Third Notice BLD | 6/6/2008 | 6/6/2008 | 8/8/2008 | | DONE |
Cathy Brown
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 4/23/2008 | 4/23/2008 | 6/6/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 3/10/2008 | 4/23/2008 | | DONE |
|
|
|
|
FIRE-Final Inspection | 3/7/2008 | 3/10/2008 | 3/10/2008 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
Code Occupancy Approval | 3/10/2008 | 3/10/2008 | 3/10/2008 | P | PASS |
Scott M.Brown
|
|
|
OK FINAL SIGNED OFF
|
BLD-Final | 3/7/2008 | 3/10/2008 | 3/10/2008 | P | PASS |
Mike Jordan
|
|
|
Dutch ###-####. All issues have been corrected. ok for perm occ.
|
Permanent Occupancy | | | 3/10/2008 | | DONE |
|
|
|
|
FIRE-Final Inspection | 2/28/2008 | 2/29/2008 | 2/29/2008 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given until the second link is installed on the outside fire door. The door will then need to be tested. All other life safety items are ok.
|
BLD-Final | 2/28/2008 | 2/29/2008 | 2/29/2008 | P | PART |
Mike Jordan
|
|
|
Duch Phone #: -208###-####. Temp occ granted. Needs tp provide ADA counter at POS, provide boot under one wash sink in kitchen, repair cleanout in dining room, make membrane penetration.
|
BLD-Framing/Rough-in | 2/25/2008 | 2/26/2008 | 2/26/2008 | A | PASS |
Mike Jordan
|
|
|
bill - fire wall Phone #: ###-####. Reviewed UL data and inspected plumbing through penetration on 2hr. fire barrier wall at canopy section.
|
BLD-Framing/Rough-in | 2/11/2008 | 2/11/2008 | 2/11/2008 | P | PASS |
Mike Jordan
|
|
|
BILL Phone #: ###-####Completion of 2hr fire barrier wall at canopy section. Also reveiwed detail from architect for continuation of 2hr. wall thru store front.
|
BLD-Framing/Rough-in | 1/24/2008 | 1/25/2008 | 1/25/2008 | P | PASS |
Mike Jordan
|
|
|
Bill please call 1/2 hr before going out Phone #: ###-####. 2hr. wall at canopy section
|
BLD-Other | 1/23/2008 | 1/23/2008 | 1/23/2008 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 1/23/2008 at 7:03:28 AM. Contact: ###-####. ceiling grid ok.
|
BLD-Framing/Rough-in | 1/18/2008 | 1/22/2008 | 1/22/2008 | A | CANC |
Mike Jordan
|
|
|
bill Phone #: ###-####
|
BLD-Framing/Rough-in | 1/16/2008 | 1/17/2008 | 1/17/2008 | A | NR |
Mike Jordan
|
|
|
Bill-Cieling grid inspection please Phone #: ###-####. Needs trades ri insp. first.
|
BLD-Other | 1/8/2008 | 1/8/2008 | 1/8/2008 | P | PASS |
Mike Jordan
|
|
|
bill Note: fire wall Phone #: ###-####
|
BLD-Framing/Rough-in | 1/4/2008 | 1/4/2008 | 1/4/2008 | P | PART |
Mike Jordan
|
|
|
Inner layer of shaft board at 2hr. fire barrier extension to blockout existing door.
|
BLD-Framing/Rough-in | 1/3/2008 | 1/4/2008 | 1/4/2008 | A | PART |
Mike Jordan
|
|
|
dutch Phone #: ###-####. hardlids ok, pend. mech. Interior soffits ok. Contractor to supply UL tech data for membrane and through penetrations at two hr. fire barrier. Also rec eived detail for beam protection at 2hr. firebarrier wall. Bldg. official has approved beam protection detail.
|
BLD-Framing/Rough-in | 12/12/2007 | 12/13/2007 | 12/13/2007 | A | PART |
Mike Jordan
|
|
|
bill Phone #: ###-####. Interior steel stud walls only, no grid or hardlids. Needs to pull mech. permit.
