Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberBLD07-02082
StatusFinaled
Name COLSON & COLSON GENERAL CONTRACTOR
Site Address 4892 N CLOVERDALE RD
Project NameBoise Retirement Residence
Customer Number 
ePlanReviewNo
Description
(BOISE RETIREMENT RESIDENCE - BLDG C - WEST SECTION) To construct a new 29 unit 23,254 square foot, three story, I-1, non state licensed, residential care, assisted living facility where all residence will be capable of responding to an emergency situation without physical assistance. This building to be fully fire sprinklered with an NFPA 13-R system as required by the occupancy. This area is separated from the center building (Section A) by a 2-hr. fire wall. Note: This project was reviewed by ICC for energy, structural, nonstructural and accessibility requirements for code compliance. (23 units are less than 800 sq.ft. and 6 units are greater than 800 sq.ft.)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  2/11/2010 DONE
DetailsTisha Gallop
called and spoke to Eric need FV for van garage and also still need contracts for buildings A, B, & C. He said working on the final values for A,B,C and probably have them to me mid next week.
Telephone call  1/25/2010 DONE
DetailsTisha Gallop
spoke to Eric about all final values exactly the same as initial. He said is estimate the same. I told him need actual values and to fax me over contracts and I will sort it out.
Third Notice 1/13/20101/6/2010 DONE
Third Notice 12/24/200912/30/2009 DONE
faxed
Second Notice 12/14/200912/14/2009 DONE
DetailsBarbara Stitt
First Notice 10/30/200911/5/2009 DONE
BLD-Final10/20/200910/21/200910/20/2009APASS
DetailsJim Sly
bryan Phone #: ###-####
OK for Perm Occ.
FIRE-Final Inspection10/20/200910/20/200910/20/2009PPASS
DetailsTroy Cobbley
Life safety passed.
Permanent Occupancy UNPAID FEE  10/20/2009 DONE
FIRE-Final Inspection10/5/200910/6/200910/6/2009PFAIL
DetailsTroy Cobbley
The occupant load signs have been mounted and the exit signs, emergency lighting and exit discharge lighting have been verified for functionality. One emergency light and one exit sign need repaired as discussed. See the 10/5/2009 entry for other items needing addressed prior to a final sign off. The relocation of the generator is ok per scott and the fire alarm panel can provide supervision of the primary power at the horizontal sliding doors per Jason Blaise.
FIRE-Final Inspection10/1/200910/5/200910/5/2009PFAIL
DetailsTroy Cobbley
The project related fire sprinkler and fire alarm permits need to be finaled, both of the horizontal sliding doors need to be adjusted so that they easily open manually, the atrium smoke evacuation system needs to be addressed, the exit discharge lighting needs to be removed from control by the photocells and electrical super vision of the horizontal sliding doors needs to be addressed. All of the exit signs, emergency lights and exit discharge lights need to be inspected for placement and tested for functionality after the generator switch over has been repaired. Also need to verify that the relocation of the emergency generator is ok with plan review.
PubWorks Occupancy Approval9/28/20099/28/20099/28/2009 DONE
DetailsTiffany Lowery
BLD-Final9/16/20099/17/20099/17/2009APART
DetailsJim Sly
Phone #: ###-#### Internet Inspection Request from: Bryan Herb
Checked out all sleeping rooms.....OK, but need all Req signatures for final.
Zoning Approval9/16/20099/16/20099/16/2009 PASS
DetailsAndrea Tuning
BLD-Other9/10/20099/14/20099/14/2009PPASS
DetailsJim Storey
Drop ceiling grid inspection Phone #: ###-#### Internet Inspection Request from: Bryan Herb
BLD-Other8/24/20098/25/20098/25/2009ANR
DetailsJim Sly
Suspended ceiling Phone #: ###-#### Internet Inspection Request from: Bryan Herb
BLD-Energy code compliance5/26/20095/27/20095/27/2009APART
DetailsJim Sly
1st floor insulation Phone #: ###-#### Internet Inspection Request from: Bryan Herb........OK
BLD-Wall cover5/26/20095/26/20095/26/2009PPASS
DetailsJim Sly
2nd floor sheetrock nailing Phone #: ###-#### Internet Inspection Request from: Bryan Herb
BLD-Wall cover5/20/20095/21/20095/21/2009APASS
DetailsJim Sly
sheetrock nailing 3rd floor hallways 1st layer Phone #: ###-#### Internet Inspection Request from: Bryan Herb
BLD-Energy code compliance5/19/20095/20/20095/20/2009APASS
DetailsJim Sly
2nd floor insulation Phone #: ###-#### Internet Inspection Request from: Bryan Herb
BLD-Energy code compliance5/15/20095/15/20095/15/2009PPASS
DetailsJim Sly
3rd floor insulation Phone #: ###-#### Internet Inspection Request from: Bryan Herb
BLD-Framing/Rough-in5/13/20095/14/20095/14/2009APASS
DetailsJim Sly
1st and 2nd floor fire caulking Phone #: ###-#### Internet Inspection Request from: Bryan Herb
BLD-Wall cover5/11/20095/12/20095/12/2009PPASS
DetailsJim Sly
reinspect draft stop on 3rd floor. Phone #: ###-#### Internet Inspection Request from: Bryan Herb
BLD-Framing/Rough-in5/8/20095/11/20095/11/2009APART
DetailsJim Sly
fire caulking 3rd floor Phone #: ###-#### Internet Inspection Request from: Bryan Herb
BLD-Wall cover4/20/20094/21/20094/21/2009APASS
DetailsJim Sly
1st and 2nd floor hallway fire caulking inspection Phone #: ###-#### Internet Inspection Request from: Bryan Herb
BLD-Framing/Rough-in2/26/20093/2/20093/2/2009PPART
DetailsJim Sly
interior shear inspection Phone #: ###-#### Internet Inspection Request from: Bryan Herb Int Shear C wing OK.
