Description
Western Aircraft - Hangar #6 - To construct a new 20,000 square foot, one story, pre-engineered steel aircraft hangar and related site improvements. This hangar will be used for storage of aircraft only and no maintenance or repair will be done in this building. This building will be fully fire sprinkled. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD9/22/20089/22/200812/19/2008 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Second Notice BLD8/11/20088/11/20089/22/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 6/23/20088/11/2008 DONE
BLD-Final6/23/20086/23/20086/23/2008APASS
DetailsJim Storey
Permanent Occupancy  6/23/2008 DONE
DetailsCathy Weisshaupt
Plan Reviewer's activity  5/16/2008 PASS
DetailsJohn Menard
Reviewed and approved plan modification to relocate the accessible route to the required restrooms located in the existing Western Aircraft terminal. JCM
BLD-Conference4/23/20084/24/20084/24/2008APASS
DetailsJim Storey
tj Phone #: ###-#### rated wall on east side of building not code driven. resubmetal need to be submitted to fire for draft curtins if changed from orig. aprovals.
BLD-Aging Inspection2/5/20082/5/20082/5/2008 PART
DetailsJim Storey
all ft and foundation work complet no city insp. no one on site.
(F) Reprint permit  11/7/2007  
Issue PAID IN FULL permit  11/6/2007 DONE
Routing - PLAN CHECK10/29/2007 10/31/2007 PASS
PLANS/APPL TAKEN TO FRONT DESK  10/31/2007 DONE
Print Occupancy Form  10/31/2007 DONE
Telephone call  10/31/2007 DONE
t/c w tom at ###-#### - permit ready and fees given - also need ACHD receipt
Permit Ready to Issue  10/31/2007 DONE
Plan assigned to (JCM)7/30/2007 10/31/2007 PASS
10/31/2007 08:35:00 JCM - activity updated through activity BLDA022 from case BLD07-01960.
Routing - PLUMBING10/29/2007 10/29/2007 PASS
Routing - FIRE10/25/2007 10/29/2007 PASS
Attached updated review comments to plans.
Plan resubmittals received  10/26/2007  
Received 2 copies of response letter dated 10-26-07 from Tom Williams, 2 copies of plumbing plan review and 2 copies of sheet P1.1 and taken to John Menard///10/26/07 @ 1:33pm BAS
Routing - PLUMBING10/23/2007 10/25/2007 FAIL
Routing - PUBLIC WORKS10/22/2007 10/23/2007 PASS
Routing PW Drainage10/22/2007 10/22/2007 PASS
Routing - PLAN CHECK10/16/2007 10/22/2007  
Plan resubmittals received  10/22/2007  
Received 5 copies of Storm Water Management Design narrative and 5 copies of plans and given to Brian Murphy///10/22/07 @ 9:07am BAS
Routing - PUBLIC WORKS10/9/2007 10/16/2007 FAIL
Routing PW Environmental  10/16/2007 PASS
Interior trench drain to 1500 gallon flammable oil/sediment interceptor to sanitary sewer. OK
Routing PW Solid Waste  10/15/2007 PASS
Routing PW Sewer Rating10/15/2007 10/15/2007 PASS
Routing PW Drainage10/9/2007 10/15/2007 FAIL
DetailsBrian Murphy
SEWER LINE LABELED STORMWATER SHOW WHERE {SYSTEM} DRAINAGE IS GOING. INSPECTION NOTE.
Routing PW Sewer Design10/15/2007 10/15/2007 PASS
Plan resubmittals received  10/10/2007  
Received letter in response to fire comment, and two copies of pages C-1, C-2; inserted by arch. rep. and taken plans back to Brian Murphy
Routing - PLAN CHECK10/5/2007 10/9/2007  
Routing - FIRE10/1/2007 10/5/2007 FAIL
Emailed and faxed updated review comments and resubmittal item to the architect.
Plan Reviewer's activity  10/1/2007 PASS
Reviewed and approved structural and nonstructural revisions. JCM
Routing - PLAN CHECK8/20/2007 10/1/2007 PASS
Plan resubmittals received  9/27/2007  
Received 2 copies of responce letters from TRW dated 9/27/07, 2 copies of responce letter from Mountain View Engineering dated 9/21/07, 2 copies of project start up for special inspections (3 Sheets), 2 copies of R & M Steel Company transmital, 2 copies of revised foundation calculations dated 9/21/07 (13 pgs), 1 book from R & M Steel Company about aviation building systems, 2 copies of the following sheets- A0.0, C-1, C-2, A0.1, A1.1, A2.2, A2.1, A3.1, A3.2, A4.1, F-1, F-2, S-1, S-2, S-3, S-4, S-5, S-6, S-7, S-8, S-9, S-10, S-11, S-12, S-13, S-14, S-15, S-16, S-17, S-18, S-19, MG.1, MG.2, M1.1, M2.1, P1.1, P2.1 and Taken to John Menard on 9/27/07 @ 4:30pm BAS
Telephone call  8/28/2007 DONE
SDpoke with Tom Williams regarding resubmittal items.
1st review completed  8/20/2007 FAIL
Routing - FIRE8/14/2007 8/20/2007 FAIL
Faxed and emailed resubmittal items to architect.
Routing - PLAN CHECK8/14/2007 8/14/2007 FAIL
Routing - PLANNING8/10/2007 8/14/2007 PASS
Sara S. approved.
Plan resubmittals requested  8/14/2007 DONE
Faxed architect copy of structural plan review requesting revisions.
Plan resubmittals requested  8/14/2007 DONE
E-mailed architect with copy of plan review.
Routing Off Site - STRUCTURAL7/31/2007 8/14/2007 FAIL
Called Action Couriers for pick up. - Received comment list from the consulting structural engineer requesting revisions.
Routing - PLUMBING8/8/2007 8/10/2007 FAIL
flammable liquids interceptor vents may not tie together. trap and vent trench drain. complete public works review prior to plumbing plan review approval.
Routing - Erosion and Sediment8/6/2007 8/8/2007 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS7/31/2007 8/6/2007 FAIL
Routing PW Sewer Rating7/31/2007 8/6/2007 FAIL
Routing PW Sewer Design7/31/2007 8/6/2007 FAIL
Routing PW Street Lights7/31/2007 8/6/2007 PASS
Plan resubmittals received  8/6/2007  
received "4" sheets of site plans--plans taken to John Menard
Routing PW Environmental8/6/2007 8/6/2007 FAIL
Interior trench drain discharges to storm system via flammable oil/sediment interceptor. Drains must connect to City sanitary sewer or be eliminated. Resubmit new plans sheet showing correction.
Routing PW Drainage7/31/2007 8/5/2007 FAIL
failed due to planned hook up of drain to storm water
Plan Reviewer's activity  8/1/2007 FAIL
Reviewed plans and created plan review comment list. Waiting for plans to be routed to me to verify special inspections before sending list to the architect.
Routing - PLANNING Land Div7/31/2007 7/31/2007 PASS
parcel larger than 5 acres
Plans ACCEPTED BY PLAN TECH  7/31/2007  
Plan routing begun/NEW & ADDTN  7/31/2007  
Pending Assignment by MYS7/27/2007 7/30/2007 DONE
7/30/2007 14:37:04 JCM - activity updated through activity BLDA166 from case BLD07-01960.
Application received  7/27/2007  
Routing Off Site - STRUCTURAL8/6/2007    
Called Action Courier on 8/6/07 @ 2:21pm BAS