|
BLD-Conference | 12/10/2007 | 12/11/2007 | 12/11/2007 | P | DONE |
Mike Jordan
|
|
|
Met on site with architect conering issues noted on c/n that was issued. All items have been taken care of except for wood beam penetration at 2hr. fire barrier wall. Architect to provide alernate detail and submit to bldg. official for approval.
|
Telephone call | | | 11/26/2007 | | |
|
|
|
Per phone call from Jerry Hine w/Sletten Construction they are not the GC on this project. I called Jason Rummer (owner rep) and he said HCD is the GC. I called Dennis Harmon w/HCD Const. and he said he is the GC and HCD company did pick up and pay the permit fees when issued, I verified this is correct through cashiering receipt. Changed name to HCD Const.
|
BLD-Footing | 11/9/2007 | 11/13/2007 | 11/13/2007 | A | PART |
Mike Jordan
|
|
|
dennis Phone #: ###-####. footings for ts columns ok. Also wrote contractor c/n for architect to provide UL approved assembly for wood beam penetrations at 2hr fire barrier wall, deatail forcontinuation of 2hr. fire barrier wall thruogh storefront to fire door assembly, provide ul 2hr wall asemmbly, detail for 2hr fire barrier wall at west wall intersection were existing exit door was left.
|
Issue PAID IN FULL permit | | | 11/5/2007 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/11/2007 | | 10/31/2007 | | PASS |
|
|
|
Drawings approved after the resubmittal review.
|
Plan assigned to (CJW) | 8/8/2007 | | 10/31/2007 | | PASS |
|
|
|
10/31/2007 10:33:03 CJW - activity updated through activity BLDA022 from case BLD07-02038.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/31/2007 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/31/2007 | | DONE |
|
|
|
|
Telephone call | | | 10/31/2007 | | DONE |
|
|
|
left vm for chad slitchter at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 10/31/2007 | | DONE |
|
|
|
|
Plan resubmittals received | | | 10/26/2007 | | |
|
|
|
Received 1 copy of responce letter dated 10/25/07 from Chad Slichter, 2 copies of sheets A2.2 and A4.2 and taken to Carl Westfall///10/26/07 @ 1:05pm BAS
|
Routing - FIRE | 10/8/2007 | | 10/11/2007 | | PASS |
|
|
|
Attached IFC review comments to plans.
|
1st review completed | | | 10/11/2007 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 8/27/2007 | | 10/8/2007 | | FAIL |
|
|
|
The IBC plan review was started on October 3, 2007 and was finished on October 8, 2007. Revised drawings were required. See the plan review report.
|
Routing - PLANNING | 8/23/2007 | | 8/27/2007 | | PASS |
|
|
|
Josh Wilson CZC07-00163
|
Routing - PLUMBING | 8/13/2007 | | 8/23/2007 | | PASS |
|
|
|
4" floor sink required in the water heater room to accept the discharge of the R.P. or change to dcva. additional cross connection protection may be required at the proofer, tea and coffee makers, convection oven, etc.
|
Routing - Erosion and Sediment | 8/10/2007 | | 8/13/2007 | | PASS |
|
|
|
No ESC permit required.
|
Routing PW Environmental | 8/10/2007 | | 8/10/2007 | | PASS |
|
|
|
OK, 1500 gallon GI noted on plans
|
Routing - PUBLIC WORKS | 8/8/2007 | | 8/10/2007 | | PASS |
|
|
|
|
Pending Assignment by MYS | 8/3/2007 | | 8/8/2007 | | DONE |
|
|
|
8/8/2007 16:03:18 MYS - activity updated through activity BLDA172 from case BLD07-02038.
|
Plans ACCEPTED BY PLAN TECH | | | 8/6/2007 | | |
|
|
|
|
Application received | | | 8/3/2007 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/3/2007 | | |
|
|
|
|