BLD-Framing/Rough-in2/4/20092/5/20092/5/2009APART
DetailsJim Sly
Roof inspection Phone #: ###-#### Internet Inspection Request from: Bryan Herb
Roof Nailing and straps appear OK BLDG C
BLD-Framing/Rough-in1/30/20092/2/20092/2/2009APART
DetailsJim Sly
exterior sheer wall C wing Phone #: ###-#### Internet Inspection Request from: Bryan Herb
Exterior wall shear nailing OK Bldg C
BLD-Conference12/11/200812/12/200812/12/2008ADONE
DetailsJim Sly
discussion of plumbing against 2hr fire wall Phone #: ###-#### Internet Inspection Request from: Bryan Herb
BLD-Concrete11/24/200811/25/200811/25/2008PPART
DetailsJim Sly
MTI scheduled for 2:30 and concrete for 3:00 for interior footings in last wing. Phone #: ###-#### Internet Inspection Request from: Bryan Herb
Interior Footings OK pending MTI insp, tests and approvals.
BLD-Energy code compliance10/13/200810/17/200810/17/2008APASS
DetailsJim Sly
foundation insulation Phone #: ###-#### Internet Inspection Request from: Bryan Herb
BLD-Foundation10/13/200810/14/200810/14/2008APART
DetailsJim Sly
Phone #: ###-#### Internet Inspection Request from: Bryan Herb
Wall at west end OK pending MTI special insp, tests, and approvals.

w
BLD-Footing10/7/200810/8/200810/8/2008PPART
DetailsJim Sly
Phone #: ###-#### Internet Inspection Request from: Bryan Herb
West end. OK


w
Issue PAID IN FULL permit  7/14/2008 DONE
Ready Permit EXTENDED  4/10/2008  
extend permit to 8-9-08
Telephone call  4/4/2008  
talked to Robert Underwood at ###-#### that permits have expired & he will e-mail an extension letter for bld07-02083, 2082, & 2085..--per Tim Woodard treat these as commercial plans
Permit Ready to Issue  1/9/2008 DONE
Print Occupancy Form  1/9/2008  
PLANS/APPL TAKEN TO FRONT DESK  1/4/2008  
Routing - PLANNING Land Div12/27/2007 12/27/2007 PASS
Final Plat recorded.
Routing - PLANNING12/27/2007 12/27/2007 PASS
DetailsAndrea Tuning
Routing - PLAN CHECK12/3/2007 12/19/2007 PASS
12/19/07 - Plans approved by ICC. Notification provided by e-mail. Pending approval from Land Division and Planning prior to issuance.
Plan resubmittals received  12/11/2007  
received "3" copies from curry arch (3) pages each for comments & "3" sets of plans with each sheet S1.4, S 1.5a, S 1.5b, S1.6, S 1.7, S 1.8a, S 1.8b, S 1.9, S1.10, S1.11a, S1.11b, S1.12, & S2.2, ---plans taken to Marlene Southard
Routing - PLAN CHECK11/15/2007 12/5/2007 FAIL
11/9/2007 - Routed resubmittal packages to ICC for follow up review via FedEx.
12/5/07 - ICC review received. Plan review not approved.
Routing - FIRE11/29/2007 12/3/2007 PASS
Attached updated review comment to plans.
Routing - PLUMBING11/27/2007 11/29/2007 PASS
Rereview based on resubmittals dated 11/8/07 per plans and 2003 upc
Plan resubmittals received  11/27/2007  
Received letter addressed to Marlene and two copies of engineering report for smoke management systems; taken to Marlene S.
