Case Summary (BLD) | | | 4/16/2012 | | DONE |
Tisha Gallop
|
|
|
|
BLD-Aging Inspection | 7/28/2011 | 7/28/2011 | 7/29/2011 | | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 7/29/2011 | 7/29/2011 | 7/29/2011 | P | PASS |
Dave Hannah
|
|
|
|
Telephone call | | | 5/23/2011 | | DONE |
Barbara Stitt
|
|
|
Left a message for Scott Larrondo to call regarding this project 5-23-11 @ 2:00pm
|
Telephone call | | | 5/20/2011 | | DONE |
Barbara Stitt
|
|
|
Left a message for Scott Larrondo to call regarding this project 5-20-11 @ 11:25am
|
BLD-Aging Inspection | 4/27/2011 | 4/27/2011 | 4/30/2011 | | PASS |
Dave Hannah
|
|
|
|
CDHD Occupancy Approval | 4/28/2011 | 4/28/2011 | 4/28/2011 | | DONE |
Barbara Stitt
|
|
|
Approved per Betsy Kober-permit #36176
|
Zoning Approval | 4/28/2011 | 4/28/2011 | 4/28/2011 | | DONE |
Sarah Schafer
|
|
|
|
Print Occupancy Form | | | 4/28/2011 | | DONE |
Barbara Stitt
|
|
|
|
BLD-Aging Inspection | 2/14/2011 | 2/14/2011 | 2/22/2011 | | CANC |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 11/24/2010 | 11/24/2010 | 11/30/2010 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 9/23/2010 | 9/23/2010 | 9/29/2010 | | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 7/23/2010 | 7/23/2010 | 7/26/2010 | A | PASS |
Dave Hannah
|
|
|
Per Dave Hannah no mechanical work done//4-28-11 BAS
|
BLD-Aging Inspection | 7/23/2010 | 7/23/2010 | 7/23/2010 | | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 4/14/2010 | 4/14/2010 | 4/21/2010 | P | PASS |
Dave Hannah
|
|
|
left a card for owner to call me project is ok for final occ
|
BLD-Conference | 4/7/2008 | 4/8/2008 | 4/9/2008 | A | PART |
Dave Hannah
|
|
|
call came in saying people are inside serving coffee without temp occupancy?? I oked for temp oc
|
BLD-Final | 3/13/2008 | 3/13/2008 | 3/13/2008 | A | PART |
Dave Hannah
|
|
|
scott Phone #: ###-####ok for temp occ needs to finish ada restrooms
|
BLD-Final | 3/12/2008 | 3/12/2008 | 3/13/2008 | P | NR |
Dave Hannah
|
|
|
scott Phone #: ###-####
|
BLD-Final | 3/11/2008 | 3/12/2008 | 3/12/2008 | A | FAIL |
Dave Hannah
|
|
|
scott Phone #: ###-#### needs second handrail on stairs ada restrooms have several items fixed needs signage
|
Override - Condition Holds | 3/11/2008 | 1/1/1900 | 3/11/2008 | | |
|
|
|
ok
|
FIRE-Final Inspection | 3/7/2008 | 3/7/2008 | 3/7/2008 | P | PASS |
Forrest France
|
|
|
Life safety inspection passed, verified door hardware to be installed, address numbers to be posted prior to structural final.
|
BLD-Final | 3/6/2008 | 3/7/2008 | 3/7/2008 | A | FAIL |
Dave Hannah
|
|
|
SCOTT Phone #: ###-#### needs other trades finaled first
|
Override - Condition Holds | 3/7/2008 | 1/1/1900 | 3/7/2008 | | |
|
|
|
fire life safety only
|
FIRE-Final Inspection | 3/6/2008 | 3/6/2008 | 3/6/2008 | P | FAIL |
Forrest France
|
|
|
Missing doors and hardware at both restrooms, need to provide and post one PFE for each level per fire code review notes, provide building address as discussed facing 10th street.
