Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD07-02089
StatusFinaled
Name COLLIERS INTERNATIONAL
Site Address 10691 W USTICK RD
Project NameGoins Retail Building
Customer Number 
ePlanReviewNo
Description
(LITTLE CAESARS - GOINS RETAIL BLDG) To build-out a 1,102 sq. ft. portion within an existing 6,300 sq. ft. shell building to be used as "Little Caesars Pick-Up & Take-Out Pizza". Work includes construction of interior sign soffit; divider partitions at kitchen; a Type I Grease Hood/Exhaust Duct system; a new 8' x 12' walk in cooler; accessible customer service counter; suspended ceiling grid system; to relocate an accessible restroom to the front of the tenant space for public access; modify electrical, mechanical and plumbing to meet tenant needs and comply with current adopted codes and ordinances; interior wall and floor finishes and equipment; all per reviewed and approved plans to include red-line comments on plans and all attached plan reviews of all reviewing agencies. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD11/13/200711/13/200712/11/2007 DONE
First Notice has not been responded to.
First Notice 10/17/200711/13/2007 DONE
BLD-Final10/16/200710/17/200710/17/2007PPASS
DetailsJim Sly
dustin Phone #: ###-####
OK for Perm Occ.
FIRE-Final Inspection10/16/200710/17/200710/17/2007APASS
DetailsTroy Cobbley
Life safety passed. The owner is going to remove the duct smoke detectors since they are not required by code and can not be placed correctly.
Permanent Occupancy UNPAID FEE  10/17/2007 DONE
FIRE-Final Inspection10/16/200710/16/200710/16/2007PFAIL
DetailsTroy Cobbley
Need the duct smoke detectors installed and tested. Need the two exit signs repaired.
BLD-Framing/Rough-in10/15/200710/15/200710/15/2007PPASS
DetailsJim Sly
pete - grid inspection Phone #: ###-####
BLD-Framing/Rough-in10/3/200710/3/200710/3/2007PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/3/2007 at 10:18:16 AM. Contact: ###-####.
PLANS/APPL TAKEN TO FRONT DESK  10/3/2007 PASS
Print Occupancy Form  10/3/2007 DONE
Plan resubmittals received  10/3/2007  
received plan review report from brs arch & "2" sheets of G1.O--plans taken to Dan Stuart
Telephone call  10/3/2007  
called ###-#### and told Andrew Davis that permit is ready and fees
Permit Ready to Issue  10/3/2007 DONE
Issue PAID IN FULL permit  10/3/2007 DONE
Plan assigned to (DRS)8/25/2007 10/3/2007 PASS
10/3/2007 07:39:21 DRS - activity updated through activity BLDA022 from case BLD07-02089.
Routing - PLAN CHECK9/28/2007 10/3/2007 PASS
Inserted energy code electrical sheet resubmittals of 10/1/07 into plans. Modified plan review clarifications and attached all documents to plans. Routing to permit desk to issue.
Plan resubmittals received  10/1/2007 DONE
received 1 memorandum and 2 copys of sheets E0.0,E1.0,E2.1MS,E2.1PL taken to Dan S.
Plan Reviewer's activity  9/28/2007 DONE
E-mail to architect and tenant stating status of permit for final approval. I will be out of town to a funeral on October 1st & 2nd.
Routing - PLAN CHECK9/26/2007 9/28/2007 FAIL
Architectural plan sheets resubmitted 9/28/07 inserted into plans and reviewed for code compliance. Plans red-lined and plan review comments modified to reflect clarification by red-line. Architect response to electrical energy code questions deferred same to electrical engineer, Nick Schaffer. Waiting for resubmittals to plan review items #9 & #10 of original 1st review.
Plan resubmittals received  9/28/2007  
Received memo, freezer specs, walk-in cooler specs, two copies of pages G1.0, A1.1, A1.2, A3.1, A4.1, and four copies of page P1.0; taken to Dan Stuart
1st review completed  9/26/2007 FAIL
Routing - FIRE9/21/2007 9/26/2007 PASS
Attached IFC review comments to plans.
Routing - PLAN CHECK8/30/2007 9/20/2007 FAIL
Resubmittals required. E-mailed copy of plan review corrections requiring resubmittals to Andrew Davis, BRS. Routing plans to fire code analyst for review.
Plan resubmittals requested  9/20/2007 DONE
E-mail of plan review and required corrections to Andrew Davis, BRS.
Routing - PLUMBING8/27/2007 8/30/2007 PASS
approved per plan and 2003 UPC
Telephone call  8/29/2007 DONE
Call from Dustin Preece, Little Ceasars, checking on plan review status. Plan just assigned. Have five reviews ahead of his. To call back mid September for better time estimate.
Routing - PUBLIC WORKS8/25/2007 8/27/2007 PASS
Routing PW Sewer Rating8/27/2007 8/27/2007 PASS
Routing PW Environmental8/27/2007 8/27/2007 PASS
All kitchen drainage for this TI route to common grease line to shared GI for shell&core.
Pending Assignment by MYS8/9/2007 8/25/2007 DONE
8/25/2007 13:58:57 MYS - activity updated through activity BLDA168 from case BLD07-02089.
Plans ACCEPTED BY PLAN TECH  8/10/2007 DONE
Recd Pcfee & Taken To Pln CK  8/9/2007 DONE
Application received  8/9/2007