Routing - PLANNING11/14/2007 11/15/2007 FAIL
Failed per DRH07-00221. The applicant has not shown the configuration of the proposed parcel exists, Andrea Tuning-###-####;
CUP06-00127 Susan Riggs
Routing - PUBLIC WORKS11/7/2007 11/14/2007 PASS
Routing PW Drainage11/8/2007 11/14/2007 PASS
Routing PW Sewer Design11/9/2007 11/14/2007 PASS
Routing PW Solid Waste11/14/2007 11/14/2007 PASS
Plan resubmittals received  11/8/2007  
Received 2 copies of response letter from Robert Underwood regarding Plumbing, 2 copies of response letter from Robert Underwood regarding Non-structural, 2 copies of response letter from Dan Green regarding Structural, 2 copies of response letter from Robert Underwood regarding Energy, 2 copies of response letter from Robert Underwood regarding Fire, 4 copies of sheets A0.0, A0.1, A0.2, A0.3, A0.4, A1.1, A1.3, A1.7, A2.1, A2.4, A2.5, A3.1, A3.2A, A3.2B, A3.3, A3.4, A3.5A, A3.5B, A3.6, A3.7, A3.8A, A3.8B, A3.9, A4.0, A7.1A, A8.0, A8.2A, A8.2B, A8.3, A8.9, A9.0, A9.1, A9.2, A9.3, FS1, FS2, FS3, FS4, FS5, FS6, M1.1, M1.2, M1.3, M1.4, M1.5, M1.6, M2.1, M2.2, M2.3, M3.1, M3.2, M3.3, M3.4, M3.5, M4.0, M4.1, M4.2, M4.3, M4.4, M4.5, M4.6, M5.1, M5.2, M5.3, E1.1L, E1.1P, E1.2L, E1.2P, E1.3L, E1..3P, E1.4L, E1.4P, E1.5L, E1.5P, E1.6, E2.1, E2.2, E2.3A, E2.3B, E2.3C, E3.1, E3.2, E3.3, E4.1, E4.2, S0.0, S0.1, S0.2, S0.3, S0.4, S0.5, S1.1, S1.10, S1.11A, S1.11B, S1.12, S1.13, S2.1, S2.2, S2.3, S2.4, S2.5, S2.6, S2.7A, S2.7B, S2.8, S2.9, S3.0, S3.1, S3.2, S3.3, S1.2A, S1.2B, S1.3, S1.4, S1.5A, S1.5B, S1.6, S1.7, S1.8A, S1.8B, S1.9 and inserted into office & issue plans by Robert Underwood 2 copies to go to ICC so those along with a redlined set from ICC were taken to Marlene's desk///11/8/07 BAS
Plan Reviewer's activity  10/25/2007  
redlined reviewed plans from ICC sent to architect
Routing - PLAN CHECK10/3/2007 10/23/2007 HOLD
Plans on HOLD waiting for resubmittals.
Routing - PLAN CHECK8/29/2007 10/23/2007 FAIL
9/10/07 - Routed off site to ICC for review via FedEx. msouthard
10/23/07- Received ICC review and sent copy to architect.
Routing - FIRE9/27/2007 10/3/2007 FAIL
Emailed and Faxed resubmittal items to architect.
1st review completed  10/3/2007 FAIL
Plan resubmittals received  9/6/2007 DONE
5 copies of civil drawings C1.0, C1.1, C2.1, C2.2, C3.1, C3.2, C4.1, C4.2, C4.3, C5.1, C5.2 received.
Routing - PLANNING8/29/2007 8/29/2007 FAIL
Failed per DRH07-00221. The applicant has not shown the configuration of the proposed parcel exists, or provided the City with a copy of the recorded cross access agreement Andrea Tuning;
CUP06-00127 Susan Riggs
Routing - PLUMBING8/23/2007 8/29/2007 FAIL
vent all traps in the kitchen. floor drains connected to the sanitary sewer are not allowed in walk in coolers. provide information on how the 250 gpm from the 4" rp in the mech. room will be drained. 4" wasate is too small. building plans do not match civil plans. sewer stub outs.
Routing - Erosion and Sediment8/22/2007 8/23/2007 PASS
ESC plan approved with attached conditions. Refer to ESC07-00987 as master ESC plan for project.
Routing - PUBLIC WORKS8/16/2007 8/22/2007 FAIL
Routing PW Sewer Rating8/16/2007 8/22/2007 PASS
Routing PW Solid Waste8/16/2007 8/22/2007 FAIL
Routing PW Environmental8/16/2007 8/22/2007 PASS
GI noted for kitchen
Routing PW Drainage8/16/2007 8/21/2007 FAIL
DetailsBrian Murphy
depth to groundwater. speed thru thr troat of O/S trap.
Routing PW Street Lights8/16/2007 8/17/2007 PASS
Routing PW Sewer Design8/16/2007 8/16/2007 FAIL
Easement Required
Routing - PLANNING Land Div8/15/2007 8/16/2007 FAIL
Final plat to be recorded prior to permit being issued. daa/jej
Plan routing begun/NEW & ADDTN  8/15/2007  
Plans ACCEPTED BY PLAN TECH  8/15/2007  
Override - Parcel Holds  8/15/2007  
Recd Pcfee & Taken To Pln CK  8/15/2007 DONE
Application received  8/9/2007