Case Summary (BLD) | | | 11/18/2008 | | DONE |
|
|
|
|
BLD-Final | 11/5/2008 | 11/5/2008 | 11/5/2008 | P | PASS |
Jim Storey
|
|
|
larry Phone #: ###-#### Note: please call access
|
DOC - Permit Finaled | 11/5/2008 | 11/5/2008 | 11/5/2008 | P | PASS |
Jim Storey
|
|
|
|
BLD-Energy code compliance | 6/4/2008 | 6/4/2008 | 6/5/2008 | P | PASS |
Dave Hannah
|
|
|
larry Phone #: ###-####
|
BLD-Framing/Rough-in | 5/23/2008 | 5/27/2008 | 5/27/2008 | A | PASS |
Tom Arcoraci
|
|
|
larry Phone #: ###-####
|
BLD-Framing/Rough-in | 5/6/2008 | 5/7/2008 | 5/7/2008 | A | NR |
Tom Arcoraci
|
|
|
larry Phone #: ###-####
|
BLD-Framing/Rough-in | 4/29/2008 | 4/29/2008 | 4/29/2008 | P | PART |
Jim Storey
|
|
|
larry Phone #: ###-#### conf oa soffit protection/ framing ok pending all ri of other trades
|
BLD-Framing/Rough-in | 4/28/2008 | 4/29/2008 | 4/28/2008 | A | CANC |
Jim Storey
|
|
|
shear nail--Larry Phone #: ###-#### - contractor called in and canceled inspection
|
BLD-Energy code compliance | 9/28/2007 | 10/1/2007 | 10/1/2007 | A | CANC |
Tom Arcoraci
|
|
|
Larry Glenn ###-####
|
BLD-Foundation | 8/30/2007 | 8/31/2007 | 8/31/2007 | A | PASS |
Jim Storey
|
|
|
Matt; Phone #: ###-#### Internet Inspection Request from: Hattie James
|
BLD-Footing | 8/28/2007 | 8/29/2007 | 8/29/2007 | P | PASS |
Mike Jordan
|
|
|
matt Phone #: ###-####
|
Issue PAID IN FULL permit | | | 8/27/2007 | | DONE |
|
|
|
|
Telephone call | | | 8/15/2007 | | DONE |
|
|
|
lft ms with wife? ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 8/15/2007 | | |
|
|
|
|
Plan assigned to (SRZ) | 8/8/2007 | 8/8/2007 | 8/14/2007 | | PASS |
|
|
|
8/14/2007 13:59:55 SRZ - activity updated through activity BLDA022 from case BLD07-01953.
|
Routing - PLAN CHECK | 8/8/2007 | | 8/14/2007 | | PASS |
|
|
|
|
Plan resubmittals received | | | 8/14/2007 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 8/14/2007 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/14/2007 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/14/2007 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 8/8/2007 | | |
|
|
|
|
Pending Assignment by SRZ | 7/26/2007 | | 8/8/2007 | | DONE |
|
|
|
8/8/2007 15:58:13 SRZ - activity updated through activity BLDA160 from case BLD07-01953.
|
Routing - PLAN CHECK | 7/31/2007 | | 8/8/2007 | | FAIL |
|
|
|
Resubmittals required to complete Plan Review. Correction List: One hour Fire resistave construction required on walls closer then three feet to property line. No projections allowed closer than 2ft. to property line. One hour Fire resistave construction required to be tested assembly or Min. Two Layers 5/8" Type X Gypsum board. All beams need to be called out on plans. Crawl and Attic Access need to be called out. Tempered windows need to be called out on plans. Handrails per code. Roof ventilation called out. Res-check needs to be corrected. (SRZ)
|
Routing - PUBLIC WORKS | 7/30/2007 | | 7/31/2007 | | PASS |
|
|
|
|
Routing - PLANNING | 7/26/2007 | | 7/30/2007 | | PASS |
|
|
|
Routed to Josh Wilson (DRH07-00322)
|
Routing - Addressing | 7/26/2007 | | 7/26/2007 | | PASS |
|
|
|
|
Application received | | | 7/26/2007 | | |
|
|
|
|