Permit Information
Permit NumberBLD07-02083
StatusFinaled
Name COLSON & COLSON GENERAL CONTRACTOR
Site Address 4890 N CLOVERDALE RD
Project NameBoise Retirement Residence
Customer Number 
ePlanReviewNo
Description
(BOISE RETIREMENT RESIDENCE - BLDG A - CENTER SECTION) To construct a new 26 unit (plus manager & co-manager units) 37,512 square foot, three story, I-1, non state licensed, residential care, assisted living assisted living facility, where all residence will be capable of responding to an emergency situation without physical assistance. This building will contain the supporting occupancies such as assembly areas, dining area, associated kitchen, and an atrium all per approved plans. This building to be fully fire sprinklered with an NPFA 13 system for area increase and the atrium area. This building section is separated from the west end (Section C) and the east end (Section B) by 2-hr. fire walls. Note: This project was reviewed by ICC for energy, structural, nonstructural and accessibility requirements for code compliance. (25 units are less than 800 sq.ft. and 3 units are more than 800 sq.ft.)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  2/11/2010 DONE
DetailsTisha Gallop
called and spoke to Eric need FV for van garage and also still need contracts for buildings A, B, & C. He said working on the final values for A,B,C and probably have them to me mid next week.
Telephone call  1/25/2010 DONE
DetailsTisha Gallop
spoke to Eric about all final values exactly the same as initial. He said is estimate the same. I told him need actual values and to fax me over contracts and I will sort it out.
Third Notice 1/13/20101/6/2010 DONE
Third Notice 12/24/200912/30/2009 DONE
DetailsTisha Gallop
faxed
Second Notice 12/14/200912/14/2009 DONE
DetailsBarbara Stitt
First Notice 10/30/200911/5/2009 DONE
BLD-Final10/20/200910/20/200910/20/2009PCANC
DetailsJim Sly
Phone #: ###-#### Internet Inspection Request from: Bryan Herb
BLD-Final10/20/200910/21/200910/20/2009APASS
DetailsJim Sly
bryan Phone #: ###-####
OK for Perm Occ.
FIRE-Final Inspection10/20/200910/20/200910/20/2009PPASS
DetailsTroy Cobbley
Life safety passed.
Permanent Occupancy UNPAID FEE  10/20/2009 DONE
FIRE-Final Inspection10/5/200910/6/200910/6/2009AFAIL
DetailsTroy Cobbley
The occupant load signs have been mounted and the exit signs, emergency lighting and exit discharge lighting have been verified for functionality. One emergency light and one exit sign need repaired as discussed. See the 10/5/2009 entry for other items needing addressed prior to a final sign off. The relocation of the generator is ok per scott and the fire alarm panel can provide supervision of the primary power at the horizontal sliding doors per Jason Blaise.
FIRE-Final Inspection10/1/200910/5/200910/5/2009PFAIL
DetailsTroy Cobbley
The project related fire sprinkler and fire alarm permits need to be finaled, both of the horizontal sliding doors need to be adjusted so that they easily open manually, the atrium smoke evacuation system needs to be addressed, the exit discharge lighting needs to be removed from control by the photocells and electrical super vision of the horizontal sliding doors needs to be addressed. All of the exit signs, emergency lights and exit discharge lights need to be inspected for placement and tested for functionality after the generator switch over has been repaired. Also need to verify that the relocation of the emergency generator is ok with plan review.
BLD-Final9/17/20099/18/20099/18/2009APEND
DetailsJim Sly
Phone #: ###-#### Internet Inspection Request from: Bryan Herb
Inspection of all rooms except Electr and Elevator..........OK. Verified by (2) letters that (2) approx 5-0x6-0 windows at North side of bldg ....adjacent to double doors are Tempered units. Jambs are covering etching. The Manufacturer...... General glass Co. Portland Ore. ###-#### Work order # 039680 verified glass mentioned above was Tempered. Mid Valley Glass Eugene Ore. ###-#### 9/17/09 Was window Contractor.....Doug Jordon ###-#### was in charge and provided letter mentioned above.
