Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD07-01957
StatusFinaled
Name KYLE MASSIE
Site Address 11345 W EXECUTIVE DR
Project Name 
Customer Number 
ePlanReviewNo
Description
(MERCHANTS MOVING & STORAGE) There is an upgrade agreement on file, established under BLD05-00127, for installation of a fire suppression system in the areas noted on the attached upgrade agreement plan as 'Warehouse #1' and 'North Loading Dock', immediately behind the main office. FIR07-00374 has been issued by the fire department for installation of the required sprinkler system and this permit scope will address the construction of a 135 sq. ft. addition at the northwest corner of the main office building for use as a fire sprinkler riser room. The 'Office" & "Maintenance Shop" will NOT be sprinklered. These two areas, as designated on attached upgrade agreement plan, are separated from adjoining buildings by an existing 2-hour area separation wall. As the 'Office' area is not being sprinklered, the 2-hour area separation wall shall be reviewed for code compliance for protected openings and penetrations (see notes on plans). Due to proximity to property line, < 5', the west wall of the fire riser room addition is fire-rated with a parapet and without openings for that portion running parallel to the property line, per the approved plans. Scope of work includes concrete foundation and slab; wall & roof structure framing & covering; brick veneer and Cedar siding; electrical, plumbing, sprinkler & alarm systems; and new metal roof covering on existing office roof area to tie into the new. CZC07-00154 drs. (RESUBMITTAL 2/19/2008) approved for construction of riser room in interior of existing building.All other code provisions regulating 2 hour wall seperating office and warehouse are applicable. No new square footage to existing structure. BA 325
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD9/22/20089/22/20081/29/2009 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Expiration Notice1/18/20082/1/20081/29/2009 DONE
DetailsCathy Brown
Second Notice BLD8/11/20088/11/20089/22/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice5/19/20085/19/20088/11/2008 DONE
DetailsMike Jordan
BLD-Final5/19/20085/19/20085/19/2008PPASS
DetailsMike Jordan
kyle Phone #: ###-####
DOC - Permit Finaled5/19/20085/19/20085/19/2008PPASS
DetailsMike Jordan
FIRE-Final Inspection5/14/20085/15/20085/15/2008APASS
DetailsTroy Cobbley
life safety passed.
BLD-Final5/14/20085/14/20085/14/2008PNR
DetailsMike Jordan
Kyle Phone #: ###-####. Life/safety insp. failed.
FIRE-Final Inspection5/13/20085/14/20085/14/2008AFAIL
DetailsTroy Cobbley
There were no approved plans on site. Also the three existing exit signs were inoperative and need repaired or replaced.
FIRE-Final Inspection5/12/20085/13/20085/13/2008AFAIL
DetailsTroy Cobbley
There were no approved drawings/notes on site so no inspection was done.
BLD-Final5/5/20085/6/20085/6/2008ANR
DetailsMike Jordan
kyle Phone #: ###-####. still needs life/safety final and verify elec. and plumbing finals.
Inspection Record Card- Bld  5/6/2008 DONE
BLD-Framing/Rough-in4/2/20084/2/20084/2/2008PPASS
DetailsMike Jordan
kyle. Framing for riser rom. 1hr const.
Telephone call  3/25/2008  
left mess for kyle massie at ###-#### that permit is ready & need to get gc & r/p
Issue PAID IN FULL permit  3/25/2008 DONE
Telephone call  3/17/2008 PART
DetailsBob Archibald
Contacted Chad to purchase permit.
Inspection Record Card- Bld  3/4/2008 DONE
Telephone call  3/4/2008  
called Chad (arch) and left message permit is ready and fee, need RP, GC, RCE
Permit Ready to Issue  3/4/2008 DONE
Plan resubmittals received  3/3/2008 DONE
DetailsScott Arellano
Received response letter from architect stating the fire pump will no longer be installed, (reference FIR07-00929); and the fire sprinkler system main control valve will be installed via remote PIV. Rated seperation and direct exterior access from the fire srinkler riser room will not be required with in lieu of new valving arrangement and deletion of fire pump.
Routing - FIRE3/3/2008 3/3/2008 PASS
DetailsScott Arellano
Attached IFC comments to plans
Routing - FIRE2/26/2008 2/26/2008 FAIL
DetailsScott Arellano
Routed to Scott Arellano per Sam Rogers direction///2-26-08 BAS.
