Case Summary (BLD) | | | 11/6/2015 | | DONE |
|
|
|
|
Third Notice BLD | 12/11/2007 | 12/11/2007 | 9/30/2008 | | DONE |
Cathy Brown
|
|
|
Second Notice has not been responded to.Filed for Bankruptcy
|
Second Notice BLD | 11/13/2007 | 11/13/2007 | 12/11/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 11/1/2007 | 11/13/2007 | | DONE |
|
|
|
|
Permanent Occupancy UNPAID FEE | | | 11/1/2007 | | DONE |
|
|
|
|
BLD-Final | 10/30/2007 | 10/30/2007 | 10/30/2007 | P | PASS |
Dave Hannah
|
|
|
steve Phone #: ###-#### ok for perm occ mec is ok they will final out permit elec will also final out premit
|
FIRE-Final Inspection | 10/30/2007 | 10/30/2007 | 10/30/2007 | P | PASS |
Forrest France
|
|
|
Fire life safety final passed per site inspection completed by K. Roule, corrections are complete.
|
FIRE-Supply Line Hydro | 10/29/2007 | 10/30/2007 | 10/30/2007 | A | DEFR |
Forrest France
|
|
|
Inspection intended for a life safety final.
|
BLD-Final | 10/26/2007 | 10/29/2007 | 10/29/2007 | A | NR |
Dave Hannah
|
|
|
steve Phone #: ###-#### needs fire final
|
FIRE-Final Inspection | 10/26/2007 | 10/26/2007 | 10/26/2007 | P | FAIL |
Forrest France
|
|
|
Need approved plans on site for review, exit sign at the main entry/exit door did not function on battery backup, need to test EM lighting.
|
BLD-Framing/Rough-in | 10/12/2007 | 10/12/2007 | 10/15/2007 | P | PASS |
Dave Hannah
|
|
|
mario Phone #: ###-####
|
(F) Reprint permit | | | 8/23/2007 | | |
|
|
|
|
BLD-Framing/Rough-in | 8/14/2007 | 8/15/2007 | 8/15/2007 | A | PART |
Dave Hannah
|
|
|
Mario; Phone #: ###-#### Internet Inspection Request from: Hattie James ok to cover door
|
Permit Ready to Issue | | | 8/9/2007 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/9/2007 | | DONE |
|
|
|
|
Telephone call | | | 8/9/2007 | | DONE |
|
|
|
Called and left voice message at ###-#### that permit is ready & fees///8/9/07 @ 12:15pm BAS
|
Issue PAID IN FULL permit | | | 8/9/2007 | | DONE |
|
|
|
|
BLD-Conference | 8/7/2007 | 8/8/2007 | 8/8/2007 | A | PASS |
Dave Hannah
|
|
|
9:00am please Field Plan Review
|
Routing - PUBLIC WORKS | 8/8/2007 | | 8/8/2007 | | PASS |
|
|
|
Please return to Rita or Dave Hannah
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/8/2007 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/7/2007 | | |
|
|
|
|
Application received | | | 8/7/2007 | | |
|
|
|
|
1st review completed | | | 8/7/2007 | | PASS |
|
|
|
Put in by JLG as part of an error check
|