Zoning Approval9/16/20099/16/20099/16/2009 PASS
DetailsAndrea Tuning
BLD-Other9/10/20099/14/20099/14/2009PPASS
DetailsJim Storey
Drop ceiling grid inspection Phone #: ###-#### Internet Inspection Request from: Bryan Herb
BLD-Other8/24/20098/25/20098/25/2009ANR
DetailsJim Sly
suspended ceiling Phone #: ###-#### Internet Inspection Request from: Bryan Herb
BLD-Energy code compliance7/9/20097/9/20097/9/2009PPASS
DetailsJim Sly
Rockwool insulation in mechanical room Phone #: ###-#### Internet Inspection Request from: Bryan Herb
BLD-Energy code compliance7/6/20097/7/20097/7/2009APASS
DetailsJim Sly
Remaining insulation 1st floor. Phone #: ###-#### Internet Inspection Request from: Bryan Herb
BLD-Energy code compliance7/1/20097/2/20097/2/2009APASS
DetailsJim Sly
dining room insulation Phone #: ###-#### Internet Inspection Request from: Bryan Herb
BLD-Wall cover6/30/20097/1/20097/1/2009PPASS
DetailsJim Sly
Kitchen sheetrock nailing Phone #: ###-#### Internet Inspection Request from: Bryan Herb
BLD-Energy code compliance6/29/20096/30/20096/30/2009APASS
DetailsJim Sly
kitchen insulation Phone #: ###-#### Internet Inspection Request from: Bryan Herb
BLD-Framing/Rough-in6/24/20096/25/20096/25/2009APASS
DetailsJim Sly
commercial kitchen fire caulking Phone #: ###-#### Internet Inspection Request from: Bryan Herb
BLD-Framing/Rough-in6/23/20096/24/20096/24/2009APART
DetailsJim Sly
1st floor fire caulking Phone #: ###-#### Internet Inspection Request from: Bryan Herb
All OK...... except Kitchen.
BLD-Energy code compliance6/22/20096/23/20096/23/2009APASS
DetailsJim Sly
2nd floor insulation Phone #: ###-#### Internet Inspection Request from: Bryan Herb
BLD-Energy code compliance6/22/20096/24/20096/22/2009ACANC
DetailsJim Sly
2nd floor insulation Phone #: ###-#### Internet Inspection Request from: Bryan Herb Inspection cancelled from web by: Bryan Herb
BLD-Wall cover6/19/20096/22/20096/22/2009APASS
DetailsJim Sly
3rd floor sheetrock nailing Phone #: ###-#### Internet Inspection Request from: Bryan Herb
BLD-Framing/Rough-in6/17/20096/19/20096/18/2009PCANC
DetailsJim Sly
1st floor fire caulking Phone #: ###-#### Internet Inspection Request from: Bryan Herb Inspection cancelled from web by: Bryan Herb
BLD-Energy code compliance6/15/20096/16/20096/16/2009PPASS
DetailsJim Sly
3rd floor insulation Phone #: ###-#### Internet Inspection Request from: Bryan Herb
BLD-Framing/Rough-in6/15/20096/16/20096/16/2009PPASS
DetailsJim Sly
2nd floor fire caulking Phone #: ###-#### Internet Inspection Request from: Bryan Herb
BLD-Framing/Rough-in6/11/20096/12/20096/12/2009PPASS
DetailsJim Sly
3rd floor fire caulking Phone #: ###-#### Internet Inspection Request from: Bryan Herb
BLD-Framing/Rough-in6/5/20096/5/20096/5/2009PPART
DetailsJim Sly
elevator shaft Phone #: ###-#### Internet Inspection Request from: Bryan Herb
BLD-Wall cover6/3/20096/4/20096/4/2009PPASS
DetailsJim Sly
sheet rock nailing in hallways on all three floors. Phone #: ###-#### Internet Inspection Request from: Bryan Herb
BLD-Wall cover6/3/20096/5/20096/3/2009ACANC
DetailsJim Sly
hallway sheet rock nailing 1st, 2nd and 3rd floors. Phone #: ###-#### Internet Inspection Request from: Bryan Herb Inspection cancelled from web by: Bryan Herb
BLD-Energy code compliance5/29/20095/29/20095/29/2009PPASS
DetailsJim Sly
hallway ceiling insulation Phone #: ###-#### Internet Inspection Request from: Bryan Herb
BLD-Framing/Rough-in5/26/20095/27/20095/27/2009PPASS
DetailsJim Sly
1st floor hallway inspection to pre-rock Phone #: ###-#### Internet Inspection Request from: Bryan Herb
BLD-Framing/Rough-in5/15/20095/15/20095/15/2009PPASS
DetailsJim Sly
inspection for pre rock 2nd and 3rd floor around atrium area Phone #: ###-#### Internet Inspection Request from: Bryan Herb
BLD-Framing/Rough-in2/26/20093/2/20093/2/2009PPART
DetailsJim Sly
A wing int and ext shear inspection Phone #: ###-#### Internet Inspection Request from: Bryan Herb Above items inspected and OK'd
BLD-Framing/Rough-in2/26/20092/27/20092/27/2009APART
DetailsJim Sly
A wing roof. Phone #: ###-#### Internet Inspection Request from: Bryan Herb
"A" wing Roof nailing OK.