Updated resubmittal items faxed and emailed to architect. *SJA*
CHANGE STATUS TO (REV)  2/26/2008  
Per Sam Rogers plans taken to Scott Arellano
Plan Reviewer's activity  2/20/2008 PASS
DetailsBob Archibald
Revised plan sheet A2-1approved for construction of riser room inside building rather than being an addition to the exterior of the building. Remaining code provisions on 2 hour wall seperating office and warehouse area reguired. Plans returned to permit desk for issuance.
Inspection Record Card- Bld  2/20/2008  
Case Summary (BLD)  2/20/2008 DONE
Telephone call  2/20/2008 DONE
Called Chad Slichter and told him permit is ready after revised plans submitted on 2/19/08 and fee due
Plan resubmittals received  2/19/2008  
Received two copies of sheet A2.1 and letter from architect; taken by Bob A.
Telephone call  2/13/2008 PART
DetailsBob Archibald
Conference with architect...resubmittals to be provided 2/19/08.
Telephone call  2/5/2008 PART
DetailsBob Archibald
Call with architect, Chad Slichter, he will provide revised drawings no later than 2/13/08. Scope of work will be modified to exclude riser room and leave improvements to the two hour wall between office and warehouse.
Extend Review Timeline  2/5/2008 PART
DetailsBob Archibald
Extension of permit expiration pending resubmittals by 2/13/08.
Meeting  2/4/2008 PART
DetailsBob Archibald
Site visit with owner, phone conference with fire sprinkler contractor and owner.
Telephone call  1/18/2008  
left message w david for chad slichter at ###-#### - that permit has expired & can apply for an extension
Plan assigned to (DRS)8/7/2007 10/3/2007 PASS
10/3/2007 07:57:01 DRS - activity updated through activity BLDA022 from case BLD07-01957.
Routing - PLAN CHECK10/1/2007 10/3/2007 PASS
Plans approved as noted on and all attched plan review conditions / comments of all reviewing agencies. Plans to permit desk to issue.
PLANS/APPL TAKEN TO FRONT DESK  10/3/2007 PASS
Inspection Record Card- Bld  10/3/2007 DONE
Telephone call  10/3/2007 DONE
left message w david for chad slichter at ###-#### - permit ready and fees given - also need gc name, rce# and rp name
Permit Ready to Issue  10/3/2007 DONE
Routing - FIRE9/26/2007 10/1/2007 PASS
Attached updated IFC review comments to plans.
Routing - PLAN CHECK9/16/2007 9/26/2007 PEND
Routing back to fire code analyst.
Plan resubmittals received  9/25/2007  
Received response letter and two copies of pages A2.1, M1.0; taken to Dan Stuart
Routing - FIRE9/11/2007 9/16/2007 FAIL
Emailee and faxed resubmittal items to architect. Attached fire code review comments to plans.
1st review completed  9/16/2007 FAIL
Routing - PLAN CHECK8/9/2007 9/11/2007 PEND
Resubmittals are NOT required. Code clarification requirements have been red-lined on the plans and clarifications are attached as part of the plan review conditions. Routing plans to fire code analyst.
Plan resubmittals received  8/22/2007  
1 cover sheet - 1 8 1/2x11 site plan - 2 copies of sheet no. A1.0 - taken to dan stuart
Routing - PLANNING8/9/2007 8/9/2007 PASS
Applicant should submit a site plan showing that all of the Conditions of Approval attached to CZC07-00154 have been met.
Routing - Erosion and Sediment8/8/2007 8/9/2007 PASS
ESC waiver request approved with attached conditions.
Routing PW Sewer Rating8/8/2007 8/8/2007 PASS
Routing - PUBLIC WORKS8/7/2007 8/8/2007 PASS
Pending Assignment by MYS7/27/2007 8/7/2007 DONE
8/7/2007 15:56:09 MYS - activity updated through activity BLDA168 from case BLD07-01957.
Plans ACCEPTED BY PLAN TECH  7/27/2007  
Recd Pcfee & Taken To Pln CK  7/27/2007  
Application received  7/27/2007  
Routing - FRONT DESK2/26/2008    
Routing - FRONT DESK3/3/2008