assigned to (CJW) | 8/7/2007 | | 9/18/2007 | | ---- |
|
|
|
Reassigned to Ron Hill by MSouthard on 9/18/2007.
|
Telephone call | | | 9/18/2007 | | DONE |
|
|
|
Called James Gipson office and left a message to ask again for a 2nd set of plans- sheets A2, P1.0, P1.1, P2.1///9/19/07 @ 1:35pm BAS
|
Plan resubmittals received | | | 9/11/2007 | | |
|
|
|
received 1 transmittal, and 1 copy of sheets A2,P1.0,P1.1,P2.1 taken to Carl W.
|
Plan resubmittals received | | | 9/6/2007 | | |
|
|
|
Received 1 cover transmital, 1 copy of sheets A2, P1.0, P1.1, P2.1
|
Telephone call | | | 9/6/2007 | | |
|
|
|
Called James Gipson and asked for a 2nd set of plans- sheets A2, P1.0, P1.1, P2.1///9/6/07 @ 1:43pm BAS
|
Plan resubmittals received | | | 8/15/2007 | | |
|
|
|
Received 1 of the following sheets-A2, P1.0, P1.1, P2.1, E1.1, E2.1, E3.1, E3.2 and taken to Carl Westfall///8/15/07 @ 9:53am BAS
|
Routing - PLANNING | | | 8/14/2007 | | PASS |
|
|
|
Josh Wilson CZC07-00033
|
Routing - Erosion and Sediment | 8/8/2007 | | 8/9/2007 | | PASS |
|
|
|
No ESC permit required.
|
Routing PW Sewer Rating | 8/8/2007 | | 8/8/2007 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 8/7/2007 | | 8/8/2007 | | PASS |
|
|
|
|
Pending Assignment by MYS | 7/25/2007 | | 8/7/2007 | | DONE |
|
|
|
8/7/2007 15:28:26 MYS - activity updated through activity BLDA172 from case BLD07-01941.
|
Plans ACCEPTED BY PLAN TECH | | | 7/26/2007 | | |
|
|
|
|
Application received | | | 7/25/2007 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/25/2007 | | |
|
|
|
|
Routing - PLAN CHECK | 11/7/2008 | | | | |
|
|
|
Ron HIll
|