BLD-Final | 5/13/2008 | 5/14/2008 | 5/13/2008 | A | PASS |
Dave Hannah
|
|
|
scott Phone #: ###-####
|
DOC - Permit Finaled | 5/13/2008 | 5/13/2008 | 5/13/2008 | P | PASS |
Dave Hannah
|
|
|
|
Telephone call | | | 5/13/2008 | | DONE |
Cathy Brown
|
|
|
tlk to brandi williams ###-#### that permit is ready to be picked up
|
Permit Ready to Issue | | | 5/13/2008 | | DONE |
Cathy Brown
|
|
|
|
BLD-Final | 5/9/2008 | 5/12/2008 | 5/12/2008 | P | FAIL |
Dave Hannah
|
|
|
scott Phone #: ###-#### needs mec final needs to finish grading around house tempered glass by doors and tub hand rail front steps gaurd rail back porch by window well spendal at top of stairs
|
BLD-Final | 5/8/2008 | 5/9/2008 | 5/10/2008 | P | FAIL |
Dave Hannah
|
|
|
scott Phone #: ###-#### needs other trades to sign off
|
BLD-Foundation | 5/5/2008 | 5/6/2008 | 5/6/2008 | A | PASS |
Dave Hannah
|
|
|
jerod Phone #: ###-####
|
BLD-Footing | 5/5/2008 | 5/5/2008 | 5/5/2008 | P | PART |
Dave Hannah
|
|
|
scott Phone #: ###-#### garage ok to pour
|
Routing Walk-In (BLD) | 4/29/2008 | 4/29/2008 | 4/29/2008 | P | PASS |
Perry Paine
|
|
|
conference with the buildier for the requirements to have reduced setbacks < = to 500s.f. is required for reduced setbacks per Sue Hansen
|
Routing Walk-In (BLD) | 4/25/2008 | 4/25/2008 | 4/25/2008 | A | PASS |
Perry Paine
|
|
|
questions on the requirements for minimum parking requirements for final inspection signoff before the garage is completed.
|
Case Summary (BLD) | | | 4/25/2008 | | |
|
|
|
|
BLD-Energy code compliance | 2/1/2008 | 2/4/2008 | 2/4/2008 | A | PASS |
Dave Hannah
|
|
|
scott - insulation Phone #: ###-#### ok to cover
|
BLD-Framing/Rough-in | 1/11/2008 | 1/14/2008 | 1/14/2008 | A | PART |
Dave Hannah
|
|
|
scott Phone #: ###-#### still needs seal package installed
|
BLD-Framing/Rough-in | 1/7/2008 | 1/8/2008 | 1/8/2008 | P | FAIL |
Jim Sly
|
|
|
scott Phone #: ###-#### C/N posted
|
BLD-Footing | 10/11/2007 | 10/11/2007 | 10/11/2007 | P | PASS |
Dave Hannah
|
|
|
jerod Phone #: ###-####
|
BLD-Foundation | 9/28/2007 | 9/28/2007 | 9/28/2007 | P | PART |
Dave Hannah
|
|
|
jared Phone #: ###-#### basement wall ok to pour
|
BLD-Footing | 9/26/2007 | 9/26/2007 | 9/26/2007 | P | PART |
Dave Hannah
|
|
|
gerald Phone #: ###-#### basement ftg
|
Issue PAID IN FULL permit | | | 8/23/2007 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 8/23/2007 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/23/2007 | | |
|
|
|
|
Plan Reviewer's activity | | | 8/23/2007 | | |
|
|
|
MODIFY PERMIT TO REFLECT THE ELIMINATION OF 644S.F. OF BASEMENT AREA TO BE REPLACED WITH CRAWLSPACE. PEP
|
Telephone call | | | 8/17/2007 | | DONE |
|
|
|
tlk to susan rehman ###-#### that permit + esc fee is ready to be picked up
|
Permit Ready to Issue | | | 8/17/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/15/2007 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/7/2007 | | 8/15/2007 | | PASS |
|
|
|
|
Plan assigned to (PEP) | 8/14/2007 | | 8/15/2007 | | PASS |
|
|
|
8/15/2007 15:32:00 PEP - activity updated through activity BLDA022 from case BLD07-01980.
|
Case Summary (BLD) | | | 8/14/2007 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/14/2007 | | |
|
|
|
|
Pending Assignment by SRZ | 7/30/2007 | | 8/14/2007 | | DONE |
|
|
|
8/14/2007 16:18:10 PEP - activity updated through activity BLDA176 from case BLD07-01980.
|
Routing - PLANNING | 8/1/2007 | | 8/7/2007 | | PASS |
|
|
|
Does not meet parking requirements. Called Susan 8/1 and she will call back with directions on how she wants this redlined. Susan decided to add the garage to the building permit. Resubmitted 8/6/07 O.K. now
|
Routing - PUBLIC WORKS | 8/7/2007 | | 8/7/2007 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 7/31/2007 | | 8/1/2007 | | PASS |
|
|
|
|
Routing - Addressing | 7/30/2007 | | 7/30/2007 | | PASS |
|
|
|
|
Application received | | | 7/27/2007 | | |
|
|
|
|