Third Notice BLD | 9/22/2008 | 9/22/2008 | 1/29/2009 | | DONE |
Cathy Brown
|
|
|
Second Notice has not been responded to.
|
Expiration Notice | 1/18/2008 | 2/1/2008 | 1/29/2009 | | DONE |
Cathy Brown
|
|
|
|
Second Notice BLD | 8/11/2008 | 8/11/2008 | 9/22/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | 5/19/2008 | 5/19/2008 | 8/11/2008 | | DONE |
Mike Jordan
|
|
|
|
BLD-Final | 5/19/2008 | 5/19/2008 | 5/19/2008 | P | PASS |
Mike Jordan
|
|
|
kyle Phone #: ###-####
|
DOC - Permit Finaled | 5/19/2008 | 5/19/2008 | 5/19/2008 | P | PASS |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 5/14/2008 | 5/15/2008 | 5/15/2008 | A | PASS |
Troy Cobbley
|
|
|
life safety passed.
|
BLD-Final | 5/14/2008 | 5/14/2008 | 5/14/2008 | P | NR |
Mike Jordan
|
|
|
Kyle Phone #: ###-####. Life/safety insp. failed.
|
FIRE-Final Inspection | 5/13/2008 | 5/14/2008 | 5/14/2008 | A | FAIL |
Troy Cobbley
|
|
|
There were no approved plans on site. Also the three existing exit signs were inoperative and need repaired or replaced.
|
FIRE-Final Inspection | 5/12/2008 | 5/13/2008 | 5/13/2008 | A | FAIL |
Troy Cobbley
|
|
|
There were no approved drawings/notes on site so no inspection was done.
|
BLD-Final | 5/5/2008 | 5/6/2008 | 5/6/2008 | A | NR |
Mike Jordan
|
|
|
kyle Phone #: ###-####. still needs life/safety final and verify elec. and plumbing finals.
|
Inspection Record Card- Bld | | | 5/6/2008 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 4/2/2008 | 4/2/2008 | 4/2/2008 | P | PASS |
Mike Jordan
|
|
|
kyle. Framing for riser rom. 1hr const.
|
Telephone call | | | 3/25/2008 | | |
|
|
|
left mess for kyle massie at ###-#### that permit is ready & need to get gc & r/p
|
Issue PAID IN FULL permit | | | 3/25/2008 | | DONE |
|
|
|
|
Telephone call | | | 3/17/2008 | | PART |
Bob Archibald
|
|
|
Contacted Chad to purchase permit.
|
Inspection Record Card- Bld | | | 3/4/2008 | | DONE |
|
|
|
|
Telephone call | | | 3/4/2008 | | |
|
|
|
called Chad (arch) and left message permit is ready and fee, need RP, GC, RCE
|
Permit Ready to Issue | | | 3/4/2008 | | DONE |
|
|
|
|
Plan resubmittals received | | | 3/3/2008 | | DONE |
Scott Arellano
|
|
|
Received response letter from architect stating the fire pump will no longer be installed, (reference FIR07-00929); and the fire sprinkler system main control valve will be installed via remote PIV. Rated seperation and direct exterior access from the fire srinkler riser room will not be required with in lieu of new valving arrangement and deletion of fire pump.
|
Routing - FIRE | 3/3/2008 | | 3/3/2008 | | PASS |
Scott Arellano
|
|
|
Attached IFC comments to plans
|
Routing - FIRE | 2/26/2008 | | 2/26/2008 | | FAIL |
Scott Arellano
|
|
|
Routed to Scott Arellano per Sam Rogers direction///2-26-08 BAS.
Updated resubmittal items faxed and emailed to architect. *SJA*
|
CHANGE STATUS TO (REV) | | | 2/26/2008 | | |
|
|
|
Per Sam Rogers plans taken to Scott Arellano
|
Plan Reviewer's activity | | | 2/20/2008 | | PASS |
Bob Archibald
|
|
|
Revised plan sheet A2-1approved for construction of riser room inside building rather than being an addition to the exterior of the building. Remaining code provisions on 2 hour wall seperating office and warehouse area reguired. Plans returned to permit desk for issuance.
