BLD-Final | 1/20/2010 | 1/20/2010 | 1/20/2010 | P | DONE |
Jim Sly
|
|
|
Called Dodder constr.........Left VM No return call EXP.
|
DOC - Permit Expired | 1/20/2010 | 1/20/2010 | 1/20/2010 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 4/24/2008 | 4/28/2008 | 4/28/2008 | A | CANC |
Jim Sly
|
|
|
Called Rick at Dodder Constr.....Need F/P final.....Electr final then Bldg final.....
|
BLD-Final | 4/24/2008 | 4/24/2008 | 4/24/2008 | P | CANC |
Jim Sly
|
|
|
Re-scheduled
|
BLD-Framing/Rough-in | 10/16/2007 | 10/16/2007 | 10/16/2007 | P | PASS |
Jim Sly
|
|
|
rick Phone #: ###-####
|
BLD-Energy code compliance | 10/15/2007 | 10/15/2007 | 10/15/2007 | P | PASS |
Jim Sly
|
|
|
rick Phone #: ###-####
|
BLD-Framing/Rough-in | 10/1/2007 | 10/2/2007 | 10/2/2007 | P | NR |
Jim Sly
|
|
|
matt Phone #: ###-#### Walk Thru.......
|
BLD-Footing | 9/4/2007 | 9/4/2007 | 9/4/2007 | P | PASS |
Jim Sly
|
|
|
dodder Phone #: ###-####
|
Routing Walk-In (BLD) | 8/31/2007 | 8/31/2007 | 8/31/2007 | A | DONE |
|
|
|
8/31/2007 12:00:21 SRZ - activity updated through activity BLDA022 from case BLD07-01995.
|
Plan assigned to (SRZ) | 8/31/2007 | 8/31/2007 | 8/31/2007 | | PASS |
|
|
|
8/31/2007 12:00:21 SRZ - activity updated through activity BLDA022 from case BLD07-01995.
|
Case Summary (BLD) | | | 8/31/2007 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/31/2007 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/31/2007 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 8/31/2007 | | DONE |
|
|
|
Recieved Full Lateral Engineering. (SRZ)
|
Routing Walk-In (BLD) | 8/6/2007 | 8/6/2007 | 8/6/2007 | P | FAIL |
|
|
|
engineering required for perp brace rear long wall
|
Routing Walk-In (Zoning) | 7/31/2007 | 7/31/2007 | 7/31/2007 | P | DONE |
|
|
|
7/31/2007 15:09:15 DEM - activity updated through activity BLDI252 from case BLD07-01995. Approved as redlined
|
Routing Walk-In (BLD) | 7/31/2007 | 7/31/2007 | 7/31/2007 | P | FAIL |
|
|
|
NEED BRACED WALL DETAIL FOR LONG WALL.
|
Application received | | | 7/31/2007 | | |
|
|
|
|