BLD-Concrete11/19/200811/19/200811/19/2008PDEFR
DetailsMike Jordan
MTI scheduled as well for inspection at 3pm for rebar in interior footings Phone #: ###-#### Internet Inspection Request from: Bryan Herb. Conc already placed. Noted special insp.
BLD-Foundation10/15/200810/15/200810/15/2008PPART
DetailsJim Sly
elevator walls and porte cachere footings Phone #: ###-#### Internet Inspection Request from: Bryan Herb
OK Pend MTI special insp tests and appr.
BLD-Energy code compliance10/8/200810/10/200810/10/2008APASS
DetailsJim Sly
Foundation insulation Phone #: ###-#### Internet Inspection Request from: Bryan Herb
BLD-Foundation10/2/200810/6/200810/6/2008APART
DetailsJim Sly
Phone #: ###-#### Internet Inspection Request from: Bryan Herb
W. sect of south wall and E. section of North wall OK pending special insp tests and approvals.
BLD-Footing9/29/200810/1/200810/1/2008APART
DetailsJim Sly
Phone #: ###-#### Internet Inspection Request from: Bryan
North and South wall footings OK pending MTI special insp, tests and approvals.
Issue PAID IN FULL permit  7/14/2008 DONE
Ready Permit EXTENDED  4/10/2008  
extend permit to 8-9-08
Telephone call  4/4/2008  
talked to Robert Underwood at ###-#### that permits have expired & he will e-mail an extension letter for bld07-02083, 2082, & 2085..--per Tim Woodard treat these as commercial plans
Print Occupancy Form  1/10/2008 DONE
Print Occupancy Form  1/9/2008 DONE
Permit Ready to Issue  1/9/2008 DONE
PLANS/APPL TAKEN TO FRONT DESK  1/4/2008 DONE
Routing - PLANNING Land Div12/27/2007 12/27/2007 PASS
Final Plat recorded.
Routing - PLANNING12/27/2007 12/27/2007 PASS
DetailsAndrea Tuning
Routing - PLAN CHECK12/3/2007 12/19/2007 PASS
12/19/07 - Plans approved by ICC. Notification provided by e-mail. Pending approval from Land Division and Planning prior to issuance.
Plan resubmittals received  12/11/2007  
received "3" copies from curry arch (3) pages each for comments & "3" sets of plans with each sheet S1.4, S 1.5a, S 1.5b, S1.6, S 1.7, S 1.8a, S 1.8b, S 1.9, S1.10, S1.11a, S1.11b, S1.12, & S2.2, ---plans taken to Marlene Southard
Routing - FIRE11/29/2007 12/3/2007 PASS
Attached updated IFC review comments to plans.
Routing - PLUMBING11/27/2007 11/29/2007 PASS
Rereview based on resubmittals dated 11/8/07 per plans and 2003 upc
Plan resubmittals received  11/27/2007  
Received letter addressed to Marlene and two copies of engineering report for smoke management systems; taken to Marlene S.