|
BLD-Final | 3/4/2008 | 3/6/2008 | 3/6/2008 | A | NR |
Dave Hannah
|
|
|
Scott, please call 1st; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt needs other trades to final first
|
Override - Condition Holds | 3/6/2008 | 1/1/1900 | 3/6/2008 | | |
|
|
|
FIRE
|
Override - Condition Holds | 3/6/2008 | 1/1/1900 | 3/6/2008 | | |
|
|
|
OK
|
BLD-Energy code compliance | 1/17/2008 | 1/17/2008 | 1/17/2008 | A | PASS |
Dave Hannah
|
|
|
Scott, reinspection ###-#### ok to cover
|
BLD-Energy code compliance | 1/16/2008 | 1/16/2008 | 1/17/2008 | P | FAIL |
Dave Hannah
|
|
|
scott - insulation Phone #: ###-#### fire blocking not done
|
Override - Condition Holds | | | 1/17/2008 | | |
|
|
|
|
Override - Condition Holds | 1/16/2008 | 1/1/1900 | 1/16/2008 | | |
|
|
|
energy code inspection only
|
BLD-Framing/Rough-in | 1/14/2008 | 1/14/2008 | 1/15/2008 | P | PART |
Dave Hannah
|
|
|
scott Note: please call 1/2 hr prior to be able to be in bldg Phone #: ###-#### ok to insulate but need to fire block walls most will be done by insulation
|
Override - Condition Holds | 1/14/2008 | 1/1/1900 | 1/14/2008 | | |
|
|
|
ok
|
OVERRIDE | | | 11/8/2007 | | |
|
|
|
|
Telephone call | | | 11/8/2007 | | |
|
|
|
changed gc from ken maynard to lorrando builders(see scanned document)
|
Override - Condition Holds | | | 11/8/2007 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 11/8/2007 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/8/2007 | | DONE |
|
|
|
|
(F) Reprint permit | | | 11/8/2007 | | |
|
|
|
|
Print Occupancy Form | | | 11/8/2007 | | DONE |
|
|
|
|
Override - Condition Holds | | | 11/8/2007 | | |
|
|
|
|
Permit Ready to Issue | | | 11/8/2007 | | |
|
|
|
|
Plan assigned to (CJW) | 8/25/2007 | | 11/7/2007 | | PASS |
|
|
|
11/7/2007 14:52:35 CJW - activity updated through activity BLDA022 from case BLD07-02081.
|
Routing - PLAN CHECK | 10/17/2007 | | 11/7/2007 | | PASS |
|
|
|
Drawings approved after resubmittal review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/7/2007 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/29/2007 | | 11/6/2007 | | PASS |
|
|
|
(10-29-07) Request for modification was routed to George Slane per Carl Westfall. (11-6-07) Signed copy of the modification letter was returned to Carl Westfall.
|
Plan resubmittals received | | | 11/1/2007 | | |
|
|
|
received 2 copies of CDH approval form and registered design professional in responsible charge, and 1 involved parties sheet taken to Carl W.
|
Plan resubmittals received | | | 10/29/2007 | | |
|
|
|
received letter for george slane & temporary license agreement app for achd (2) pages, achd receipt (2) pages --also "1" site plan & "2" sets of plans (4) sheets each----per Carl Westfall route plans to George Slane 1st
|
Routing - FIRE | 10/12/2007 | | 10/17/2007 | | PASS |
|
|
|
Attached IFC review comments to plans.
|
1st review completed | | | 10/17/2007 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 9/4/2007 | | 10/12/2007 | | FAIL |
|
|
|
The IBC plan review was started on October 10, 2007 and was finished on October 12, 2007. Additional information and potentially revised drawings were required. See the plan review report.
|
Routing - PLANNING | 8/29/2007 | | 9/4/2007 | | PASS |
|
|
|
Sarah Schafer (minor exterior change to Bannock Street entry)
|
Routing - PLUMBING | 8/27/2007 | | 8/29/2007 | | PASS |
|
|
|
backflow requirement will be per upc.
|
Routing - PUBLIC WORKS | 8/25/2007 | | 8/27/2007 | | PASS |
|
|
|
|
Routing PW Sewer Rating | 8/27/2007 | | 8/27/2007 | | PASS |
|
|
|
|
Pending Assignment by MYS | 8/9/2007 | | 8/25/2007 | | DONE |
|
|
|
8/25/2007 14:03:46 MYS - activity updated through activity BLDA172 from case BLD07-02081.
|
Plans ACCEPTED BY PLAN TECH | | | 8/10/2007 | | |
|
|
|
|
Application received | | | 8/9/2007 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/9/2007 | | DONE |
|
|
|
|