Case Summary (BLD) | | | 9/30/2008 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 9/26/2008 | | DONE |
|
|
|
|
BLD-Final | 4/14/2008 | 4/14/2008 | 4/14/2008 | P | PASS |
Jim Storey
|
|
|
larry Phone #: ###-####
|
DOC - Permit Finaled | 4/14/2008 | 4/14/2008 | 4/14/2008 | P | PASS |
Jim Storey
|
|
|
|
BLD-Other | 10/17/2007 | 10/19/2007 | 10/19/2007 | A | PASS |
Jim Storey
|
|
|
larry Note: sofett Phone #: ###-####
|
BLD-Framing/Rough-in | 10/15/2007 | 10/15/2007 | 10/15/2007 | P | PASS |
Jim Storey
|
|
|
larry Phone #: ###-#### interior insulation insp, ok,
|
BLD-Framing/Rough-in | 10/9/2007 | 10/10/2007 | 10/10/2007 | A | PASS |
Jim Storey
|
|
|
larry Phone #: ###-#### pending mech sch for am
|
BLD-Framing/Rough-in | 10/2/2007 | 10/3/2007 | 10/3/2007 | P | PASS |
Jim Storey
|
|
|
GLENN Phone #: ###-####eav protection ok
|
BLD-Foundation | 8/30/2007 | 8/31/2007 | 8/31/2007 | A | PASS |
Jim Storey
|
|
|
Matt; Phone #: ###-#### Internet Inspection Request from: Hattie James
|
BLD-Footing | 8/28/2007 | 8/29/2007 | 8/29/2007 | P | PASS |
Mike Jordan
|
|
|
matt Phone #: ###-####
|
Issue PAID IN FULL permit | | | 8/27/2007 | | |
|
|
|
|
Telephone call | | | 8/15/2007 | | DONE |
|
|
|
lft ms with wife? ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 8/15/2007 | | DONE |
|
|
|
|
Plan assigned to (SRZ) | 8/8/2007 | 8/8/2007 | 8/14/2007 | | PASS |
|
|
|
8/14/2007 13:24:57 SRZ - activity updated through activity BLDA022 from case BLD07-01954.
|
Routing - PLAN CHECK | 8/8/2007 | | 8/14/2007 | | PASS |
|
|
|
|
Plan resubmittals received | | | 8/14/2007 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 8/14/2007 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/14/2007 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/14/2007 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 7/30/2007 | | 8/14/2007 | | PASS |
|
|
|
|
Pending Assignment by SRZ | 7/26/2007 | | 8/8/2007 | | DONE |
|
|
|
8/8/2007 15:47:36 SRZ - activity updated through activity BLDA160 from case BLD07-01954.
|
Routing - PLAN CHECK | 7/31/2007 | | 8/8/2007 | | FAIL |
|
|
|
Resubmittals required to complete Plan Review. Correction List: One hour Fire resistave construction required on walls closer then three feet to property line. One hour Fire resistave construction required to be tested assembly or Min. Two Layers 5/8" Type X Gypsum board. All beams need to be called out on plans. Crawl and Attic Access need to be called out. Tempered windows need to be called out on plans. Handrails per code. Roof ventilation called out. Res-check needs to be corrected. Footing sizes called out on Foundation, No openings closer than 3ft. to property line (Fireplace), 3ft. min. hallways for emergency egress.(SRZ)
|
Routing - PLANNING | 7/26/2007 | | 7/30/2007 | | PASS |
|
|
|
Routed to Josh Wilson (DRH07-00323)
|
Routing - Addressing | 7/26/2007 | | 7/26/2007 | | PASS |
|
|
|
|
Application received | | | 7/26/2007 | | |
|
|
|
|