Routing - PLANNING11/14/2007 11/15/2007 FAIL
Failed per DRH07-00221. The applicant has not shown the configuration of the proposed parcel exists, Andrea Tuning-###-####;
CUP06-00127 Susan Riggs
Routing - PUBLIC WORKS11/7/2007 11/14/2007 PASS
Routing PW Street Lights11/14/2007 11/14/2007 PASS
Routing PW Sewer Design11/9/2007 11/14/2007 PASS
Routing PW Solid Waste11/14/2007 11/14/2007 PASS
Routing PW Drainage11/8/2007 11/9/2007 PASS
Plan resubmittals received  11/8/2007  
Received 2 copies of response letter from Robert Underwood regarding Plumbing, 2 copies of response letter from Robert Underwood regarding Non-structural, 2 copies of response letter from Dan Green regarding Structural, 2 copies of response letter from Robert Underwood regarding Energy, 2 copies of response letter from Robert Underwood regarding Fire, 4 copies of sheets A0.0, A0.1, A0.2, A0.3, A0.4, A1.1, A1.3, A1.7, A2.1, A2.4, A2.5, A3.1, A3.2A, A3.2B, A3.3, A3.4, A3.5A, A3.5B, A3.6, A3.7, A3.8A, A3.8B, A3.9, A4.0, A7.1A, A8.0, A8.2A, A8.2B, A8.3, A8.9, A9.0, A9.1, A9.2, A9.3, FS1, FS2, FS3, FS4, FS5, FS6, M1.1, M1.2, M1.3, M1.4, M1.5, M1.6, M2.1, M2.2, M2.3, M3.1, M3.2, M3.3, M3.4, M3.5, M4.0, M4.1, M4.2, M4.3, M4.4, M4.5, M4.6, M5.1, M5.2, M5.3, E1.1L, E1.1P, E1.2L, E1.2P, E1.3L, E1..3P, E1.4L, E1.4P, E1.5L, E1.5P, E1.6, E2.1, E2.2, E2.3A, E2.3B, E2.3C, E3.1, E3.2, E3.3, E4.1, E4.2, S0.0, S0.1, S0.2, S0.3, S0.4, S0.5, S1.1, S1.10, S1.11A, S1.11B, S1.12, S1.13, S2.1, S2.2, S2.3, S2.4, S2.5, S2.6, S2.7A, S2.7B, S2.8, S2.9, S3.0, S3.1, S3.2, S3.3, S1.2A, S1.2B, S1.3, S1.4, S1.5A, S1.5B, S1.6, S1.7, S1.8A, S1.8B, S1.9 and inserted into office & issue plans by Robert Underwood 2 copies to go to ICC so those along with a redlined set from ICC were taken to Marlene's desk///11/8/07 BAS
Plan Reviewer's activity  10/25/2007  
redlined reviewed plans from ICC sent to architect
Routing - PLAN CHECK10/3/2007 10/23/2007 HOLD
DetailsMarlene Southard
Plans on HOLD waiting for resubmittals.
Routing - PLAN CHECK8/29/2007 10/23/2007 FAIL
9/10/07 - Routed off site to ICC for review via FedEx. msouthard
10/23/07- Received ICC review and sent copy to architect.
Routing - FIRE9/27/2007 10/3/2007 FAIL
Emailed and faxed resubmittal items to architect.
1st review completed  10/3/2007 FAIL
Plan resubmittals received  9/6/2007 DONE
5 copies of civil drawings C1.0, C1.1, C2.1, C2.2, C3.1, C3.2, C4.1, C4.2, C4.3, C5.1, C5.2 received.
Routing - PLANNING8/29/2007 8/29/2007 FAIL
Failed per DRH07-00221. The applicant has not shown the configuration of the proposed parcel exists, or provided the City with a copy of the recorded cross access agreement Andrea Tuning;
CUP06-00127 Susan Riggs
Routing - PLUMBING8/23/2007 8/29/2007 FAIL
see bld07 02082
Routing - Erosion and Sediment8/22/2007 8/23/2007 PASS
ESC plan approved with attached conditions. Refer to ESC07-00987 as master ESC plan for project.
Routing - PUBLIC WORKS8/16/2007 8/22/2007 FAIL
Routing PW Sewer Rating8/16/2007 8/22/2007 PASS
Routing PW Solid Waste8/16/2007 8/22/2007 FAIL
Waiting on specs of compactor from Arch. to determine if enclosure is correctly sized.
Routing PW Environmental8/16/2007 8/22/2007 PASS
OK, GI noted for kitchen
Routing PW Drainage8/16/2007 8/21/2007 FAIL
DetailsBrian Murphy
depth to groundwater for seepage beds. Velocity thru throat of OS traps
Routing PW Street Lights8/16/2007 8/17/2007 PASS
Routing PW Sewer Design8/16/2007 8/16/2007 FAIL
Easement Required
Routing - PLANNING Land Div8/15/2007 8/16/2007 FAIL
Final plat to be recorded prior to permit being issued. daa/jej
Plans ACCEPTED BY PLAN TECH  8/15/2007  
Plan routing begun/NEW & ADDTN  8/15/2007 DONE
Override - Parcel Holds  8/15/2007  
Recd Pcfee & Taken To Pln CK  8/15/2007 DONE
Application received  8/9/2007