|
Inspection Record Card- Bld | | | 2/20/2008 | | |
|
|
|
|
Case Summary (BLD) | | | 2/20/2008 | | DONE |
|
|
|
|
Telephone call | | | 2/20/2008 | | DONE |
|
|
|
Called Chad Slichter and told him permit is ready after revised plans submitted on 2/19/08 and fee due
|
Plan resubmittals received | | | 2/19/2008 | | |
|
|
|
Received two copies of sheet A2.1 and letter from architect; taken by Bob A.
|
Telephone call | | | 2/13/2008 | | PART |
Bob Archibald
|
|
|
Conference with architect...resubmittals to be provided 2/19/08.
|
Telephone call | | | 2/5/2008 | | PART |
Bob Archibald
|
|
|
Call with architect, Chad Slichter, he will provide revised drawings no later than 2/13/08. Scope of work will be modified to exclude riser room and leave improvements to the two hour wall between office and warehouse.
|
Extend Review Timeline | | | 2/5/2008 | | PART |
Bob Archibald
|
|
|
Extension of permit expiration pending resubmittals by 2/13/08.
|
Meeting | | | 2/4/2008 | | PART |
Bob Archibald
|
|
|
Site visit with owner, phone conference with fire sprinkler contractor and owner.
|
Telephone call | | | 1/18/2008 | | |
|
|
|
left message w david for chad slichter at ###-#### - that permit has expired & can apply for an extension
|
Plan assigned to (DRS) | 8/7/2007 | | 10/3/2007 | | PASS |
|
|
|
10/3/2007 07:57:01 DRS - activity updated through activity BLDA022 from case BLD07-01957.
|
Routing - PLAN CHECK | 10/1/2007 | | 10/3/2007 | | PASS |
|
|
|
Plans approved as noted on and all attched plan review conditions / comments of all reviewing agencies. Plans to permit desk to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/3/2007 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 10/3/2007 | | DONE |
|
|
|
|
Telephone call | | | 10/3/2007 | | DONE |
|
|
|
left message w david for chad slichter at ###-#### - permit ready and fees given - also need gc name, rce# and rp name
|
Permit Ready to Issue | | | 10/3/2007 | | DONE |
|
|
|
|
Routing - FIRE | 9/26/2007 | | 10/1/2007 | | PASS |
|
|
|
Attached updated IFC review comments to plans.
|
Routing - PLAN CHECK | 9/16/2007 | | 9/26/2007 | | PEND |
|
|
|
Routing back to fire code analyst.
|
Plan resubmittals received | | | 9/25/2007 | | |
|
|
|
Received response letter and two copies of pages A2.1, M1.0; taken to Dan Stuart
|
Routing - FIRE | 9/11/2007 | | 9/16/2007 | | FAIL |
|
|
|
Emailee and faxed resubmittal items to architect. Attached fire code review comments to plans.
|
1st review completed | | | 9/16/2007 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 8/9/2007 | | 9/11/2007 | | PEND |
|
|
|
Resubmittals are NOT required. Code clarification requirements have been red-lined on the plans and clarifications are attached as part of the plan review conditions. Routing plans to fire code analyst.
|
Plan resubmittals received | | | 8/22/2007 | | |
|
|
|
1 cover sheet - 1 8 1/2x11 site plan - 2 copies of sheet no. A1.0 - taken to dan stuart
|
Routing - PLANNING | 8/9/2007 | | 8/9/2007 | | PASS |
|
|
|
Applicant should submit a site plan showing that all of the Conditions of Approval attached to CZC07-00154 have been met.
|
Routing - Erosion and Sediment | 8/8/2007 | | 8/9/2007 | | PASS |
|
|
|
ESC waiver request approved with attached conditions.
|
Routing PW Sewer Rating | 8/8/2007 | | 8/8/2007 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 8/7/2007 | | 8/8/2007 | | PASS |
|
|
|
|
Pending Assignment by MYS | 7/27/2007 | | 8/7/2007 | | DONE |
|
|
|
8/7/2007 15:56:09 MYS - activity updated through activity BLDA168 from case BLD07-01957.
|
Plans ACCEPTED BY PLAN TECH | | | 7/27/2007 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 7/27/2007 | | |
|
|
|
|
Application received | | | 7/27/2007 | | |
|
|
|
|
Routing - FRONT DESK | 2/26/2008 | | | | |
|
|
|
|
Routing - FRONT DESK | 3/3/2008 | | | | |
|
|
|
|